Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    An Explosive Delivery System implementation in the Steep Gullies at the Arapahoe Basin Ski Area

    By Mark Bosse

    This is a paper demonstrating the use of a fixed wire and trolley system to deliver 2 or 5 lb cast primers (with 2 meter cap/fuse assemblies) deep into avalanche terrain. This avalanche terrain is mi

    Feb 1, 2020

  • ISEE
    Displacement and Mixing of Blasted Sedimentary Rocks in Quarrying

    By Stephen Chung, John Carpenter, Scott Gosch, James Breedlove

    While controlling fly rock and ground vibration in quarrying in the neighborhood of a residential area, producing good fragmentation and keeping different grades of material separated in a muckpile ar

    Jan 1, 2001

  • ISEE
    Improvements to Blast Performance by Use of a Low-Density Emulsion at Barrick Goldstrike's Meikle Mine

    By Tony Francelj, D. Scott Scovira, Remi Proulx

    The Meikle Mine is a high-grade, underground gold mine that utilizes a primary and secondary stoping method with delayed backfill. The newly developed Rodeo Mine will start production using similar mi

    Jan 1, 2002

  • ISEE
    Digital Shock Tube

    By Theirry Bernard

    The era of non-electric systems as an initiating system has revolutionised the blasting world by introducing a very safe initiating system that is reliable, with initiation sequence possibilities that

    Jan 1, 2007

  • ISEE
    Diamonds are a Driller's Best Friend

    By Langdon T. Mitchell, Karl Ingmarsson

    The title is not referring to jewelry; nor is it about diamond core drilling. This article is instead about an emerging application for diamonds, hard rock percussive drilling with diamond drill bits.

    Jan 1, 1999

  • ISEE
    Analysis of Sympathetic Detonation in Detonating Cord

    By Josh Calnan, Paul M. Holmgren, Abigail N. Styer

    Detonating cord is a staple of the explosives industry, used widely in the civil and defense industries. Detonating cord is a thin, flexible plastic tube filled with pentaerythritol tetranitrate (PETN

    Feb 1, 2020

  • ISEE
    Underground Blast Monitoring and Rock Mass Anisotropy

    By Jody Todd, Ernesto Villaescusa, Ronald Lachenicht, Kelly Fleetwood

    In the underground environment, characterisation of a rock mass during the mining cycle becomes increasingly difficult due to a lack of rock mass exposure for measurement or observation. In most cases

    Jan 1, 2008

  • ISEE
    Fragmentation Mill Throughput Improvement Through a Dual-Salt Sodium Nitrate Emulsion Product

    By Khushaal Popli, Vanessa Roeland, Brian Hall, Carl Diederichs

    Highland Valley Copper (HVC) has embraced an integrated Mine to Mill approach to comminution since the late 1990s. Previous blasting optimization was carried out through adjustments to blast pattern g

    Feb 6, 2023

  • ISEE
    Aquarium Tests to Study the Detonation Behaviour of a Non-ideal Explosive.

    By M. Araos

    Non-ideal explosives can be characterised by different methods like velocity of detonation measurement, double pipe tests, underwater tests, aquarium tests, etc., to name a few. Both aquarium and velo

    Jan 1, 2024

  • ISEE
    Slope stability through the application of low-energy explosives technology

    By Jorge Cárdenas, Diego Gamarra

    In previous phases of the mine, a landslide resulted in several losses in production delays. The stability of slopes in a mining operation is critical for the sustainability of the operation, as they

    Jan 21, 2025

  • ISEE
    GEM (Geologic Element Motion) Blast Heave Modeling with More Element Shapes and Energy Partitioning

    By Stewart A. Silling, C. Mick Lownds, Dale S. Preece, Ali Bhuiyan

    GEM (Geologic Element Motion) is a Distinct Element Method (DEM) for modeling blast-induced heave. It was developed with a very fast computational algorithm that efficiently treats many different elem

    Feb 6, 2023

  • ISEE
    "Optimized Energy Distribution in Bench Blasting Through Measurement Techniquesand “Multi Energy” Explosives"

    By Pierre De Pasquale, Gilles Jauffret, Ricardo Chavez

    "When blasting in quarries or mines, the main source of inconsistent results is directly related to thenon-homogeneous energy distribution through the rock-mass volume. This variation has differentori

    Jan 1, 2016

  • ISEE
    Challenges and Lessons Learned from the Kentucky Lock Project

    By K. Best, D. Conn

    The US Army Corps of Engineers KY Lock Project in western Kentucky presented the blasters and vibration consultants with a set of unique challenges. The blasters on this project were faced with diffic

    Jan 1, 2024

  • ISEE
    Valdez, Alaska Glacier Point Quarry – One Shot / One Chance for Success

    By Billy Rosseau, Mike Cammack, Richard O’Meara, Gustavo Azpilcueta

    During the summer of 2014, the U.S. Army Corps of Engineers (USACE) sought proposals to vastly improve and expand the small boat harbor in Valdez, Alaska. It would be a multi-year project, and constru

    Jan 1, 2017

  • ISEE
    The Specifications said No Blasting

    By Timothy Fogarty, Gregory Poole, Roger Reeder, David Switz

    This project involved the construction of a new pump station and intake structure at an existing water treatment facility. Although the project involved a significant amount of rock removal, the speci

    Jan 1, 2012

  • ISEE
    Demolition Blast of Heavily Reinforced Concrete Slab on Impermeable Layer

    By Ye Yuan, Jaak Daemen, Shaguo Yuan

    ABSTRACT: A 400m2 (480 yd2) heavily reinforced high-strength concrete slab 800mm (31 inch) thick had to be demolished. Underneath it was a 300mm (12 inch) thick underlying structure consisting of thre

    Jan 1, 2010

  • ISEE
    Drilling & Blasting of a Small Diameter Shaft Next to Historic Structure

    By Corry Goumans, Ron J. Elliot

    This paper discusses the challenges encountered in drilling and blasting of a small diameter shaft underneath a parking garage in historic Gastown, Vancouver, BC. This project involved drilling in a r

    Jan 1, 2004

  • ISEE
    Explosive Operations for Constructing a Tunnel Based PCB Collection System

    By Gerard McAlinden, Daniel Frost, Patrick McAlinden, James McAlinden

    In an effort to recover Polychlorinated biphenyls (PCB’s) that had leached into bedrock below the Hudson River in Upstate New York, a shaft and tunnel complex was designed that would allow installatio

    Jan 1, 2010

  • ISEE
    Vibration Criteria for Surface Mine Blasting: Ten Years after Bureau of Mines R1 8507

    By David E. Siskind

    In the early 1980's, the Bureau of Mines published four reports of structural response and damage from surface mine blasting, vibration monitoring, and analysis methods. These findings replaced simple

    Jan 1, 1991

  • ISEE
    Methane-air Mixture Air-blast Approximated Using Detonating Cord in Rock Dust Dispersibility Studies

    By BruneJurgen F., Richard C. Gilmore, Matthew Schreiner, Ray Johnson

    Explosive pockets of methane-air mixtures accumulate in underground coal mines and, when ignited, produce an air-blast wave that can disturb combustible coal dust on the floor, roof, and ribs. To prev

    Jan 1, 2019