Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Review of Evaluation and Design of Secondary Support Performance in Longwall Ventilation Entries

    By Erik Westman, Benjamin Mirabile

    "Quantitative evaluation of secondary support performance in longwall tailgates in U.S. coal mines was introduced with the U.S. Bureau of Mines (USBM) Wood Crib Performance Model. This model evaluated

    Jan 1, 2018

  • SME-ICGCM
    Application Of Sliding Roof Bar Powered Support For Thick-Seam Coal Mining

    By Zhang Liandong

    Roof control in thick-seam mining has long been a difficult problem in mine design and coal mining. In the early 1980's, through ground control instrumentation and investigation the rules of r

    Jan 1, 1990

  • SME-ICGCM
    Coal Bursts That Occur During Development: A Rock Mechanics Enigma

    By Christopher Mark

    Coal bursts are typically associated with highly stressed coal. Most bursts occur during retreat mining (longwall mining or pillar recovery) in highly stressed locations like the tailgate corner of th

    Jan 1, 2017

  • SME-ICGCM
    Mobile Roof Supports For Pillar Retreat Mining

    By Robert P. Kudlawiec

    The use of Mobile Roof Supports (MRS) in pillar retreat mining has been a fairly recent occurrence in coal mining operations in the United States (1988). Determining the pillar block configuration, th

    Jan 1, 2000

  • SME-ICGCM
    Effect of Longwall-Induced Subsurface Deformations on Shale Gas Well Casing Stability under Deep Covers

    By Peter Zhang, Todd Minoski, Mark Van Dyke, Daniel W. H. Su

    "This paper presents the results of a 2017 study conducted by the National Institute for Occupational Safety and Health (NIOSH), Pittsburgh Mining Research Division (PMRD), to evaluate the effects of

    Jan 1, 2018

  • SME-ICGCM
    Use Of Polymer Grids For Longwall Shield Recovery

    By Brian E. Travis

    The recent development of polymer grids for the underground coal mining industry has created new alternatives for supplemental ground control practices. The grids utilize strong, lightweight polymers

    Jan 1, 1990

  • SME-ICGCM
    Mechanics of Rib Deformation—Observations and Monitoring in Australian Coal Mines

    By Yvette Heritage

    "The risk of fatalities from rib failure is still prevalent in the coal mining industry. This risk has prompted further research to be conducted on rib deformation in order to understand the mechanism

    Jan 1, 2018

  • SME-ICGCM
    Worldwide Implementation Of Continuous Miner System - Integrating Ground Control With Technology

    By Thomas W. McClain

    This paper describes the importance of considering ground control measures when importing U.S. continuous mining technology in foreign countries. Important ground control factors are discussed. Eac

    Jan 1, 2001

  • SME-ICGCM
    Advanced Surveying Method For Measuring Roof Convergence

    By M. Zaki Rashad

    In this paper, if three slant distances are measured from three given points of known coordinates to an unknown point, the position of this point (X, Y, and Z coordinates) can be determined. A compute

    Jan 1, 1990

  • SME-ICGCM
    The Technical Progress and Problems to Be Solved of Thick Coal Seam Mining in China

    By Jiacheng Wang

    The current state of thick seam coal mining methods is illustrated in three typical cases of thick seam longwall mining, each pointing out the outstanding achievements in top-coal caving mining and la

    Jan 1, 2011

  • SME-ICGCM
    Assessment of Rockburst Hazard by Quantifying the Consequence with Plastic Strain Work and Released Energy in Numerical Models

    By R. Kaund

    "Quantifying the rockburst consequence is of critical importance to reduce the hazards with preventative measures in underground mines and deep tunnels. Contours of energy components within a pillar m

    Jan 1, 2018

  • SME-ICGCM
    Determination of the Optimum Crown Pillar Thickness between Open Pit and Block Caving

    By Kourosh Shahriar, Kazem Oraee, Ezzeddin Bakhtavar

    "In this paper, a relationship between dependant parameters and the crown pillar thickness is first introduced. This relationship defines geotechnical problems caused by thin pillars and economic cons

    Jan 1, 2010

  • SME-ICGCM
    Assessing Coal Bumps From Excess Energy in Finite Difference Models

    By Ryan Garvey

    A numerical investigation is made into unstable failures of coal pillars (i.e. coal bumps) using the finite difference software FLAC3D. A static energy balance is first derived to calculate the excess

    Jan 1, 2013

  • SME-ICGCM
    Influence of a Coal Mine Subsidence on An Adjacent Dam

    By Nengxiong Xu

    The WTZ coal mine is located adjacent to an auxiliary dam in P. R. China. The mining-induced ground movements are calculated using a 3-D numerical procedure based on the finite difference method (FDM)

    Jan 1, 2013

  • SME-ICGCM
    Numerical Modeling of the Pillar Confinement with Backfilling Material in Room?and?Pillar Coal Mining

    By Andre Zingano

    It is known that the backfilling confinement increases the pillar strength and also reduces the rib lateral displacement. With backfilling, it is possible to increase the room-and-pillar mining recove

    Jan 1, 2011

  • SME-ICGCM
    The Effects of Longwall Coal Mining on the Hydrogeology of Southwestern Pennsylvania

    By Megan N. Witkowski

    The purpose of this study is to investigate the susceptibility characteristics of domestic and agricultural water supplies that may be vulnerable to diminution or total loss of supply when active long

    Jan 1, 2011

  • SME-ICGCM
    Rib Access Boom for a Roof Bolter

    By Joe McQuerrey, William Kendall, Gene Wilson

    "Roof bolting is the standard for ground control in underground coal mining. Rib and truss bolting is just as important when conditions are less than desirable. As a manufacturer of roof drills, J.H.

    Jan 1, 2010

  • SME-ICGCM
    AMCMRR- An Analytical Model for Coal Mine Roof Reinforcement

    By Mark G. Colwell, Russell Frith

    "An Analytical Model for Coal Mine Roof Reinforcement (AMCMRR) has been developed. AMCMRR utilizes a Factor of Safety (FOS) approach, which is commonly used in all forms of engineering. The starting p

    Jan 1, 2010

  • SME-ICGCM
    Recent Developments In Subsidence Prediction And Control For The Eastern U.S. Coalfields

    By M. Karmis

    Underground mining will disturb the natural equilibrium of the rock mass, causing significant stress redistributions in the vicinity of the excavation with corresponding horizontal and vertical displa

    Jan 1, 1984

  • SME-ICGCM
    36 Years of Subsidence Reporting at the ICGCM

    By Nicole E. Evanek, Anthony T. Iannacchione

    "Over the past 36 years, a great deal of information has been presented and discussed at the International Conference on Ground Control in Mining (ICGCM). The topic of surface subsidence engineering h

    Jan 1, 2018