Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Borehole Geophone Method for Estimating Tunnel Blast Vibration Propagation
By Kyle Ott, Bernard Daly, Syed Haq, Douglas Anderson, Parsons Brinckerhoff
Drill and blast was determined to be the most cost-effective means of excavating the Raw Water Tunnel (RWT) for the Croton Water Treatment Plant in the Bronx, New York City. One of the major issues co
Jan 1, 2012
-
A Practical Approach to Managing Control of Flyrock
By Simon St. John Tose
We have had a long history in supporting the development of training material to ensure “safe” blasting. This has been provided as both significant technical guidance to the industry and input into th
Jan 1, 2013
-
Selection of Powder Factor in Large Diameter Blastholes (9dd28d4c-e692-46ff-9e71-b2043e0b42a0)
By Jack Eloranta
This paper documents the relationship between material handling and processing coete compared to blasting cost. The old adage, "The cheapest crushing is done in the pit", appears accurate in this c!as
Jan 1, 1995
-
The Effect of Confinement on Ground Vibration Amplitude
By Jay Rodgers
There has been a longstanding acceptance that burden plays a major role in the magnitude of ground vibration amplitudes generated from surface blasting. Much of the data that this belief is based upon
Jan 1, 2003
-
Soil Improvement by Blasting Part II
By Wade A. Narin, James K. Mitchell
Hydroblasting is considered a distinct soil improvement technique from explosive compaction, though the blast designs for the two techniques are similar. Hydroblasting is a three step process develope
Jan 1, 1995
-
Mini-Bench Blasting Applicability at the Excavation for Foundation in Settlement
By Sadettin Bagdatli, Ali Kahriman, Umit Ozer, Alper Celtikci, Yucel Karakus
Due to population growth and rapid urbanization in Turkey, the need for the construction of residential units, transportation and infrastructure facilities has become increasingly more pressing. Since
Jan 1, 2014
-
Determination of Blast Vibration Limits by Direct Strain Measurement
By Adrian Moore, Alan Richards, Andrew Brodbeck
Structural blast vibration limits should be based on the strength of the structure, the stress induced by blasting, and a responsible factor of safety. In this paper a methodology that uses direct str
-
Blasting a New Entrance to Carroll Cave
By Paul Worsey, Dave McCool, Ryan Freeman, Chris Wolters, Rick Hines, John Bowles
Carroll Cave, located in Camden County, in south central Missouri, is one of the most significant caves in Missouri with over 12 miles of mapped passages and over 100 known but unmapped side passages.
Jan 1, 2003
-
Positioning of Mobile Mining Equipment Using GPS Technology & Mining and Information, Defining the Need
"AQUILA Mining Systems Ltd. is a Canadian company that designs and develops monitoring, control and navigation systems for the surface and underground mining industries. In 1992, AQUILA Mining Systems
Jan 1, 1997
-
Blasting Results Compared Using Crusher Powder Consumption and Tonnage of Rock Produced
By Ron Glowe
This paper shows the potential of a new computer model, using the Glowe-Tech (GT) Tonnage Analyzer program to compare drilling and blasting results. This model uses the crushers and conveyors as measu
Jan 1, 2005
-
Laser Profiling and Computer Aided Blast Design using the Criterion Survey System and Win-Profile Analysis Software (b3a04a88-253a-4339-a3ec-70b988aee07d)
By Steve Colburn
The CRITERION Survey Systems utilize both theodolite mounted and hand held reflectorless distance meters. These are eye safe, easy-to-use, and specifically designed to endure the harsh environments ch
Jan 1, 1997
-
Investigation into Monitoring of Initiator Performance
By Charles Deacon
The mining industry is constantly taking greater cognisance of their operating costs as a strategy to counter the effects of falling commodity prices. As a result, optimal operating efficiency is more
Jan 1, 2000
-
Trench Blasting Guidelines & Pitfalls
By Vic Sterner
As cities and towns continue to grow, the need to install sewer, water, gas and other utilities becomes a necessity and the blasting of trenches for these service lines probably constitutes one of the
Jan 1, 2004
-
High Resolution Seismic Refractin Temography for Determining Depth of Blast Induced Damage in a Mine Wall
By J A. Singer, S R. Iverson, C A. Link
High resolution seismic refraction tomography has proved to be a useful tool to effectively estimate depth of blast induced damage in a mine face. Excavation blast damage can be as shallow as 1 to 2m
Jan 1, 2009
-
The Effects of Short Delay Times on Rock Fragmentation
By Joseph Nawrocki, Margaret Hettinger, Dr. Catherine Johnson
"Optimized rock fragmentation is essential for minimizing downstream costs to mining operations.Photographic fragmentation analysis, vibration monitoring, and high-speed video all providemeasurements
Jan 1, 2016
-
Blast Master Plan: the Key to efficiency and optimization. Case study at Ellatzite copper mine.
By Grigor Mishev, Georgi Petrov, Benjamin Cebrian
Before designing a single blast or all the blasts on a pit level, it is critical to assess the main goal on each. To do this, a series of constraints must be taken into account: wall protection, vibra
Jan 1, 2016
-
A Case Study of Near-Field Vibration Monitoring, Analysis, And Modeling
By Tamara Whitaker, James Gunderson, Ruilin Yang
This paper presents the results of a vibration control project conducted in soft overburden at a surface coal mine located in the western United States. The study uses near-field blast vibration monit
Jan 1, 2008
-
Blast Design and Diagnostics Using, Portable Solid State, High-Speed Videography Systems
By Laura Bustemante, Bruce Vandenberg, Fred Huettig
Recent advances in solid-state, field portable, fast framing video camera systems and PC based frame capture hardware now allow blast imaging up to 1000 frames per second. Up to 8 seconds of data can
Jan 1, 1998
-
Journal: 100 Years / THE ST. MARY’S PARK TUNNEL, N.Y.C. & H.R.R.R.
By Robert Hopler
As a part of the depression and rectification work on the Port Morris branch of the Harlem Division of the New York Central & Hudson River Railroad, a short tunnel is being driven under St. Mary’s Par
Jan 1, 2006
-
The Assessment of Environmental Impacts of Blasting During The Construction of A Metro Tunnel
By Ali Kahriman, Abdulkadir Karadogan, Umit Ozer, Mehmet Aksoy, Kagan Ozdemir, Adiguzel Deniz
This paper presents the results of ground vibration measurements induced by blasting during the construction of the Istanbul Kadiköy-Kartal metro tunnel which has been driven at a depth of approximate
Jan 1, 2007