Case Study: MGM Casinonational Harbor, Washington, DC Displacement Cast-In-Place Piles in Coastal Plain Soils
By Karl A. H iggins, James P. Racine
"Displacement Cast-in-Place (DCIP) piles are not a common deep foundation type in the Washington, DC Metro Area market. As a result, less regional data is available for these foundations compared to o
Jan 1, 2017
-
Deep Foundation Design For Liquefaction Induced Lateral Spreads
By Zia Zafir
Design of the deep foundations for the loads imposed by lateral spread include the estimate of the pressure applied by the liquefied material as well as amount of anticipated displacement. In the abs
Jan 1, 2006
-
Prediction Of Jet Grout Column Diameter In Cohesive Soil
By Chu E. Ho
Current methods of determining jet grout column diameters are highly empirical and site specific, and do not take into account the jet hydrodynamics and soil parameters explicitly. A theoretical model
Jan 1, 2006
-
A Theoretical Study Of Underpinning Of Rigid Circular Foundations By Piles ? Synopsis
By M. Makarchian
Existing buildings sometimes experience excessive settlement under their design loads, or due to increased foundation loading, if a change of building use is required. One of the oldest and widely num
Jan 1, 1996
-
Pile Load Test On 1200 Mm Dia Pile In Cemented Soil - Synopsis:
By B. Ramanathan
The results of a pile load test on a 1200 mm dia and 25 m long bored Cast-in-situ pile in soft rock is reported. The subsoil has a high N value of above 60 from 7 m to 21 m. The soft rock was observed
Jan 1, 1996
-
Current State Of Practice Of Corrision Protective Systems For Tierods And Tiebacks Used In Marine Applications ? Introduction
By Thomas A. Printz
The wide use of carbon steel in construction and engineering projects makes this engineering material accountable for approximately 85% of the total annual steel production worldwide. Despite the lac
Jan 1, 2013
-
Static Alternating Cyclic Horizontal Load Tests On Driven Steel Pipe Piles Of Foundations For Highway Bridges
By Kouichi Tomisawa
Two bridges were constructed for extension work of Central Hokkaido Connection Road in 2005 at two different sites. Pile group foundations were employed for the foundations of abutments of the two bri
Jan 1, 2006
-
The Synergy Between Theory And Practice In Geo-Engineering
By Bas R. Hemmen
GeoBrain is a facility at GeoDelft with the purpose to provide society with all relevant geo-engineering knowledge and experience in a structured way. On the basis of the available knowledge and exper
Jan 1, 2006
-
The Use of the Expander Body with Cast in Situ Piles in Sandy Soils
By Mario A. Terceros H., K. Rainer Massarsch
"ABSTRACTThe Expander Body (EB) technology has been used successfully to increase the pile toe capacity of bored piles in loose to medium dense soil. An important advantage of the EB system is the abi
Jan 1, 2014
-
Displacement Dependent Stiffness And Damping Constants Of Pile Groups
By Shamsher Prakash
Equivalent spring constants for analysis of footings is a function of Young's modulus of pile material (Ep), shear modulus of soil (Gs), and geometry of the footing and/or piles. Shear modulus is
Jan 1, 2002
-
Capacity Of Driven Piles In Sand
By Mohab Sabry
Pile foundations are used extensively around the world to support both inland and offshore structures, including important structures such as nuclear plants and oil drilling platforms. The limit of th
Jan 1, 2006
-
Dynamic Pile Testing - The Caltrans Results - Dynamic Pile Testing - Who Needs It?
By G. G. Goble
Dynamic pile testing is now over 20 years old as a routinely applied tool for evaluating driven pile installation. The first test on a cast-in-place pile was performed more that 15 years ago. The rese
Jan 1, 1993
-
Non-Destructive Testing Of Drilled Shafts and CFA Piles – Current Practice and New Method
By George Piscsalko
"Quality control of drilled shafts and CFA piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult or not possible to fully inspect the shaft prior to
Jan 1, 2014
-
Design Of Cooper River Bridge Foundations
By Osama Safaqah
The new Cooper River Bridge will replace two existing bridges along U.S. Highway 17. The cable-stayed bridge will be one of the largest in the U.S and will connect the City of Charleston and the town
Jan 1, 2005
-
Ultimate Skin Friction Of Single Batter Piles In Sand ? Synopsis
By A. M. Hanna
This paper presents the experimental investigation on the ultimate skin friction of batter piles. The model piles were pushed in medium dense sand deposits at different inclinations up to 30 with resp
Jan 1, 2010
-
Three-Dimensional Numerical Modelling of Load Distribution and Settlement of Pile Groups
By Onur Kacar
A numerical approach has been implemented to assess the settlements of pile groups bearing in clay. A three-dimensional finite element program has been utilized to model a vertically loaded spread foo
Jan 1, 2018
-
"Comparative Pile Load Tests In Alluvial Sands" - I. Introduction
By Lawrence F. Johnsen
In 1989, the Connecticut Department of Transportation authorized the evaluation and design for a reconstructed Route 1 bridge over the Quinnipiac River in the City of New Haven, Connecticut. The proje
Jan 1, 1993
-
Helical Piles With Grouted Shafts - A Practical Overview
By Gary L. Seider
Helical screw piles are used in various applications including the underpinning of distressed foundations and as deep foundations for new structures. At present, maximum design loads range between 12.
Jan 1, 2003
-
Caisson Foundation For High Speed Paper Machine ? 1 ? Introduction
By Anthony H. Tawil
Modern, high-speed machines used in the manufacture of paper require foundations with stringent settlement constraints. To fulfill this requirement, caisson piles, extending into bedrock, were selecte
Jan 1, 1987
-
PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History
By Chris D. Shewmaker
So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po
Jan 1, 2004