Search Documents

  • SME
    Earth Pressure Balance Tunneling In Canada

    By Laura McNally

    In 2006, McNally International Inc., in a joint venture partner-ship with Aecon Constructors, was the successful bidder on two York Region Tunnel Projects: the Bathurst Collector/Langstaff Trunk Sewer

    Jan 1, 2008

  • AUSIMM
    Role of Raw Materials in Various Methods of Iron Production

    Raw materials account for over 60 per cent of the cost of hot metal production in classical blast furnaces and the principal cost component is cost of coke. Dependence on coke is a traditional weakn

    Jan 1, 1999

  • DFI
    Seismic Hazards Evaluation and Lateral Pile Design in Diatomaceous Earth

    By Arash Khosravifar, Matt Steffan

    An expansion of the City of Klamath Falls Wastewater Treatment plant required geotechnical seismic hazard evaluations and deep foundation design. The site is located on the shore of Lake Ewauna and is

    Jan 1, 2018

  • SME
    Design Methodology, Testing And Evaluation Of A Continuous Miner Cutterhead For Dust Reduction In Underground Coal Mining

    By B. Asbury, M. Cigla, C. Balci

    The Western Mining Resource Center (WMRC) at the Colorado School of Mines (CSM) received a grant from the National Institute for Occupational Safety and Health (NIOSH) to perform a study that will hel

    Jan 1, 2002

  • AUSIMM
    North Mine Practice in Underground Points and Crossings

    IN a mine with any considerable output the economical handling and transport of ore underground is a matter of prime importance, and in the design or lay-out of a trucking system the question of what

    Jan 1, 1915

  • AIME
    Surveying the Names on the Ballot

    By AIME AIME

    WTHIN the next month all members of the Institute will be given an opportunity to vote for a new President, two Vice-Presidents, and five Directors. All of the candidates nominated by the official com

    Jan 1, 1935

  • CIM
    Real-time Assisted Driving System in Open Pit Mining Operations using Google Earth

    By E. J. Sun

    The ADS system was developed to reduce accidents related to haul trucks operating under low visibility conditions in surface mining and construction sites, which is based on the GPS, mesh-wireless net

    Oct 1, 2009

  • AUSIMM
    Alluvial Gold Deposits and Mining Opportunities on the West Coast, South Island

    By P M. Hancock

    The West Coast contains one of the world's giant placer gold deposits with production since the 1860s totalling some six million ounces (present day value NZ$ 3.6 billion). The deposits have been

    Jan 1, 1985

  • AUSIMM
    Experience in the Carbonization of Brown Coal Briquettes at Morwell

    By Kennedy G. L

    Operating experience with the pilot Lurgi carbonization plant at Morwell showed that under conventional operating conditions, although the thermal efficiency of the plant was very' high, the phys

    Jan 1, 1960

  • DFI
    Pin Piles For Seismic Rehabilitation Of Bridges

    Since the 1989 Loma Prieta Earthquake in the San Francisco Bay Area, the California Department of Transportation (CALTRANS) has accelerated seismic upgrading of their bridges. Many structures can be i

    Jan 1, 1993

  • SME
    A Model For The Adsorption Of Hydrolysable Cations On Silica - Preprint 09-131

    By S. Vivek

    An atomic force microscope (AFM) was used to measure the surface forces between silica surfaces immersed in solutions of hydrolysable cations and/or sodium oleate. Hydrophobic forces were observed at

    Jan 1, 2009

  • AUSIMM
    A Preliminary Geotechnical Assessment for Re-Opening the Blackwater Mine

    By J Taylor, L Richards, M McKenzie

    When a collapse in its services shaft caused rapid gas build up and its premature closure in. 1951, the Blackwater Mine at Wiauta was in full production with significant ore reserves yet to be mined.

    Jan 1, 1996

  • DFI
    The Use Of A Reverse Circulation Diaphragm Walling Technique To Form A Plastic Cut-Off Wall Around Sizewell B Power Station

    By H. F. Cowie

    Britain's first pressurised water reactor (PWR) Nuclear Power Station is now under construction at Sizewell on the Suffolk coast. A linear cut-off wall was proposed to ensure that the drawdown of

    Jan 1, 1989

  • IOM3
    Mathematical model of the dense-medium drum

    By P. J. Baguley

    The model has been developed on the basis of the observation that the partitioning behaviour of a particle is related to its calculated terminal velocity. It utilises a theoretical calculation of the

    Jun 18, 1905

  • AUSIMM
    Valuable Components Recovery from Lead-Zinc Metallurgical Slag

    Valuable Components Recovery from Lead-Zinc Metallurgical Slag

    Sep 13, 2010

  • IOM3
    Development of seismic risk assessment method for application to rockburst-prone sites in deep-level South African gold mines

    By R. D. Stewart

    Paper presented at the conference: Risk assessment in the extractive industries, held in Exeter, UK, 23-24 March 1994, and first published London: IMM, 1994, preprint volume, 18pp., 5 refs. A seismic

    Aug 1, 1995

  • CIM
    Explosives choice at East Kemptville Mine

    By J. M. Houston

    "In October 1982, Rio Algom Limited, purchased a tin prospect near East Kemptville, Nova Scotia, from Shell Canada Resources. This purchase led to the development of the first substantial tin mine in

    Jan 1, 1987

  • DFI
    Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.

    By P. M. Wiltcher

    The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high

    Jan 1, 2006

  • SME
    100,000 Expected at ConExpo-Con/Agg 2002 in Las Vegas

    More than 100,000 people are expected to be in Las Vegas, NV in March for ConExpo-Con/Agg 2002, the largest exhibit of its kind in the Western Hemisphere. This triennial event features equipment, ser

    Jan 1, 2002

  • SME
    Exploratory Fea & Conceptual Design Findings Of Large Diameter Segmentally Lined Shaft

    By D. Kruse

    Top down constructed large diameter (up to 90 m [300 ft]) shaft design and constructability issues present an interesting suite of challenges and opportunities highlighted in this paper. The study cov

    Jan 1, 2011