Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Proceedings, 107th Annual General Meeting, 2004
The 107th Annual General Meeting of The South African Institute of Mining and Metallurgy was held at The Country Club, Johannesburg, Napier Road, Auckland Park on Wednesday, 11 August, 2004. Welcom
Jan 1, 2004
-
Copper Mining in Zambia - History and Future (VOLUME 116)
By J. Sikamo, A. Mwanza, C. Mweemba
"The Zambian copper mining industry as we know it today had its genesis in the 1920s. Consistent private sector-driven investment in the industry over a period of over 50 years in exploration, mine de
Jan 1, 2016
-
Skorpion Zinc: Optimisation And Innovation
The Skorpion process comprises three processing steps, atmospheric leaching in sulphuric acid, zinc solvent extraction and electrowinning to produce special high grade zinc. The major mode of impurity
Jan 1, 2007
-
Transportation Of A Water-Based Slurry In An Open Furrow Launder Or Stream
By J. P. F. Charpin
The transport of large boulders in a furrow from a mining area to a nearby pond was considered. The furrow is filled with a mixture of water and soil particles flowing down to the pond at high velocit
Jan 1, 2007
-
Further Processing And Granulation Of Slags With Entrained Metal And High Metal Compound Content, With Specific Reference To Present Manganese Slag Dumps As Well As Additions Due To Daily Production
By D. Norval
Keywords: Pyrometallurgy, slag, metal, entrained, granulation, ferromanganese Water granulation of certain slags with high metal entrainment has customarily not been practised, not only due to the
Jan 1, 2011
-
The Road To NPV+
By R. Hummel
When the slope angles of the southern side of the Venetia open pit were required to be flattened by some 20 degrees after an analysis completed by De Beers geotechnical engineering in conjunction with
Jan 1, 2001
-
Application of Manufacturing Management and Improvement Methodologies in the Southern African Mining Industry
By J. O. Claassen
"A study conducted at 22 operating mines in the southern African region indicated that each mine employs about five management and improvement methods with roots in the manufacturing industry. All res
Jan 1, 2016
-
A zero-one integer programming model for open pit mining sequences - Synopsis
By J. Gholamnejad
The aim of short-term production scheduling is to decide which blocks of ore and waste to mine in which time period (shift, days, weeks or months) so that several operational and geometrical constrain
Jan 1, 2008
-
Rockburst Prediction - Case Studies Using A Kinematics Of Failure Approach
By W. de Beer
We present aspects of one of several ongoing case studies used in the development of prediction techniques for major seismic instabilities. The current investigation centres on accelerated coseismic d
Jan 1, 1998
-
Grid-Based Analysis of Seismic Data
Quantitative seismology is an important tool for investigating mineinduced seismicity and the quantification of the seismic rock mass response. The spatio-temporal interpretation of seismic data withi
Jan 1, 2014
-
-
Critical investigation into the problems surrounding pillar holing operations
By L. Mpolokeng, J. P. Labuschagne, H. Yilmaz
"An investigation into pillar cutting was carried out at a platinum mine on the western limb of the Bushveld Complex. The focus was on crush pillar design and implementation in order to ultimately imp
Jan 1, 2015
-
Pre-sink shaft safety analysis using wireline geophysics
By N. Andersen
During the preliminary design phases and feasibility study of a proposed vertical shaft, a vertical diamond drill-hole is normally drilled on the site. This paper outlines how rock mass characteristic
Jan 1, 2015
-
Uncertainty Assessment For The Evaluation Of Net Present Value: A Mining Industry Perspective ? Synopsis (443bbb20-5eab-43f3-85de-c6c40fb656b6)
By Ö. Erdem
The investment decision making process in the insurance and finance industries is affected by new advances such as simulation techniques. These advances have improved the discounted cash flow method (
Jan 1, 2012
-
Value Driven Resource Allocation And Focus In The Early Stages Of Project Development
By M J. Van Der Merwe
The mining industry is facing a serious skills resource shortage, growing commodity demand and cyclical prices. This makes focus and allocation of resources in the early stages of project development
Jan 1, 2008
-
Correlation Between P-Wave Velocity And Some Mechanical Properties For Sedimentary Rocks ? Synopsis
By R. Altindag
Engineers and researchers need to estimate the mechanical properties of rocks from P-wave velocity. In previous studies, the researchers have investigated either the limited values or all the data bel
Jan 1, 2012
-
Engineering Considerations In The Tolerability Of Risk - Mine And Occupational Health And Safety 2010 ? 1 Risk
By Noel C. Joughin
In making judgements on tolerable levels of risk in industry, and in all spheres of life, it needs to be understood that every action gives rise to risk. Without risk, nothing can be done. Without ris
Jan 1, 2011
-
Numerical Solution for the Deformations of Tunnels in Rock Masses and its Application to Estimate In Situ Stress Ratio K0
By M. Arlandi, J. C. Monge
In this paper, the finite element method is used to obtain deformations of a rock tunnel. More than 3,000 numerical simulations and calculations were carried out. The analysis of this results has all
Jan 1, 2003
-
Increasing The Capacity Of The Grinding Circuits Without Installing More Mills
By Godofredo F. Barrios
For years urethane screen surfaces have been used in a wide range of wet screening applications where openings from as fine as 100 microns and coarser have been used. The purpose of this paper i
Jan 1, 2007
-
Presidential Address: Platinum Perspectives - Introduction (247b6aee-fd10-4deb-ae5b-bdfb2afc1ee5)
By L. A. Cramer
Platinum metal was first utilized by the Inca civilization in South America where it was found in alluvial deposits along the San Juan and Atrato rivers that lie between the Andean mountain range in C
Jan 1, 2001