Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
International mineral resource and mineral reserve classification and reporting systemsBy S. Felderhof, W. S. Vaughan
"Over the years, it has been increasingly difficult for the minerals industry to raise the necessary capital for its activities. To alleviate this phenomenon, complete transparency and capital market
Jan 1, 2005
-
Column Flotation Operation at Mines Gaspé Molybdenum CircuitBy V. Coffin, T. Cienski
"(Figure 1) Reagentized pulp enters into the column at about 1/4 of the distance from the top. Inside the column it meets with a downward flowing stream of water and with an upward flowing mass of air
Jan 1, 1981
-
St. Andrew GoldfieldsBy P. Massi
"Wholly owned by the Coniagas Mining Company, the oldest continuously listed mining company on the Toronto Stock Exchange, St. Andrew Goldfields is located on Hwy. 101 approximately 30 miles east of d
Jan 1, 1992
-
Strategic Risk Assessment and Management of Indigenous Issues in the Extractive SectorBy K. Ramji
"The development curve in the extractive sector has become longer, steeper, and riskier due to increased social, legal, and political risks from various stakeholders. Indigenous peoples are a unique s
Jan 1, 2016
-
Enhanced Oxygen Transfer in Gold CyanidationBy Ralph Harris, Xia Qi, Frank Komsic
"Gold cyanidation kinetics which are often limited in commercial operations by the rate of oxygen dissolution from gas bubbles into the slurry, are discussed. Emerging technologies for improving the r
Jan 1, 1996
-
Standard TCP/IP Networks for Mine and Equipment AutomationBy Christoph Mueller
Broad band mine communication today is characterized mainly by individual solutions, which have in common their long development phases and their high cost for development, operation and service. The
May 1, 2002
-
Meeting Recruiting Challenges - Victor ProjectProject Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;
May 1, 2006
-
Dust Control at Granisle CopperBy L. W. Hamel
"DUST CONTROL - GRANISLE COPPER LIMITEDINTRODUCTIONGranisle. Copper Limited is located in the north-central region of the Province of British Columbia, approximately 200 road miles north-west of Princ
Jan 1, 1976
-
The safety imperative—transforming the workplace to protect people (06bb12c8-6d2f-4f7c-beb1-5bcbdcf9392b)By G. Winkel
"Safety conditions in industry have greatly improved over time. However, around the world, in Canada, and in each province or territory, people are still the victims of serious industrial accidents. T
Jan 1, 2004
-
The St-Honoré Carbonatite Complex, QuébecBy Marcel Vallee, Fernand Dubuc
"The St-Honoré carbonatite complex, located 8 miles north of Chicoutimi, Quebec, was discovered in September 1967 as abnormal radioactivity was detected in the course of SOQUEM's aerial surveys. The c
Jan 1, 1970
-
The Environmental Impact of Submarine Tailings Disposal at the Island Copper Mine on Vancouver Island: A Case History in Environmental PolicyBy Patrick Moore
In 1971 the government of British Columbia issued a permit for the Island Copper Mine to commence disposal of 33,000 tons per day of mine tailings into Rupert Inlet, a marine fjord on the northwest co
May 1, 2002
-
Simultaneous Optimization of Ultimate Pit and Production Scheduling Using a Heuristic ApproachBy A. K. Mahto, B. Samanta
"A heuristic model was developed to simultaneously generate the ultimate pit and production scheduling at a mining project. The method consists of a preprocessing step to select a starter pit, the imp
Jan 1, 2017
-
A review of binder materials used in stabilized backfillsBy J Petrolito
"To improve the economic and environmental performance of underground mining operations, it is common practice to return the metallurgical waste material underground as backfill. This is called hydrau
Jan 1, 2005
-
Decommissioning Pits with Ecological EngineeringBy M. Kalin
"Ecological Engineering, a biotechnological approach to the decommissioning of base metal mining wastes, is being tested on two pits (Gloryholes) in Newfoundland, Canada. Pit #2 has an average pH of 3
Jan 1, 1992
-
Follow-up of Production Equipment Availability and its Contributing Factors in Selected Canadian Underground MinesBy Edith Lafontaine
Modern underground mines operate fleets of mobile production equipment including drill jumbos, long-hole drills, load-haul-dump machines, trucks and bolters. Their availability has a substantial impac
May 1, 2007
-
Dust Collection Methods for Primary and Secondary Crushing (NOVEMBER 21, 1975 )By D. Ingram
"PRIMARY DUST COLLECTOR A. 42,000 CFM James Howden Fan Z-6 Size 3650 Fan Dia 40"" HP 75It was found that the fan was not large enough to remove the air that was displaced by the trucks dumping. So it
Jan 1, 1976
-
Nickel production from low-iron laterite ores: Process descriptionsBy R. A. Bergman
"Process descriptions are provided for the following ten plants that treat high-magnesia lateritic nickel ores (saprolite) by pyrometallurgical means: PT Aneka Tambang; Cerro Matoso S.A.; Falconbridge
Jan 1, 2003
-
A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams MineBy David Evans, David Barnes, Robert Raponi
"The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind
Jan 1, 1997
-
In situ acid leaching of copper tailings deposits: A case historyBy C. D. Shackelford, J. F. Muñoz, M. Vauclin, P. Rengifo, A. Suazo
The results of a field-scale study involving in situ leaching of copper ore tailings using sulphuric acid as the leaching agent, injection wells to introduce the leaching solution and extraction wells
Jan 1, 2001
-
Rock Pass Operational Problems in Quebec Underground MinesBy Jean-François Lessard
The performance of rock pass systems has a significant contribution to the economics of underground mines. Operational concerns include hang-ups due to arching of material, blockage and degradation of
May 1, 2002