Search Documents
Search Again
Search Again
Refine Search
Refine Search
- 
                     Construction of the Turin Metro Line 1 Tunnel by N.3 EPB TBMs Construction of the Turin Metro Line 1 Tunnel by N.3 EPB TBMsBy P. Perruzza, R. Grandori, A. De Biase, A. Ciamei, A. Busillo The Turin metro alluvium soil is mainly made of large boulders, cobbles and gravel , few sand and almost no fines. This grain size curve is out of the range of application for EPB and Slurry TBMs. Jan 1, 2005 
- 
                     Snow Tunneling at the South Pole Snow Tunneling at the South PoleBy John H. Wright The United States Antarctic Program (USAP), through its principal support contractor Raytheon Polar Services Co. (RPSC), has recently completed a three-year project comprising nearly 936 m (3,071 ft) Jan 1, 2002 
- 
                     Processing of Peridotite Rocks of Chromite Ore Overburden into Magnesium Salts and Micro Silica Mining, "Metallurgy & Exploration" Processing of Peridotite Rocks of Chromite Ore Overburden into Magnesium Salts and Micro Silica Mining, "Metallurgy & Exploration"By Kallam V. K. Reddy, VADAPALLI SANJANA, Veerendra Singh, Gajanan Kapure This work describes a leaching process for the conversion of high-magnesium peridotite rock, which is a chromite ore overburden, into two valuable products: magnesium salts and micro silica. Under nor May 5, 2020 
- 
                     The Significance Of Filter Cake Pore Structure As Determined By Micro-Ct In The Analysis Of Filtration Phenomena The Significance Of Filter Cake Pore Structure As Determined By Micro-Ct In The Analysis Of Filtration PhenomenaBy J. D. Miller, C. L. Lin Filtration of fine particles involves filter cake formation and removal of surface moisture by drawing air through the porous structure. Accurate assessment of the transport properties of porous medi Jan 1, 2002 
- 
                     Thermal Exposure Limit in a Simulated Refuge Alternative Thermal Exposure Limit in a Simulated Refuge AlternativeBy C. D. Ashley, X. P. Garzon-Villalba, R. M. Lopez, T. E. Bernard Federal standards for refuge alternatives (RAs) mandate that they not exceed a Steadman apparent temperature (AT) of 95 °F (35 °C) at an assumedmetabolic rate of 325W, a limit that appears to be arbit Nov 8, 2019 
- 
                     Mechanized Shaft Sinking Method For Soft And Medium Strength Rock Mechanized Shaft Sinking Method For Soft And Medium Strength RockBy W. Burger Mechanical excavation methods can significantly improve excavation performance and labor safety compared to drill and blast operations. Herrenknecht has developed a mechanized shaft sinking method Jan 1, 2012 
- 
                     Autogenous Grinding - The Long And The Short Of It! ? Summary Autogenous Grinding - The Long And The Short Of It! ? SummaryBy Howard W. Adam Mill length was the primary variable investigated in an autogenous pilot mill circuit. The 5-1/2' diameter mill had both pebble ports and 1/2" wide slotted grates. The plus 1/2" mill product was Jan 1, 1973 
- 
                     Passive Mine Blast Attenuators Constructed Of Rock Rubble For Protecting Ventilation Seals - Preprint 09-057 Passive Mine Blast Attenuators Constructed Of Rock Rubble For Protecting Ventilation Seals - Preprint 09-057By M. J. Sapko The design requirements for mine ventilation seals have undergone a radical transformation in recent years, and these revisions have greatly increased the cost of the seal designs and their constructi Jan 1, 2009 
- 
                     Pillar Recovery At The Buick Mine Pillar Recovery At The Buick MineBy David E. Nicholas, Steven R. Dismuke, Paul F. Cicchini The Buick mine, located 195 kilometers (120 miles) southwest of St. Louis in the Viburnum Trend, is owned and operated by Homestake Mining Company. The mine produces lead and zinc ore from a room and Jan 1, 1986 
- 
                     Exploration Decision Analyses for the Brightwater Tunnels Exploration Decision Analyses for the Brightwater TunnelsBy L. Maday, V. J. Perrone, M. B. Gilbert INTRODUCTION The Brightwater conveyance system project in King County, Washington consists of constructing about 21 km (13 mile) of effluent and combined influent and effluent tunnels. The influen Jan 1, 2005 
- 
                     Construction of the C710 Beacon Hill Station Using SEM in Seattle— “Every Chapter in the Book…” Construction of the C710 Beacon Hill Station Using SEM in Seattle— “Every Chapter in the Book…”By Zephaniah Varley, Satoshi Akai, Richard Sage, Steve Redmond, Mike Murray, Rohit Shetty, Gerald Skalla One would be hard pressed to find another project as complex as this one given its configuration, the variety of issues to address and the required construction techniques. Contract C710 is currently Jan 1, 2007 
- 
                     Floodplain Aggregate Mining In Western Oregon (2ca5f679-fd59-4011-96c0-926073fa7dc9) Floodplain Aggregate Mining In Western Oregon (2ca5f679-fd59-4011-96c0-926073fa7dc9)By E. F. Schnitzer, S. R. Mamoyac, P. J. Wampler During 1996 and 1997, Oregon experienced flooding on a scale not seen in many years. Some gravel pits located near rivers experienced erosion and, in several cases, breaches between the gravel pit an Jan 1, 1999 
- 
                     Thiourea As A Lixiviant For Gold And Silver Thiourea As A Lixiviant For Gold And SilverBy J. Brent Hiskey Thiourea is a reagent capable of complexing gold and silver. With the proper oxidant, thiourea can effectively dissolve metallic gold and silver. A thiourea leaching system possesses potential advanta Jan 1, 1981 
- 
                     Sharing Best Practices from Other Industries and Identifying the Gap Using the Maintenancescoretest Sharing Best Practices from Other Industries and Identifying the Gap Using the MaintenancescoretestBy C. Frenzel, N. Blechschmidt "INTRODUCTION There is no doubt about the time and effort companies put in establishing and maintaining their equipment. However, the question about how these companies can map the benefits comes up. Jan 1, 2018 
- 
                     Floodplain Aggregate Mining In Western Oregon (b3a583d5-3e7a-4dd2-84c0-16936e808842) Floodplain Aggregate Mining In Western Oregon (b3a583d5-3e7a-4dd2-84c0-16936e808842)By E. F. Schnitzer, P. J. Wampler During 1996 and 1997, Oregon experienced flooding on a scale not seen in many years. Some gravel pits located near rivers experienced erosion and, in several cases, breaches between the gravel pit an Jan 1, 1999 
- 
                     Filtered Air Supply System Reduces Roof Bolter Operators? Exposure To Respirable Dust Filtered Air Supply System Reduces Roof Bolter Operators? Exposure To Respirable DustThe National Institute for Occupational Safety and Health (NIOSH) conducted a study to determine the effectiveness of a filtered air delivery system to reduce respirable dust exposure to roof bolter o Jan 1, 2012 
- 
                     Imaging Of Minerals, Ores And Related Products To Determine Mineral Characteristics (62b10345-9d28-4191-957f-3c363fe80798) Imaging Of Minerals, Ores And Related Products To Determine Mineral Characteristics (62b10345-9d28-4191-957f-3c363fe80798)By W. Petruk Imaging is a fundamental requirement when characterizing minerals, ores and related products. Images are used for presentation, texture analysis, characterization, image analysis, identification, etc Jan 1, 2001 
- 
                     Austrian Method Of Tunnel Building In Very Heavily Squeezing Ground In Mountainous Terrain Theory And Practice Austrian Method Of Tunnel Building In Very Heavily Squeezing Ground In Mountainous Terrain Theory And PracticeBy Horst Pöchhacker The largest structure along the Tauern highway section between Salzburg and Villach is the 6.4-km-long Tauern Tunnel. The major geotechnical problems that came up surprisingly while driving the headin Jan 1, 1976 
- 
                     Medium-Temperature Pressure Leaching Of Copper Concentrates - Part IV: Application At Morenci, Arizona Medium-Temperature Pressure Leaching Of Copper Concentrates - Part IV: Application At Morenci, ArizonaBy J. O. Marsden Parts I and II in this series of papers presented the chemistry of medium-temperature pressure leaching of copper sulfide concentrates and reviewed the metallurgical development of a process to effect Jan 1, 2007 
- 
                     AUV- and ROV-based exploration of active and inactive seafloor massive sulfide deposits at the Semyenov and Irinovskoe sites on the Mid-Atlantic Ridge AUV- and ROV-based exploration of active and inactive seafloor massive sulfide deposits at the Semyenov and Irinovskoe sites on the Mid-Atlantic RidgeBy J. W. Jamieson, J. Escartin, A. Steinführer Evidence of hydrothermal activity on two Mid-Atlantic Ridge oceanic core complexes (OCCs), at 13º30’N (the Semyenov 1 through 5 fields) and 13º20’N (the Irinovskoe field) (Fig. 1) were studied using C Sep 1, 2014 
