Search Documents
Search Again
Search Again
Refine Search
Refine Search
- 
                    
                Characterization Of The Berkeley Pitlake I: Surface WatersBy M. Bennett, L. Twidwell
Montana Tech has embarked on a coordinated series of studies to delineate the characteristics of the Berkeley Pitlake containing over 36 billion gallons of acidic, metal-contaminated water formed afte
Jan 1, 2007
 - 
                    
                Long term demand for construction raw materials and the implications for minerals provision; the case of sand and gravel in the NetherlandsBy M. van Elp, R. Saitua Nistal, P. J. M. Groot
Demand for construction raw materials depends on investment in housing, other buildings and infrastructure. The provision of these materials requires early knowledge of future trends in construction i
Jan 1, 2011
 - 
                    
                The 2000’s – SME Increases Internet PresenceBy William M. Gleason
Hard times continued to plague the industry when the calendar rolled over to 2000. During 1999, the United States economy had grown vigorously, capping the longest economic expansion in United States
Jan 1, 2007
 - 
                    
                Railroad Crossing by Microtunneling: MTBM Successfully Mines Side-by-Side Twin Tunnels Six Feet Below Railroad - West Elizabeth Avenue Storm Drainage Project, Linden, New JerseyBy Keith Schaeffer
This paper presents a history of the planning, engineering and construction completed for the railroad tunnel crossing part of the West Elizabeth Avenue Storm Drainage Project, undertaken to relieve f
Jan 1, 2008
 - 
                    
                Reclaiming Steep-Slope Eastern Coal Mines For Successful ReforestationA methodology has been developed and demonstrated to be effective in reclaiming surface-mined land for a forestry post-mining land use. The Forestry Reclamation Approach (FRA) has been applied, almos
Jan 1, 2011
 - 
                    
                Extensible Conveyor Systems For Long Tunnels Without Intermediate AccessBy Dean Workman
Long extensible conveyor systems are an important option for efficient tunnel excavation where intermediate access is impractical. The conveyor system designed for the Pula Subbaiah Veligonda Tunnel
 - 
                    
                Tunnel Interaction: Hydraulic, Mechanical, And Hydromechanical ApproachBy John Kinneen, Sunghoon Choi, Arne Fareth, Edward S. Barboe, Kyle R. Ott
A new water treatment plant is to be constructed for a portion of the water supply system of New York City. The project includes construction of new water conveyance tunnels crossing perpendicular and
Jan 1, 2007
 - 
                    
                A Review Of The Analysis Of Amphibole FibersBy K. A. Allison, D. R. Van Orden, R. J. Lee
Continuing analysis of environmental samples for asbestos content has resulted in the misidentification of non-asbestos amphibole particles as asbestos fibers. These errors have received wide publici
Jan 1, 2005
 - 
                    
                Brightwater Conveyance System: Ground Freezing For Access Shaft Excavation Through Soft GroundBy Joseph M. McCann
The Brightwater regional wastewater treatment facility, under construction in King County, WA, includes an extensive conveyance system that will feature deep, soft-ground tunnels and shafts. Excavatio
 - 
                    
                Machine Utilization Time Of NATM Method In Metro Tunnels: The Case Of Kadikoy-Kartal Metro Tunnels (Istanbul) ? IntroductionBy I. Ocak
Initial investment for mechanical boring of tunnels is found to be high in most cases. Conventional drilling and blasting is not the possible especially in urban area. In these conditions impact hamme
Jan 1, 2011
 - 
                    
                Recent Developments in North America in the Design of Precast Concrete Tunnel Linings ? IntroductionBy Brian Garrod
Increasing use of pressurized-face tunnel boring machines in North America has produced a similar increase in the application of precast concrete tunnel linings. Where a pressurized TBM is needed, imm
Jan 1, 2008
 - 
                    
                Development of buffer station for safe and eco-friendly mining of seabed mineral resourcesBy Tae-kyeong Yeu, Jong-Choi, Cheon-Hong Min, Hyung-woo Kim, Jae- Won Oh, Sup Hong, Minuk Lee, Sung-Soon Kim, Chang-Ho Lee, Ki-Young Seong
"Collecting mineral resources from the seabed using a seafloor crawling robot is the firststep in the mining operation. The second-step is lifting the collected ore up to the water surface. For liftin
Sep 1, 2014
 - 
                    
                Challenges in undertaking inertisation of fires in underground minesBy A. D. S. Gillies
Inertisation is used to enhance the safety of underground mine areas either to avoid the potential for a combustion event or to stabilize a situation after an ignition, fire or heating. The primary ob
Jan 1, 2009
 - 
                    
                New Insitu Instrumentation Technique For Tunneling & Mining Design: Field ExamplesBy Yoshinori Iwasaki, Shosei Serata, Yutaka Mochida
A new comprehensive insitu instrumentation technique named this RCC Method has been developed for rapid assessment and improvement of the structural stability of underground openings. When applied to
Jan 1, 1976
 - 
                    
                Feasible Tunnel Construction Options For The Systems Conveyance And Operations Program Reach 3 TunnelBy S. H. Jason Choi
The Systems Conveyance and Operations Program (SCOP) is being implemented to convey tertiary-treated effluent to Lake Mead near Las Vegas, Nevada. The Reach 3 Tunnel Project is part of SCOP. The tunne
 - 
                    
                Middle Rouge Parkway Interceptor Extension—A Case HistoryBy Harry R. Price, Behrooz Tahmasbi, Charles J. Roarty
The 2,408 meter (7,900-foot) long Middle Rouge Parkway Interceptor Extension varies in size from 1.52-meter (5-foot) to 2.36 meter (7-foot 9-inch) inside diameter. Most of the sewer was constructed in
Jan 1, 2007
 - 
                    
                Maintenance Contract on Cat 785 Trucks Works Well at Round MountainBy J. B. Rasmussen
As part of a purchase of a fleet of Caterpillar 785 trucks, Round Mountain Gold Corp., Cashman Equipment Co. and Caterpillar Inc. entered into a four-year contract for the major maintenance of the fle
Jan 1, 1991
 - 
                    
                EPB Tunnel Boring Machine Design For Boulder ConditionsBy Craig Bournes, David Chapman, Michael DiPonio
Historically, boulders are a frequent source of problems in soft ground tunneling. During tunnel construction, the need to manually break and remove boulders as obstructions causes delays to the proje
Jan 1, 2007
 - 
                    
                Mineral Resources and Land Use Planning Conflicts in NorwayBy K. Nielsen
The paper presents a brief overview of the mineral industry in Norway, followed by a description of the mineral policy and relevant legislation including the roles of the Norwegian Directorate of Mini
Jan 1, 2005
 - 
                    
                Gold mineralization in porphyry copper deposits discussedBy David J. Lowell
The gold content of porphyry copper deposits ranges from less than 0.05 g/t to more than I g/t ((0.0017 to 0.035 oz per st) and the average is about 0.05 g/t (0.0017 oz per st) gold. Perhaps the highe
Jan 1, 1989