  • DFI
    List Of Delegates

    AUSTRALIA CHAPMAN Gary JOHN WAGSTAFF CONTSRUCTIONS PTY. LTD. 1 Ashgrove Crescent 4060 ASHGROVE BRISBANE HILLAR Jaaes Director J.A. HILLAR & ASSOCIATES 99 Woolwich Road WOOLWICH,

    Jan 1, 1994

  • DFI
    250 M Ultra Deep Milled Diaphragm Wall: The New Frontier for the Cut off Wall Depth has Been Doubled by Trevi Group Technology

    By Maurizio Siepi, Stefano Trevisani, Pagliaccim Federico, Daniele Vanni

    "Abstract: The paper describes a large innovative project completed in 2012-20123 by Trevi Group, to develop equipment capable to install ultra-deep diaphragm wall. The project highlights the capacity

    Jan 1, 2014

  • DFI
    Deep, Large Diameter Bored Piles In Hong Kong, Two Selected Cases - Synopsis

    By Yvone Franco Crosato

    The dense population of Hong Kong requires the construction of tall buildings in reclaimed areas or perched on the slopes of the many hills. The large loads to be supported are carried by deep foundat

    Jan 1, 2000

  • DFI
    Continuous Grouting In Embedding Of Sheet Piles

    By Jouko L. Lehtonen

    Sheet pile walls can be sealed watertightly using various methods. The objective of this paper is to introduce a new innovation comprising the use of continuous cement grouting during embedding. The m

    Jan 1, 2006

  • DFI
    Driven Pile Foundation Design And Construction Genentech Hall - UCSF Mission Bay Campus

    By Robert E. Fosse

    Driven 14-inch-square concrete piles were used as the foundations of Genentech Hall at the new University of California, San Francisco Mission Bay Campus. The five-story, steel eccentrically-braced fr

    Jan 1, 2002

  • DFI
    Centrifuge Modeling of Temperature Effects on the Pullout Capacity of Energy Piles in Clay

    By John S. McCartney, Ismaail Ghaaowd

    This study presents the results from centrifuge modeling experiments performed to understand the effects of temperature changes on the pullout capacity of scale-model energy piles embedded in normally

    Jan 1, 2018

  • DFI
    Quality Control For Installation Of Augered Cast-In-Place Piles

    By Francis J. Arland

    The installation of augered cast-in-place (ACIP) piles requires careful quality control to assure a successful pile installation. Unlike steel, pre-stressed concrete or other types of driven piles, wh

    Jan 1, 1997

  • DFI
    Vibration Environmental Effect Of Construction Operations - Synopsis

    By Mark R. Svinkin

    Construction vibrations may be harmful to adjacent and remote structures, sensitive instruments and people. Construction vibration sources have a wide range of energy, displacement, velocity and accel

    Jan 1, 2000

  • DFI
    Underground Parking Facilities In Rotterdam

    By Henk E. Brassinga

    In Rotterdam a number of underground parking facilities have been built and are under development in the inner city, and in the suburbs. These parking facilities are located at already densely built a

    Jan 1, 2006

  • DFI
    Lessons Learned From Installation Of ACIP Piles In Various Geologic Settings Of The NYC Region

    By Frank J. Arland

    Augered-Cast-in-Place piles have been used successfully for many deep foundation applications. The four case studies discussed herein describe ACIP pile projects where problems developed during ACIP p

    Jan 1, 2004

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work

    By Darrell L. Beddard

    Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai

    Jan 1, 1996

  • DFI
    Experimental And Theoritical Studies On Pile Capacity - Synopsis

    By K. Rambha Devi

    The paper is an attempt to co-relate the findings of pile capacity using a number of formula suggested by various authors with the actual field load test results. Five locations consisting of wholly s

    Jan 1, 1996

  • DFI
    Caisson Foundation For High Speed Paper Machine ? 1 ? Introduction

    By Anthony H. Tawil

    Modern, high-speed machines used in the manufacture of paper require foundations with stringent settlement constraints. To fulfill this requirement, caisson piles, extending into bedrock, were selecte

    Jan 1, 1987

  • DFI
    Securing Rail Infrastructure in Romania

    By Andreas Brandner

    "At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors

    Jan 1, 2017

  • DFI
    Analysis Of The Settlement Of A Single Axially Loaded Soil-Cement Pile

    By Jiwei Duan

    The deformation and load transfer behavior of a single soil-cement column are studied with the finite element method. The results show that there is an effective length for a soil-cement column. Beyon

    Jan 1, 2002

  • DFI
    A Proposal Of Calculation Of Piled Raft Foundations

    By Andrzej Tejchman

    Calculation of pile foundations should possibly truly reflect its real work, mainly with respect to the value and distribution of settlements, pile internal forces and bending moments within a slab. M

    Jan 1, 2002

  • DFI
    The Design Of Deepwater Wharves Which Are In The Complex Geological Conditions Of Pearl River Estuary

    By F. W. Liang

    The geology of pearl River estuary belongs in strong weathered rock quaternary geological systen, so the conditions are complication. Since 80's we built the first deepwater wharf of Shenzhen chi

    Jan 1, 1991

  • DFI
    Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? Summary

    By Chris Harnan

    This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques

    Jan 1, 2000

  • DFI
    Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In Driving

    By Hodjat] [Shiri

    A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in

    Jan 1, 2006

  • DFI
    Pittsburgh Steelers Stadium - Deep Foundations Case Study

    By Larry Rayburn

    In the spring of 1999, construction commenced on the new Steelers Football Stadium in downtown Pittsburgh, Pennsylvania. Richard Goettle, Inc. (RGI) was the successful bidder to install the specified

    Jan 1, 2001