Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone Strata

    By J. R. Koehler

    The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that f

    Jan 1, 1995

  • SME-ICGCM
    Factors Influencing Intersection Stability in U.S. Coal Mines (dc39f664-0f70-474b-be24-4adbb66c7510)

    By Gregory Molinda

    Groundfalls are much more likely to occur in coal mine intersections than in entries. NIOSH is using the experience of U.S. coal mines to determine the factors which influence intersection instability

    Jan 1, 1998

  • SME-ICGCM
    Rock Reinforcement Longevity

    By Francis S. Kendorski

    Rock reinforcement has been in widespread use and generally has been accepted in underground mining and tunneling since the 1950s. The first rock reinforcement technologies employed were mechanical an

    Jan 1, 2000

  • SME-ICGCM
    Investigation of Electromagnetic Emissions in a Deep Underground Mine (0366ea57-3ba7-4a00-bec7-825a048e7e26)

    By Douglas Scott

    Highly stressed rock in stopes continues to be a primary safety risk for miners in underground mines because it can result in failures of ground that lead to both injuries and death. Spokane Research

    Jan 1, 2004

  • SME-ICGCM
    Monitoring Of Longwall Seal Behaviour For Permeability And Stress Changes

    By Ken Mills

    Dartbrook Mine (Australia) works the Wynn seam, which has a moderate propensity for spontaneous combustion. Prior to any mining a commitment was made to place a segregation barrier pillar between long

    Jan 1, 1999

  • SME-ICGCM
    Root Causes of Groundfall Related Incidents in U.S. Mining Industry (2ced207f-73e6-4ab3-8c4e-7a683f4eb75c)

    By Kousick Biswas

    The main objective of occupational health and safety research is to minimize or eliminate the events that may cause fatal or non¬fatal injuries to human workers. A commonly used technique is to devise

    Jan 1, 2003

  • SME-ICGCM
    Introducing the New Windows ARMPS-LAM Program

    By Keith Heasley, Christopher Newman, Zach Agioutantis

    "Previously, in 2013, a laboratory version of the computer code ARMPS-LAM, introduced at the 32""d International Conference of Ground Control in Mining, successfully integrated the laminated overburde

    Jan 1, 2016

  • SME-ICGCM
    Optimizing Secondary Roof Support With The NIOSH Support Technology Optimization Program (STOP) (9d51b6a2-7ba0-4aba-9b0e-5647ea8b90eb)

    By Thomas M. Barczak

    The decade of the 90's brought an unprecedented increase in the development of innovative technologies to provide more effective and easier to install roof support in underground mines. To facili

    Jan 1, 2000

  • SME-ICGCM
    Regional Horizontal Stress And Its Effect On Longwall Mining In The Northern Appalachian Coal Field

    By D. W. H. Su

    This paper presents the results of ill situ horizontal stress measurements using a Minifrac system in several northern Appalachian coal mines. The effect of stress magnitude and orientation on longwal

    Jan 1, 1995

  • SME-ICGCM
    Subsidence Prediction In Illinois Coal Basin

    By Ed D. Doney

    Based on the subsidence data collected through a comprehensive subsidence monitoring program con: ducted over two longwall panels in an Illinois coal mine, mathematical models have been proposed for p

    Jan 1, 1990

  • SME-ICGCM
    Multiseam Mining On South African Collieries

    By R. W. Hill

    Multiseam mining has been carried out at many collieries in South Africa. It the seams are In close proximity difficult and dangerous mining conditions may arise. In the Witbank area multiseam bord an

    Jan 1, 1995

  • SME-ICGCM
    Critical Roof Span Approach To Selection Of Proper Coal Mine System

    By Antoni Kidybinski

    Coal mining both with longwall and room-and-pillar method often encounters severe operational difficulties due to had roof conditions. Rooffalls at entry cross-cuts or along the rib line in longwalls

    Jan 1, 1982

  • SME-ICGCM
    Simulated Materials Modeling And Analysis Of The Overburden Strata Movement In Top Coal Caving Mining

    By Zhou Ying

    Based on the mining condition and roof lithology of the 2-3 coal seam at Gengcun Mine, the simulated materials modeling method was used to study the movement process and characteristics of overburden

    Jan 1, 2001

  • SME-ICGCM
    A Method for the Selection of Rock Support Based on Bolt Loading Measurements

    By Stephen P. Signer

    A method to assist in the evaluation and selection of roof bolts using in situ measurements of roof bolt loading has been developed by researchers of the Spokane Research Center, National Institute of

    Jan 1, 1997

  • SME-ICGCM
    Rigid Or Yielding Roof Bolts: At The Face Or Away From The Face (3eff2ffb-d0b3-4171-9439-10f9fdec54f7)

    By R. D. Lama

    The concept of rigid or yielding bolts is discussed based upon support requirements for excavations of equivalent geomechanical behaviour. The concept of equivalent geomechanical behaviour is introduc

    Jan 1, 1992

  • SME-ICGCM
    Evaluation Of Subsidence Parameters For Inclined Seams In UK Coalfields

    By X. L. Yao

    This paper analyses the effects of mining extraction geometry (width/depth ratio) and dip of seam on subsidence parameters based on a large Database, containing 120 longwall mining cases all within th

    Jan 1, 1990

  • SME-ICGCM
    Reinforcement of Large Pillars by Bolting (8821999e-4c04-46db-a69e-e7a56781ac96)

    By S. J. Mitchell

    An analysis of bolting reinforcement of several large [approximately 18 m (60 ft) cube] pillars was performed. The many overcoring stress profiles in pillars at the mine were used to produce generaliz

    Jan 1, 1984

  • SME-ICGCM
    Analysis of a Stability Problem in an Underground Coal Mine Due to Floor Conditions

    By M Nombe

    Based on the analysis of a case study at POWELTON No.2 MINE, it was determined that mine stability problems had occurred due to floor softening. A fireclay (underclay) layer in the immediate floor was

    Jan 1, 2002

  • SME-ICGCM
    Downhole Overcoring Stress Measurement at a Western Underground Coal Mine

    By David Conover

    Knowledge of the magnitude and direction of the horizontal secondary principal stresses is a critical factor in designing the layout and mining sequence of underground openings. Typically, horizontal

    Jan 1, 2004

  • SME-ICGCM
    Mitigating Subsidence Influences on Residential Structures Caused by Longwall Mining Operations

    By Yi Luo

    The severity of disturbances caused by longwall mining subsidence to various residential structures can be re¬duced. The success of such mitigation efforts depends on accurate subsidence prediction, c

    Jan 1, 2003