Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Relationship between the Width of Strip Pillar Yield Zone and Recovery Ratio

    By Wenbing Guo

    The stability of strip pillar is the key to successful strip pillar mining. In analyzing the stability of the strip pillar, the width of yield zone must be determined. The determination of the width

    Jan 1, 2006

  • SME-ICGCM
    Some Thoughts on Calibrating LaModel

    By Keith Heasley

    In many practical situation where the LaModel program in used to analyze the mechanical response and failure of the mining environment, there are very few actual field measurement from the site availa

    Jan 1, 2008

  • SME-ICGCM
    Ultra-Close Multiple-Seam Mining ? Analysis and Verification

    By Daniel W. Su

    This paper presents the results of a detailed geotechnical study on the potential multiple seam interaction between the No. 2 Gas (upper) and the Powellton seams, which are separated by an average int

    Jan 1, 2012

  • SME-ICGCM
    Advancements in the Use of High-Modulus Polymer Mining Grids to Speed Longwall Recovery

    By Thomas A. Bailey

    Since the advent of longwall mining, various methods and materials have been used during relocation to control the intrusion of the gob in the shield/panline area. (figure 1) Controlling this gob is c

    Jan 1, 2006

  • SME-ICGCM
    Multiple Seam Mining Interactions ? A Case Study

    By Khaled Morsy

    The studied mine extracts the Sewickley seam using room-and-pillar method. The overburden at study site ranges from 400 to 800 ft. Eight years earlier, the Pittsburgh seam was mined 80 ft underneath t

    Jan 1, 2006

  • SME-ICGCM
    Roadway Strata Management in the New South Wales Underground Coal Mining Industry

    By Rob Thomas

    Strata management is a critical and now necessary requirement in the New South Wales underground coal mining industry. As a formal and structured process, strata management allows ground supp

    Jan 1, 2007

  • SME-ICGCM
    Comparison of the Mark-Bieniawski and Wilson Pillar Equations Using Site Specific Data

    By Vincent Scovazzo

    This paper compares the two most common pillar design equations used worldwide by John T. Boyd Company; the Mark-Bieniawski Equation, an empirical approach, and the Wilson Equation, an analytical appr

    Jan 1, 2008

  • SME-ICGCM
    The Origin and History of U.S. Mine Resin

    By Carl Tom Blevins

    Resin was first introduced to U. S. mines in 1971 and first produced in 1973. The original polyester roof bolt resin was very expensive and limited to a single cartridge size and a single slow gel ti

    Jan 1, 2006

  • SME-ICGCM
    Multiple Seam Mining Interactions: Case Histories from the Harris No. 1 Mine (b50cab1b-ba36-4377-a652-1d452c62f433)

    By Frank E. Chase

    The Harris No. 1 Mine, located in Boone County, WV, has been longwalling the Eagle Coalbed for over 30 years. Harris has experienced numerous interactions associated with the extensive room-and-pillar

    Jan 1, 2005

  • SME-ICGCM
    Stability Mapping as a Tool for Production Planning at Bowie No. 3 Mine

    By Collin Stewart

    Bowie Resources, LLC (Bowie) has been using the Stability Mapping System (SMS) developed by Dr. Keith Heasley, West Virginia University, since 2005. Seven three-entry longwall gateroads, four longwall

    Jan 1, 2007

  • SME-ICGCM
    Coal Mine Geology in the U.S. Coal Fields: A State-of-the-Art-Review

    By Frank E. Chase

    During the past quarter century, coal mine geologists have evolved from providing a qualitative description of drill core and coal reserves into quantitative geotechnical specialists who bridge the ga

    Jan 1, 2006

  • SME-ICGCM
    Sublevel Caving Mining Method for Extra-Thick Coal Seams

    By H. Nan

    Using the case of Qianqiu Mine, Yima Coal Mining Administration, theoretical analysis, laboratory physical simulation, and underground observation were performed to study the major parameters for full

    Jan 1, 2006

  • SME-ICGCM
    Yield Pillar Applications--Impact On Strata Control And Coal Production

    This paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.

    Jan 1, 1984

  • SME-ICGCM
    A Resin Quality Testing Procedure for Collieries

    By D. Minney

    The quality of resin used in South African collieries is currently controlled according to South African Bureau of Standards, "SABS-1534:2002". It has however been found that resin which passed the SA

    Jan 1, 2005

  • SME-ICGCM
    Mitigating Longwall Subsidence Effects on a Large Industrial Building

    By Yi Luo

    The efforts to mitigate longwall subsidence influences on various residential and farming structures by many coal mining companies have been successful in the recent years (Luo, et al, 2003). The succ

    Jan 1, 2005

  • SME-ICGCM
    Field Measurements of Overburden and Chain Pillar Response to Longwall Mining

    By Daniel W. H. Su

    Current longwall pillar design relies heavily upon past experience and many assumptions about pillar and entry response to longwall abutment pressures. Caving characteristics of the immediate and main

    Jan 1, 1987

  • SME-ICGCM
    Multiple-Seam Inter-Burden Stress Distribution Using Strip-Pillar Mining Method

    By Jin He

    Based on the simple-beam theory, a stress analysis model was established for undermining in multiple seam strip-pillar mining when the strip pillars were not columnized; the effects of various mining

    Jan 1, 2006

  • SME-ICGCM
    Horizontal Stresses and Their Impact on Roof Stability at the Nelms No. 2 Mine

    By J. B. Lizak

    This paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.

    Jan 1, 1984

  • SME-ICGCM
    The Initial Collapse of the Overburden Over Longwall Panels

    By Gennaro Marino

    Documented case histories are studied where data were found on the initial collapse of the overburden above the longwall panels. Under this scenario, the most controlled conditions exist for assessing

    Jan 1, 1987

  • SME-ICGCM
    Presented at the 25th International Conference on Ground Control in Mining

    By David Dye

    Good morning, everyone, and thanks Syd for that fine introduction. I am honored to be here to help you celebrate 25 years of advancement and success in the important field of ground control. I wou

    Jan 1, 2007