Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Blasting Conditions Couldn't be WorseBy John Atkinson, Steve Repola
This paper will describe two blasting plans that have been developed for American Aggregates' Marble Cliff Quarry located near Columbus, Ohio. Two different limestone formations are mined on different
Jan 1, 1993
-
Design Software for Electronic DetonatorsBy Kia Riihioja, Mike Higgins
A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh
Jan 1, 2004
-
Influence of the Interaction of Open Pit and Underground Mining BlastingBy Darío Innamorati, Jorge Oliva
Cerro Vanguardia is a known gold and silver deposit located in the province of Santa Cruz, Argentina. The mine has been in operation since 1998 and is thought to be one of the most important mines in
Jan 21, 2025
-
A Practical Approach for Blasters to Determin The Optimal Bench Blasting ConditionsBy Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan
In the bench blasting, the realisation of an economic, and safe blasting is only possible with a reliable blasting design on condition that considering all sequential activities such as drillingblasti
Jan 1, 2004
-
Effect of Artificial Discontinuities Formed by Presplitting with Different Depths on Structural Damage RiskBy Enver Alan
This Research & Development (R&D) study was conducted in the field of applied blasting engineering in Ethiopia, within the AKH Railway Project, which was built in Girena, within the boundaries of the
Feb 1, 2020
-
The Importance of Proper Seismometer CouplingBy Randy Wheeler
In recent years the issue of seismograph calibration and accuracy has been a major focal point of the ISEE Blast Vibration and Seismograph Section. In fact, questions concerning the consistency and re
Jan 1, 2004
-
O'Shaughnessy Dam Hydroelectric ProjectBy Alan Hooper, James E. Mischler
Construction began in 1984 for a 5 megawatt hydroelectric power retrofit at the O'Shaughnessy Dam for the City of Columbus, Ohio. The construction necessitated excavation of limestone bedrock up to 27
Jan 1, 1986
-
Controlled Hard Rock Trench Blasting Close to a Buried Gas Pipeline under PressureBy M. Ganster
Austria’s biggest supplier of oil and gas, transports gas through the West Austria Gasline for domestic consumption. In addition, the OMV also works as gas carrier and ensures the transit into neighbo
Jan 1, 2010
-
Excavation of Rock by Non-Explosive Method at Queen Mary Hospital, Hong KongBy Guy Bridges
Site formation works requiring excavation of rock at the Queen Mary Hospital redevelopment site was restricted due to extremely low ground vibration limits. Non-Explosive excavation method called Elec
Feb 1, 2020
-
Modeling the Effect of Delay Scatter on Peak Particle Velocity of Blast Vibration Using a Multiple Seed Waveform Vibration ModelBy Mick Lownds, Ruilin Yang
The potential advantages of electronic detonators with accurate timing have been increasingly recognized by the blasting community. However, in comparative blasts the results with pyrotechnic timing a
Jan 1, 2011
-
Full-Scale Trials Involving the Open Detonation of Large Bombs Close to Structures.By Ambrose Buchanan, Rob Farnfield, Charles Adcock
Beginning on 7th September 1940 the City of London was subjected to 57 consecutive days of bombing in what became known as the ‘London Blitz’. To commemorate the 70th anniversary of this event a telev
Jan 1, 2011
-
Shock Tube Detonator Shelf Life in Relation to Timing AccuracyBy Joshua Hoffman, Philip Mulligan, Braden Lusk, Tristan Worsey
Blasters rely upon detonators to achieve the designed timing sequence to move material where it needs to go, minimize vibration, or optimize fragmentation. At times detonator inventory on seldom used
Jan 1, 2013
-
Initial Testing of a Speed of Sound Test Apparatus for Powdered ExplosivesBy Barbara Rutter, Shonn Kevin McNeil
"This study discusses how a prototype was built to measure the sonic velocity in powdered explosives.The sonic velocity of an explosive is a benchmark to determine if the explosive deflagrates or deto
Jan 1, 2017
-
Debris Directionality Comparison: Full Scale Tests to Q/D and QRABy Lon Santis, Bill Evans, John Tatom
Debris data from the Department of Defense Explosives Safety Board’s Project ESKIMORE full-scale explosives event test program are compared to quantity-distance (Q/D) standards and quantitative risk a
Jan 1, 2015
-
Reducing Blast Vibration Amplitudes Close-In to Structures of Sub-Standard ConstructionBy Enrique Munaretti, Cathy Aimone-Martin, Vitor Rosenhaim, Jair Koppe
Production blasts at one of Copelmi’s coal mine operations will be carried out 100 m (330 ft) from a neighborhood located in the town of Butiá, southern Brazil. Mine management is concerned about the
Jan 1, 2013
-
The Smart Application of Explosives for Drill to Mill (D2M) OptimizationBy J. Silva, M. Kotraba, F. Pontanilla
Blasting is the application of highly complex science that, in some cases, could be viewed as an art. Many variables are involved in a blast, including geology, pattern design, timing and firing seque
Jan 1, 2024
-
New Methodology for Calculating Dynamic PressureBy Jorge Cárdenas, José Luis Hurtado
The critical distance determination test through direct recording for the mine in Phase 03 was carried out in January 2024, and in it the vibration and pressure models were obtained for the Sedimentar
Jan 21, 2025
-
Tehachapi, CA, Double-Track Project, Rock Slope Design and ExcavationBy Thomas Pallua, William C. Gates
"Two major railroad companies have identified several segments along the railroad corridor betweenTehachapi and Bakersfield, Kern County in California that require construction of a second track to im
Jan 1, 2017
-
Vibration Data Analysis to Optimize the Blast Design and Improve Shovel ProductivityBy Luana Ferreira de Carvalho, Aurelio Manço Garcia, Gustavo Sampaio Lopes, Jose Silvio Corsini, Davi Bastos Martins de Oliveira
The Enaex Mining Technical Solutions (EMTS) team, in partnership with the Anglo American Iron Ore Brazil drilling and blasting team, has developed a study aiming to optimize the blast design applied a
-
Vibration Data Analysis to Optimize the Blast Design and Improve Shovel ProductivityBy Luana Ferreira de Carvalho, Aurelio Manço Garcia, Gustavo Sampaio Lopes, Jose Silvio Corsini, Davi Bastos Martins de Oliveira
The Enaex Mining Technical Solutions (EMTS) team, in partnership with the Anglo American Iron Ore Brazil drilling and blasting team, has developed a study aiming to optimize the blast design applied a
Feb 1, 2020