Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Prediction of Fragmentation Based on Distribution of Explosives EnergyIn situ, most Taconite is heavily pre-fractured; because of the high cost of comminution of taconite, maximum fracture of pre-existing blocks is desirable. Sustained borehole pressure plays a signific
Jan 1, 1995
-
Avoiding Tragedy: Lessons to be Learned from a Flyrock FatalityBy Courtney W. Shea, Dennis Clark
Reckless blasting can have tragic consequences: The death of an innocent traveler, the financial demise of a coal company, and even criminal prosecution. In June 1993, a Tennessee coal mining company
Jan 1, 1998
-
An Application of the Hercudet Non-Electric Delay Initiation System to Underground Pillar BlastingBy W Russell
The Hercudet Non-Electric Delay Blasting Cap System provides a means of achieving greater flexibility in the use of delays, using totally enclosed gas detonation circuits which eliminate the concussiv
Jan 1, 1985
-
Applications of the Hand Held Programmable Calculator in Field Problem SolvingBy J R. "Dick" Daniel
Over the past several years, the Hercules Technical Service Group for the Explosives Department has produced a series of programs for the TI59 programmable calculator dealing with explosive applicatio
Jan 1, 1984
-
The Development and Testing of a New Mechanical Stemming AidBy Paul Worsey, Terry Nixon
The development and testing of a simple mechanical stemming aid (Patents pending) resulting from a Joint venture by Incubator Technologies Inc. and the University of Missouri-Rolla and funded by the U
Jan 1, 1988
-
Transient Vibration and Complaints an Emperical Study of Coal Mine DetonationBy Gerald R. Coonan
Laboratory research is being conducted to substantiate suggested levels for voluntary standards on human response to transient vibration. The application of those findings to actual field conditions,
Jan 1, 1982
-
Directional Effects of Primers in Small Diameter BoreholesBy Calvin J. Konya
Many controversies and differences of opinion exist in blasting technology. The primer location in small diameter dynamite columns is an example of one of these controversial areas. It is generally ag
Jan 1, 1980
-
The Electronic Detonator, Security, Handling, Effectiveness and GeophysicsBy Detlef Sulzer, Winfried Rosenstock
"At the end of this century a great breakthrough in the field of blasting technology is finally going tobecome reality. That, in the true sense of the word, is the long expected and desired “HighTechn
Jan 1, 1999
-
Large Cast Blasting Programs Require Design FlexibilityBy Jeff Wachendorf
As the title implies, this paper details the start of a cast blasting and the design flexibility required to satisfy different parameters encountered on a large coal mine employing cast blasting as th
Jan 1, 2015
-
Discrete Element Modeling of Rock Blasting in Benches, with Joints and Bedding Planes - Initial Development (Geomechanics Department, 6117 Sandia National Laboratories)By Dale S. Preece
A Discrete element computer program named DMC (Distinct Motion Code) has been developed for modeling rock blasting. This program employs explicit time integration and uses spherical or cylindrical ele
Jan 1, 1995
-
Effects of Blasting Vibrations on Uncured Concrete FoundationsBy Thomas A. Simpson, Yung-Kwaun Jow, Dennis L. Gamble
Construction of the $200 million Riverchase Galleria Mall in Hoover, Alabama was started in early 1984. The construction area consists of about 70 acres. The extensive building complex requires heavy
Jan 1, 1985
-
Constructing a Decline Truck Entrance Tunnel Into Rock Reserves Located Beneath a College CampusBy David R. Holberg
In the Kansas City metropolitan area, mineable Bethany Falls Limestone occurs 80 ft below river level under the 700 acre Park College Campus on the north bank of the Missouri River at Parkville. For 2
Jan 1, 1997
-
Multi-Blasthole, Multi-Row, Detonation Delay timing Simulation of Rock Blasting Using DMCBLAST_3DBy Dale Preece, Stephen Chung
Development of DMCBLAST-3D is continuing and now includes the capability to simulate the detonation of multiple blastholes in multiple rows that make up a conventional bench blast, either in a rock qu
Jan 1, 2002
-
Computer Based 3-D Blasting Analysis SystemBy S Burchell
During the past few years, high-speed cameras, laser surveying equipment and photogrammetry have become standard tools for recording blast geometry and results. While laser profiling yields accurate 3
Jan 1, 1992
-
Splitting Granite Using PyrodexBy G Dean Barrett
Just one year ago at the 1986 Annual Meeting of the Society of Explosives Engineers, Dr. Calvin J. Konya presented a paper entitled "Presplitting Granite Using Pyrodex, A Propellant.'' Since that tim
Jan 1, 1987
-
Dewatering Small Diameter Bore HolesBy R J. Hill
Blasters are well aware of the problems and expense faced when trying to load in wet bore holes; problems of poor coupling and poor density, as well as the expense of higher priced cartridge product.
Jan 1, 1986
-
Complete Computer Simulation of Crater Blasting Including Fragmentation and Rock MotionBy Dale S. Preece, Lee M. Taylor
Computer simulation of the physics involved in conventional rock blasting can be split into two phases; transient stress wave propagation and rock motion. Because the two phases involve totally differ
Jan 1, 1989
-
The Hercudet System of InitiationBy Robert B. Hopler
Hercules Incorporated has designed, developed, and begun introducing a new non-electric delay blasting cap system which is radically different from anything presently available. This system, called He
Jan 1, 1975
-
Vibration Monitoring and Control of Blasting Associated with the Construction of a Highway Next to a Show CaveBy Paul Worsey, Gerald Rupert, Mark Kirkbride
The realignment of Highway H in the proximity of Crystal Cave (Springfield MO.) required the development of a blasting program that was both economical and efficient for construction, yet ecologically
Jan 1, 1997
-
Effective Construction Blasting Damage ControlBy Earl C. Hutchison, Gene Smith
Extensive blasting was required to construct an underground tunnel for a 90 inch sewerage relief line. The tunnel and required excavation extended under an upper middle-class residential area in Atlan
Jan 1, 1981