East Boston Branch Sewer Relief Project: Support Of Excavation Case StudyBy Eric P. Bregman
As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
-
East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan
"As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
Jan 1, 2017
-
Foundation Rehabilitation of the Henry Hudson BridgeBy Dharmil S. Patel, Zoyav S. Benyaminov, Cassandra A. Wetzel
Rehabilitation of the Henry Hudson Bridge is nearing completion, connecting Spuyten Duyvil in the Bronx to Inwood Hill in Manhattan, New York. Constructed in 1936, the Henry Hudson Bridge spans 840 fe
Sep 8, 2021
-
The Use of Shape Accel Arrays (SAAS) for Measuring Retaining Wall DeflectionBy Paul Thurlow, Richard K. Lipscombe
The measurement of deflection of designed diaphragm walls is critical for near real time information to assess wall and soil behaviour as the internal area is excavated in a controlled manner. Data en
Jan 1, 2017
-
UB Digs Deep and Builds Over Adjacent Subway for New Medical Building HubBy Lisa R. Papandrea, David Chen, Walter E. Kaeck
"Construction of the University at Buffalo’s new School of Medicine and Biomedical Sciences (UB-SMBS) required excavation in variable ground to a depth of more than 40 ft adjacent to the NFTA Metro su
Jan 1, 2016
-
Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century ConstructionBy Alan D. Fisher
Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen
Jan 1, 2013
-
Behavior of Instrumented Deep Anchored and Strutted Diaphragm Wall in Soft RockBy Amr Al Degwe, Walid Jaber
"INTRODUCTIONNSCC International Ltd. carried out the enabling works and constructed the foundation system for the Emirates Pearl Tower and Bab El Qasr Hotel in Abu Dhabi. Emirates Pearl Tower is a joi
Jan 1, 2017
-
Army Corps Mega Projects Benefits From Innovative FoundationsBy Dale Berner, Michael O’Sullivan
"This paper focuses on lessons learned from the innovative designs, in-the-wet construction methodology and modified foundation conditions, for two United States Army Corps of Engineers, USACE, Megapr
Jan 1, 2017
-
Construction Of Large Drilled Shafts The 2nd Annual Mike O?Neill LectureBy Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
Jan 1, 2013
-
Verification Of Drilled Shaft Resistance By The Post Grouting MethodBy Suthan Pooranampillai
Verification of drilled shaft resistance is primarily obtained through the use of different load testing methods. Procedures utilized include conventional top down static loading, the Osterberg load c
Jan 1, 2010
-
Augercast Piles - History And AdvancementsBy Larry Rayburn
Augercast piles evolved in the late forties from the process of pressure grouting open holes backfilled with stone. In 1956, a patent was issued for a cast in situ pile by pumping high pressure grout
Jan 1, 2005
-
Session 29 "Grouting for Tunnels 1"By Lynn Crayne
We used Glyoxal as the hardener, at a final concentration of 10% by volume and therefore 20% by volume in the A-Component. They worked pretty well what we did was we shaved the joints on each of the
Feb 10, 2003
-
-
FHWA Hollow Bar Soil Nail (HBSN) Test Program, A SummaryBy Jesús E. Gómez
Verification and production testing of soil nails requires debonding the upper section of the soil nail to isolate the portion of the soil nail intended for testing within a specific ground type. In p
Jan 1, 2011
-
Automation Of Pile Foundation Design Post-Processing To Produce Pile PlansBy Rajasekar Subbian, Jessica Oudhof
In the Netherlands pile foundation design is done using CPTs in accordance with EC7 national annexure. The capacity per tip level is calculated for every CPT followed by zonation to find the tip level
May 1, 2022
-
Study Of Ground Settlement And Volume Loss Associated With Tbm Tunnelling By Analytical And Numerical MethodsBy Suresh Chikati, Gangadharan Santhanam
Twin tunnels were constructed to a length of 863m using TBM in one of the underground metro projects. The tunnels pass through complex geological conditions (soil, rock and mixed conditions). This pap
Sep 1, 2022
-
Deep Excavation for Loop PitBy Pathik Deb Mallik, Shyamal K. Mitra, Rajiv Kishore, Shuvranshu Rout, Manos De
"This paper presents a case study on the design and construction of a deep underground pit structure constructed inside almost a century old existing plant building. The complexity and challenge for t
Jan 1, 2015
-
Determination of Coefficient of Modulus of Sub-Grade Reaction for Free Head Short PileBy Sumit Kumar Biswas, Moyukh De, Sibapriya Mukherjee
"The piles often are also subjected to lateral (horizontal) forces and moments. In fact, there are some structures where the primary function of piles is to transfer lateral loads to the ground. Prope
Jan 1, 2015
-
Final Report – Workshop on Quality Assurance for Post-Grouted Drilled ShaftsBy Mary Ellen Bruce Large
"In partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC), Deep Foun
Jan 1, 2016
-
Workshop on Quality Assurance for Post-Grouted Drilled ShaftsBy Mary Ellen Bruce Large
"INTRODUCTIONIn partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC
Jan 1, 2016