Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Constrained Multivariable Control of a Pilot Flotation Column at the Laronde Concentrator

    By D. E. Calisaya, É. Poulin, A. Desbiens, R. del Villar, A. Riquelme

    "A 15 cm diameter by 732 cm height, fully automated pilot column was installed in the Agnico-Eagle’s Laronde concentrator (Québec), for evaluating the performance of newly developed sensors and advanc

    Jan 1, 2012

  • CIM
    The use of near surface materials in gold exploration Kirkland Lake area, Ontario

    By V. N. Rampton, C. F. Gleeson

    "Exploration results over three overburden drilling anomalies defined by the Ontario Geological Survey in 1981 in the Kirkland Lake area, Ontario are presented. The anomalies come from lowland areas w

    Jan 1, 1987

  • CIM
    Canatuan Cu/Zn Flotation Metallurgy - Dealing with Zinc Pre-Activation

    By C. V. Umipig, G. G. Hutalle, E. E. Israel

    TVI Resource Development (Phils) Inc. Canatuan mine is a polymetallic ore deposit located in the Province of Zamboanga del Norte on the island of Mindanao in the Philippines. The deposit consisted of

    Jan 1, 2012

  • CIM
    Advances in Cobalt Processing

    Cobalt mostly occurs as a minor, but valuable, constituent in most nickel and a few copper ores, however it is not generally found alone in commercially viable deposits. Its concentration and extracti

    May 1, 2009

  • CIM
    Design, Construction, and Start-up of Stillwater Mining’s East Boulder Concentrator

    By P. Lefebvre, J. Sargent, K. Major, B. Darnton

    "Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin

    Jan 1, 2003

  • CIM
    Discrete event control and dynamic scheduling for tele-robotic mining

    By T. Norvell, R. Gosine, S. O’Young

    "This paper describes the use of dynamic scheduling and discrete event control to provide coordinated control of multiple automated vehicles. This work has been carried out within ongoing research int

    Jan 1, 2003

  • CIM
    Significant Canadian Developments in Mineral Processing Technology 1961-2011

    By J. E. Nesset

    "I had been requested earlier this year by MetSoc, our sister society of CIM, to contribute a chapter on technical developments in Canadian mineral processing over the past 50 years to their 50th Anni

    Jan 1, 2012

  • CIM
    Variable speed SAG milling

    By M. N. Brodie

    "The ability to adjust the speed of a SAG mill offers benefits to the process and to equipment maintenance. It can be provided with some slight effect on availability ranging from somewhat enhanced to

    Jan 1, 2003

  • CIM
    Humus and till geochemistry over the Doyon, Bousquet and Williams gold deposits

    By C. F. Gleeson, D. G. Sheehan

    "The results of humus and overburden geochemical surveys over the Doyon, Bousquet and Page-Williams gold ore deposits are presented.These studies show that humus sampling for gold gives negative resul

    Jan 1, 1987

  • CIM
    Geomechanical Studies of an Alpine Rock Mass

    By Tiziana Apuani

    The study refers to an area of about 70 km2, extended in the Italian Central Alps along the the San Giacomo Valley where different civil and mining works are present The regional geological setting is

    May 1, 2009

  • CIM
    Innovative use of SMART Cable Bolt Data: Numerical - Back Analysis for Interpretation of Post Failure Rock Mass Properties Post-

    By Jason J. Crowder

    Presentation Outline ? Introduction ? Costs of ground support and rehabilitation ? Why post-failure rock mass properties are necessary ? The Rock Mechanics Problem ? Present State of Modelling a

    May 1, 2006

  • CIM
    Underground Milling of Uranium Ores

    By Chuck Edwards

    "Cameco operates the high-grade McArthur River uranium mine in northern Saskatchewan, and is constructing the high-grade Cigar Lake uranium mine. Cameco has studied the concept of underground milling

    Jan 1, 2007

  • CIM
    Automating Delay Reporting to Deliver Effective Maintenance

    By Shaun Booth

    Automating Delay Reporting to Deliver Effective Maintenance Corporate Background: Technology Company: Matrikon Inc. Global software and service provider of Information Technology and Control Solut

    May 1, 2003

  • CIM
    Enterprise Optimization Releasing Value Through Better Planning Decisions

    By Gerald Whittle

    What is Enterprise Optimization? Releasing value through better planning decisions: Philosophy, Methodology, Software The key to 5% -35% increase in enterprise value (NPV) The culmination of 25 yea

    May 1, 2010

  • CIM
    Explosions in Mines ? Systematic Failure

    In some parts of the world explosions in mines are more commonplace events. Even in the more developed nations explosions have occurred in recent times. In some cases these mines have significantly lo

    Aug 1, 2013

  • CIM
    Settlement of Tailings Slurries by Creep Compression

    By J. Don Scott

    Analytical predictions of the rate and magnitude of settlement of deposited oil sands tailings slurries generally overestimate how fast pore pressures will dissipate. Field deposits of nonsegregating

    May 1, 2004

  • CIM
    The Sampling System of Courier 300 Analyzer

    By Tapio Leskinen

    "l. IntroductionA reliable sampling system is the basis for an on-stream analyzer. This was realized in Outokumpu company when the development work of the Courier 300 On-Stream X-ray analysis system w

    Jan 1, 1976

  • CIM
    Mineral processing, research and development projects in Nova Scotia conducted through the Canada/Nova Scotia Mineral Development Agreement

    By D. M. Doyle, P. J. Hannon

    "The Canada/Nova Scotia Mineral Development Agreement (M.D.A.) is a subsidiary of a five-year Economic and Regional Development Agreement, signed on June 11, 1984. The objectives of the M.D.A. are to

    Jan 1, 1987

  • CIM
    Synergie Production ? Maintenance par le soins des équipements (SDE)

    By Yves-Laurent Turcotte

    Notre conférencier, Monsieur Yves L. Turcotte, Vice-président et Directeur général chez Promaintech Novaxa est diplômé en génie industriel de l?Université du Québec à Trois-Rivières et détient une maî

    Feb 1, 2008

  • CIM
    Cobre Panama

    By Ian D. Pirie

    Presentation outline ?Project location ?Geology ?Resources and reserves ?Results of the FEED study ?Social and environmental considerations ?Project path forward

    May 1, 2010