Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Historical Perspective And Future Projection Of Longwall Mining In The United States (19eaaffe-326c-46a4-9a81-dc104b2df560)

    By Thomas M. Barczak

    This report chronicles the historical development of longwall mining in the United States and speculates on future developments to the turn of the century. Five eras of technological development durin

    Jan 1, 1992

  • SME-ICGCM
    Cavability Study Of A Competent Roof - A Case Study

    By T. N. Singh

    An evaluation was made on the cavability of the roof formation of Dishergarh seam including caving sequence, caving span, and load on powered support.

    Jan 1, 1994

  • SME-ICGCM
    Effect Of Specimen Size On Compressive Strength Of Coal

    By A. W. Khair

    Laboratory studies indicate that the specimen size influences the compressive strength of coal significantly. In the past, the diameter/height ratio of coal and rock specimens with different geometry

    Jan 1, 1996

  • SME-ICGCM
    Aspect Ratio and Other Parameters That Affect the Performance of Burrell Can Roof Supports

    By David F. Gearhart

    The Burrell Can1 is a thin, steel, tubular shell filled with aerated concrete that is used as a roof support in coal mines. The Can height is always shorter than the mining entry, so it is capped with

    Jan 1, 2012

  • SME-ICGCM
    Requirements and Performance of Pumpable Cribs in Longwall Tailgate Entries and Bleeders

    By Peter Zhang

    Pumpable cribs are being increasingly used in longwall tailgate entries and bleeders for roof support under abutment pressure. Their high peak capacity and confinement-controlled yield characteristics

    Jan 1, 2012

  • SME-ICGCM
    Field Test Results On Dyna-Rok And Dyna-Rok Plus Anchors

    By James J. Scott

    Research and development has been carried out on the patented Dynamic Rock Anchor, tradenamed DYNA-ROK and DYNA-ROK PLUS Anchors, which are manufactured and marketed by Ingersoll-Rand Company. This pa

    Jan 1, 1990

  • SME-ICGCM
    Monitoring Roof Beam Lateral Displacement At The Waste Isolation Pilot Plant

    By L. J. Terrill

    Lateral displacement in the immediate roof beam at the Waste Isolation Pilot Plant (WIPP) is a significant factor in assessment of excavation performance for the design of ground control systems. Info

    Jan 1, 1996

  • SME-ICGCM
    Detailed Stress Analysis of Longwall Panels

    By Khaled Morsy

    In the past two decades, high horizontal stress has been attributed to many ground control failures. Most believe that entries parallel to the high horizontal stress is most stable and least stable wh

    Jan 1, 2006

  • SME-ICGCM
    Ground Movements Associated With Pillar Extraction Coal Mining In Northern West Virginia (38f818ad-9d3b-4ecb-b624-667cef121309)

    By Robert W. Bruhn

    An investigation was male of ground response to pillar retreat mining in a 1.7 meter thick seam at 108 meter depth at a site in northern West Virginia. This paper describes mining-related stress chang

    Jan 1, 1984

  • SME-ICGCM
    In-Situ Coal Strength Determination - Case Studies

    By Kot F. Unrug

    Strength of coal is one of the governing factors in size determination of mine pillars, and therefore affects the percentage of extraction and thus, utilization of reserves. Coal strength is also impo

    Jan 1, 1995

  • SME-ICGCM
    Non-confirmation Mathematics for Wall Rock Classification for Mine Support

    By Guangyi Sun

    Wall rock classification method for coal mine support is the main factor affecting mine support. It is greatly affected by the combined effect of randomness, fuzziness and human being's incomplet

    Jan 1, 2005

  • SME-ICGCM
    Innovative Tailgate Support For Heavy Ground: 11 Left Longwall Panel, Cyprus Shoshone Mine

    By Christopher C. Woomer

    Cyprus Shoshone Mine uses the longwall method to extract a deep, thick, pitching coal seam in the Hanna Basin of South Central Wyoming. The immediate, and main roof rock consists of weak, thinly-bedde

    Jan 1, 1995

  • SME-ICGCM
    Development of in-situ stress measurement technique using ultrasonic wave attenuation method - A progress report

    By Y. L. Sun

    The feasibility of using the ultrasonic wave attenuation method for measuring in-situ stress is examined theoretically and experimentally. The theoretical analyses show that for a given rock type the

    Jan 1, 1989

  • SME-ICGCM
    Changes In The Seismic Properties Of The Cover Produced By Longwall Mining

    By Guoqi He

    Common offset seismic data collected over two active longwall panels at different stages of mining reveal that significant arrival time delays are produced in reflections from different levels within

    Jan 1, 1989

  • SME-ICGCM
    Tensioned Point Anchor Resin System Versus Non-Tensioned Fully Grouted Rebar - Two Case Studies

    By John C. Stankus

    Jennmar Corporation. in an effort to improve mine roof control, has conducted extensive study and research comparing tensioned point anchor resin systems versus the use of non-tensioned fully grouted

    Jan 1, 1990

  • SME-ICGCM
    The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244)

    By Stephen Tadolini

    A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar

    Jan 1, 2007

  • SME-ICGCM
    Mitigating the Effects of High Horizontal Stress on Ground Control in An Underground Stone Mine: A Case History

    By John Ellenberger

    The nature of a stone deposit is rarely defined through exploration and engineering design, but more through the actual experience encountered as the mine develops; hence, issues with ground control a

    Jan 1, 2012

  • SME-ICGCM
    The Initial Collapse of the Overburden Over Longwall Panels

    By Gennaro Marino

    Documented case histories are studied where data were found on the initial collapse of the overburden above the longwall panels. Under this scenario, the most controlled conditions exist for assessing

    Jan 1, 1987

  • SME-ICGCM
    Deformation and failure-time prediction in rock mechanics

    By Barry Voight

    The law [ ] where [ ] is a measurable quantity such as strain and A and cu are empirical constants, describes the behavior of materials in terminal stages of failure under conditions of approximately

    Jan 1, 1989

  • SME-ICGCM
    Detecting Strata Fracturing and Roof Failures from a Borehole Based Microseismic System

    By Tara Bajpayee

    Modern, highly productive underground mining operations need to assure the safety of their workforce by understanding where major strata fractures and roof failures could occur. Mines depend on a hos

    Jan 1, 2008