Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The relationship between mineralogy and shear strength of Pilbara Hamersley Group shales across the weathering spectrum

    By A Maldonado, A Robert, K G. Mercer

    The Hamersley Group in the Pilbara, Western Australia, consist of interlayered banded iron formation (BIF) and shale host rock formations within which a large number of open pit iron ore mines have be

    Jul 24, 2017

  • AUSIMM
    Practical Hints on Deep Alluvial Mining

    As it is my opinion that deep alluvial mining in Victoria and in the Murray Flats in New South Wales is practically in its infancy, and considering that we, the old school of alluvial miners, who have

    Jan 1, 1901

  • AUSIMM
    Heat Transfer Mechanism in Ignition of Nickel Sulphide Concentrate under Simulated Flash Smelting Conditions

    For small particles of niekel flotation eoncentrate (av. size 50 pm) the predominant heat transfer mechanism under suspension smelting conditions, prior to ignition, is conduction from the gas and not

    Jan 1, 1979

  • AUSIMM
    Innovations and State-of-the-Art Technologies Employed in the Continuous Casting of Slabs and Beam Blanks

    By Zajber A, Kulchen R, Letzel D, Weyer A, Schwellenbach J

    The search for modem casting plant concepts today focuses more and more on the harmonisation and optimisation of overall concept lines to obtain a continuous quality control and reduce the cost of

    Jan 1, 1999

  • AUSIMM
    Environmental Costs (and benefits) of Planning and Developing Mines and Quarries

    The consideration of environmental constraints and issues is a fundamental component of all stages of planning, development, operation and decommissioning mining and quarrying projects. Provision n

    Jan 1, 1990

  • AUSIMM
    The Career of the Gold Dredge in New South Wales

    It is now five years since the advent of gold-dredging in Australia, the State of New South 'Wales, or colony as it was, being the first to adopt this system of gold-getting, and the credit of it

    Jan 1, 1904

  • AUSIMM
    Failure of Aluminum to Prevent Experimental Silicosis

    By King E. J

    Department of Pathology, British Post-graduate Medical School, London:The experiments here recorded were devised and carried -out during the last two years in an attempt to corroborate the important w

    Jan 1, 1945

  • AUSIMM
    Controlling Product Quality at High Production Rates as Applied to BHP Billiton Iron Ore Yandi Fines Operation

    By T Howard, J E. Everett

    BHP Billiton Iron Ore has replaced the conventional product quality control batch system at Yandi with the Continuous Stockpile Management System (CSMS) centred on a fully integrated æcontinuousÆ stoc

    Jan 1, 2002

  • AUSIMM
    Plant and Method of Manufacture of Portland Cement at Limestone Island

    WITH the exception of the deposits of the Milburn Cement Co near Dunedin, Wilson's Portland Cement Co., on the Mahurangi River (a short distance north of Auckland), and those of the New Zealand P

    Jan 1, 1912

  • AUSIMM
    Do All MetPlants Work Well? PlantMets can Ensure They Do

    By P Cameron

    MetPlant conferences have focused on ensuring mining projects are well designed then optimised to operate safely and effectively at the top end of world’s best practice to ensure shareholders are not

    Sep 7, 2015

  • AUSIMM
    Structural Controls on the Localisation of Low-sulfidation Epithermal Mineralisation in West Java, Indonesia

    By J Widjaja, E Hermawan, M Muharam, L Damanik

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The island of Java lies within the Sunda-Banda magmatic arc, which is characterised by mult

    Mar 18, 2015

  • AUSIMM
    Long-term Stability of Mine Tailings, Macraes Mine, Otago: Comparison to a Geological Analogue

    By D Craw

    Bulk ore tailings from the Macraes gold mine gold extraction process are stored in a large (ca 0.6 km2, 80 m deep) mixed tailings impoundment whose pH is maintained near 8 by natural rock neutralizing

    Jan 1, 2000

  • AUSIMM
    Pitfalls in Vezin sampling for finely crushed materials

    By C J. Kruger, E le Roux

    Anglo American Platinum has adopted a strategy of Best Practice Principles (BPP) for sampling, mass measurement, analysis and metal accounting for more than a decade now. When new plants are designed,

    May 9, 2017

  • AUSIMM
    Morphology and Mineralogy of Shallow Submarine Hydrothermal Vents of the Calypso Geothermal Field, Bay of Plenty, New Zealand

    The Calypso geothermal field, mapped by the R V Sonne (cruise SO-135) in 1998, includes four main sites, the Northern Vent Area (centred on 37¦ 36.7'S, 177¦ 06.2'E, area 1.5 km2), Central Ve

    Jan 1, 1999

  • AUSIMM
    Variation in property parameters of iron ore granulated mix with moisture content

    By C Li, D O’Dea, R Moreno-Atanasio, T Honeyands

    The behaviour of iron ore granules in the feeding process of sintering is significantly influenced by the material properties of the granulated mix. Therefore, the measurement of key material properti

    Jul 24, 2017

  • AUSIMM
    Paleodepth Studies of Epithermal Au-Ag Deposits in the North Island of New Zealand û Progress Toward a 4D Model

    By R L. Brathwaite

    Previous paleodepth studies of low-sulphidation epithermal Au-Ag deposits in the Coromandel region indicated that economic gold mineralisation was generally limited to a depth zone of 100 to 400 m bel

    Jan 1, 2003

  • AUSIMM
    Mine Site Environmental Management and Sustainable Post-Mining Land Use in New South Wales, Australia

    The Department of Mineral Resources has a statutory responsibility for mine site environmental management and control in New South Wales. The Department is focusing on an environmental management syst

    Jan 1, 2002

  • AUSIMM
    A Convenient Method for Survey of Stopes and Development

    THE most important part of the routine survey work on a mine is the keeping up-to-date of plans and sections showing progress of stoping and development work, and the direction of the latter for the p

    Jan 1, 1928

  • AUSIMM
    Introducing HPGR quaternary crushers in a Russian magnetite operation – challenges and solutions

    By B C. Povey, K Lagutin, M Mryasov, V Noll

    The current Stoilensky magnetite concentrator comprises a three-stage crushing circuit followed by three stages of ball milling, grinding and concentration to produce a magnetite concentrate with 66.5

    Sep 11, 2017

  • AUSIMM
    Integrating Bulk Ore Sorting into a Mining Operation to Maximise Profitability

    By P Holtham, K Duffy, W Valery, A Jankovic

    As high grade ore deposits are depleted, remaining deposits are generally lower grade and require the mining and processing of larger volumes of material per tonne of product. These low grade deposits

    Sep 7, 2015