Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Some Crushing and Grinding Considerations in Plant Design

    By H. A. Steane

    "This presentation will cover some crushing and grinding considerations in plant design and operation. There is nothing basically new in the subject matter presented here; however, the viewpoint and i

    Jan 1, 1976

  • CIM
    Operation of a High-Density Tailings Thickener

    By Ernie Doell, Trung Nguyen

    "In early 1995 Cluff Mining commissioned a newly constructed high density tailings thickener at its Cluff Lake uranium mill. The 85 ft diameter high density thickener is one of the first of its kind i

    Jan 1, 1996

  • CIM
    The POP project (Process Optimization Project) The first applications: Barrick Gold / Est-Malartic; Agnico-Eagle / Laronde; Noranda / Matagami

    By Éric Létoumeau, Julie Fournier, Sylvain Caron, Yves Breau, Martin Plante, Dominique Girard, Luc Tardif, François Robichaud

    "Since 1999, COREM (formerly the Centre de Recherche Minérale) has conducted and coordinated research and development activities for a consortium of mining companies that uses the benefits and advanta

    Jan 1, 2002

  • CIM
    A Two-Phase Backfill Approach to Dilution Control at the Doyon Mine

    By Emilie S. Williams

    The Doyon Mine?s Zone 1 (Altered Zone), found along the southern boundary of the mine, encompasses approximately 20% of the mining reserves. The mineralisation is found in a series of steeply dipping

    Oct 1, 2004

  • CIM
    Achieving Reliability from Data at Cerrejón Coal

    By Gerardo Vargas

    Without an adequate data sample there can be no Reliability Analysis (RA). Without analysis there can be no systematic, verifiable improvement in reliability or in operational economy. A sample is a c

    May 1, 2011

  • CIM
    Optimizing Performance in Heavy Equipment Teleoperation

    By Jean-François Lapointe

    Many advances have been made concerning the automation of heavy equipment teleoperators such as those found in mining. Complete automation, however, is not achieved yet and the operation of these vehi

    May 1, 2001

  • CIM
    The Midas Pond Gold Prospect, Victoria Lake Group, Central Newfoundland: A Mesothermal Quartz Vein System with Epithermal Characteristics

    By Derek H. C. Wilton, David T. W. Evans

    "Abstract - The Midas Pond gold prospect, central Newfoundland, is hosted by sheared and altered felsic and mafic pyroclastic rocks of the Tulks Hill volcanics, Victoria Lake Group, and has been trenc

    Jan 1, 2000

  • CIM
    Concepts for Remote Mineral Projects

    By L. J. Vincze

    The high cost of constructing mineral processing plants in remote locations warrants a close examination of the alternatives available for reducing the amount of on-site construction work. Among the a

    Jan 1, 1980

  • CIM
    Gravity Concentration from Bench Scale to Plant

    By R. O. Burt

    "Gravity Concentration, the oldest form of Mineral Processing, remains of major importance to the Industry. Current applications of Gravity Concentration are briefly examined.The Paper details one app

    Jan 1, 1984

  • CIM
    Application of conditional simulations to resource classification schemes

    By M. E. Rossi, J. E. Camacho

    "Geostatistical conditional simulations are becoming increasingly popular as tools that provide models of uncertainty at different stages of a mining project. They have been used as grade control tool

    Jan 1, 2004

  • CIM
    Comparison of Penzien and Wang analytical methods with the finite difference numerical method in seismic analyses of the Qazvin-Rasht (Kuhin) tunnel

    By F. Hassani, R. Mikaeil, B. Ferdowsi

    Two analytical solutions for estimating the ovaling deformation and forces in circular tunnels are widely used in engineering practice, due to soil-structure interaction under seismic loading. This pa

    Jan 1, 2008

  • CIM
    Sill pillar recovery at the Louvicourt mine

    By D. Fleury

    "This paper describes the challenges of mining a sill pillar under various types of paste backfill quality. From 1994 to 2002, Louvicourt mine produced approximately 12,600,000 t grading 3.5% Cu, 1.5%

    Jan 1, 2005

  • CIM
    The New Red Lake Mine: Narrow Vein Mining in Deep, Burst-Prone Ground

    By Pierre Rocque

    The Red Lake Mine is located approximately 600 km northwest of Thunder Bay. This 545 tpd (600 tons/day) underground narrow vein gold operation is set to produce in excess of 14.8 tonnes (475,000 ounce

    Oct 1, 2001

  • CIM
    Discrete Event Control and Dynamic Scheduling for Tele-Robotic Mining

    By Jamie King

    This paper describes the use of dynamic scheduling and discrete event control to provide coordinated control of multiple automated vehicles. In the past decade there have been significant advances in

    May 1, 2001

  • CIM
    New Support Concepts for Hard Rock Mining Applications

    By Thomas M. Barczak

    A critical safety component for all underground mining is intrinsic and standing support systems. Specifically, tabular hardrock mining exploits a wide variety of deposits that require various metho

    May 1, 2007

  • CIM
    Evidence for the occurrence of Gondwana coals in North America as indicated by comparisons of similar deposits in the world

    By P. A. Hacquebard, M. P. Avery

    "Gondwana coal deposits are widespread and are known to occur in four continents. They are present in Brazil, India, South Africa, and Australia. From coal petrographic examinations and a detailed lit

    Jan 1, 2004

  • CIM
    Stratigraphic and Structural Constraints on Limestone Exploration: A Case Study from Northern New Brunswick, Canada

    By I. Dimitrov, S. R. McCutcheon

    "Industrial-grade limestone is found in both the Lower Silurian La Vieille Formation and Upper Silurian LaPlante Formation of the Chaleurs Group in northern New Brunswick. Currently, between 150 000 a

    Jan 1, 2007

  • CIM
    The Mount Fronsac North Volcanogenic Massive Sulfide Deposit: A Recent Discovery in the Bathurst Mining Camp, New Brunswick

    By G. Graves, J. A. Walker

    "Abstract - The Mount Fronsac North volcanogenic massive sulfide deposit is the most recently discovered massive sulfide body in the Bathurst Mining Camp. The deposit occurs within a sequence of inter

    Jan 1, 2006

  • CIM
    Novel Processes for Treatment of Syncrude Fine Transition and Marine Ore Tailings

    By X. S. Yuan

    With the production increase of Oil Sand in Fort McMurray Alberta, more efficient tailings disposal has become a priority for Syncrude Canada Ltd. A lot of work on tailings research and development ha

    Jan 1, 2006

  • CIM
    The Cigar Lake project — Mining, ore handling and milling

    By 12670

    The Cigar Lake project will develop the world’s second largest high-grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U3

    Jan 1, 2004