Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Hydrogeomechanical Study Of Overburden Aquifer Response To Longwall Mining
By G. J. Hasenfus
This paper presents the results of an extensive hydrological and geomechanical monitoring program which Gas conducted at a longwall coal mine in W. Va. The field program included monitoring of groundw
Jan 1, 1988
-
Roof Control Under Conditions of Shallow Depth and High Horizontal Stress Field -A Case Study
By Yajie Wang
Traditionally, roof falls are usually attributed to bad roof strata and high vertical stress related to the overburden depth. However, roof falls under shallow overburden depth are oflen caused by a h
Jan 1, 1998
-
The Design And Selection Of Powered Supports For Application In 4.5 Metre Extraction At Daw Mill Colliery
By Clive Chadbourne
Investigations of world wide coal face strata control practice, the study of theoretical calculations and detailed engineering analysis have been combined to design and select a powered roof support s
Jan 1, 1994
-
Laboratory Pull Tests Of Resin-Grouted Cable Bolts
By Lewis Martin
Spokane Research Center personnel are currently conducting research on cable bolts to assess their material and support properties, to provide design criteria for roof control systems under various ty
Jan 1, 1996
-
Surface damage due to longwall mining - A case study
By P. M. Lin
A subsidence monitoring program over a longwall panel was established (1) to explore the impacts of dynamic subsidence on the ground surface and structures and (2) to correlate the movements between t
Jan 1, 1989
-
Improved Source Location And Evaluation Of Seismic Events Over A Deep Coal Mine
By D. S. Choi
This paper describes an improved source location technique for microseismic events related to coal mining. A system of non- linear distance equations is solved with the use of the Newton-Raphson metho
Jan 1, 1990
-
Application Of Time Domain Reflectometry To Mining
By Kevin M. Connor, Malcolm J. McPhersqn
Examples are presented in which Time Domain Reflectometry (TDR) was employed to locate deformation of rock masses induced by mining. The first example involved motoring the propagation of overburden f
Jan 1, 1984
-
An Applications Approach To Barrier Pillar Design For Improved Resource Recovery
By John R. Koehler
Available barrier pillar design methods do not adequately account for overburden caving characteristics, the timing and magnitude of associated load transfers, the occurrence of unusual geologic featu
Jan 1, 1989
-
Laboratory And Field Characterization Of Immediate Floor Strata In Illinois Basin Coal Mines
By Yoginder P. Chugh
The characteristics of weak floor strata associated with actively mined coal seams in Illinois are very important from ground stability point of view and, in many cases, are the governing factors in d
Jan 1, 1989
-
Improvement in Roof Support Systems at a New Underground Coal Mine Developed from Open-Cut Highwall in Indonesia
By Takashi Sasaoka
Indonesia is the second largest coal exporter to Japan, accounting for about 30 M tons annually. They produced about 150 M tons in 2005, over 99% of which being from open-cut mines [1]. However, t
Jan 1, 2007
-
Three-Seam Interaction: A Case Study
By N. P. Kripakov
Results of a complex three-seam interaction analysis in a western U.S. coal mine are presented. The physical situation simulated by the models represents the development of a set of entries underneath
Jan 1, 1996
-
Using Ground Penetrating Radar For Roof Hazard Detection In Underground Mines
By G. M. Molinda
Ground Penetrating Radar (GPR) is being investigated for the potential to determine roof hazards in underground mines. GPR surveys were conducted at four field sites with accompanying ground truth in
Jan 1, 1996
-
Application Of Tomographic Imaging To Stability Assessment
By Hamid Maleki
Roof falls are one of the leading ground control problems that adversely influence productivity and worker safety in underground mines, construction sites, and nuclear waste repositories. To control r
Jan 1, 1996
-
Pillar Stability Issues Based on a Survey of Pillar Performance in Underground Limestone Mines (08bccb54-5d4b-443a-860e-90b5a6841ec3)
By Gabriel S. Esterhuizen
A survey of pillar conditions was carried out at 21 operating limestone mines that use the room-and-pillar method. The surveyed pillars were all located in rock that was classified as ?Good? to ?Very
Jan 1, 2006
-
Underground Movement Of Rock Mass And Stress Distribution Due To Multiple Mining
By Victor V. Nazimko
Multiple mining generates gob-interaction displacements. They redistribute stress m strata and obey laws of irreversibility thermodynamics. An irreversible state causes inhomogeneity of the stress dis
Jan 1, 1996
-
Major Hazard Risk Assessment Applied To Pillar Recovery Operations (ad413764-c947-4465-9ec3-62ea91281168)
By A. T. Iannacchione
Recent fatal injuries occurring during pillar retreat coal mining call for better identification of the hazards and recognition of risks. Ground control hazards associated with room-and-pillar retrea
Jan 1, 2009
-
Integrated Instrumentation Method of Stress State, Material Property, and Deformation Measurement for Stress Control Method of Mining
By Shosei Serata
The application of conventional rock mechanics methods to complex ground is very difficult. Yet. In most underground mining, the ground is complex. Therefore. conventional methods are not only difficu
Jan 1, 1986
-
A Method for Sizing Longwall Pillars Based on Field Measurements
By Christopher Mark
A new method for the design of longwall pillars, called "Analysis of Longwall Pillar Stability" (ALPS), is described. The method is the final result of a research program that included two major field
Jan 1, 1987
-
Horizontal Stresses and Their Impact on Roof Stability at the Nelms No. 2 Mine
By J. B. Lizak
This paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.
Jan 1, 1984
-
Innovative Secondary Support Technologies For Western Mines
By Thomas M. Barczak
With the development of the shield support, the primary requirement for successful ground control in longwall mining is to provide stable gate road and bleeder entries. Wood cribbing has been the domi
Jan 1, 1996