Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Integration Of Real Time Pile Design By Means Of Building Information ModelingBy Prof. Dr. -Ing. habil. Sascha Henke, Johannes Beck
The growth of Building Information Modeling (BIM) during recent years opens possibilities for integrating new digitally driven design approaches. While parametric design and algorithmic design slowly
May 1, 2022
-
Corrosion Protection Of MicropilesBy Racquel Nottingham, Marc Mastrantuono
Micropiles often provide a favourable solution for many deep foundation problems especially when significant site constraints such as confined construction sites or vibration limitations have been ide
Oct 1, 2022
-
Corroboration and Remediation Options"After the non-destructive testing is completed, the data must be compiled, evaluated, and interpreted. During this process, the data may indicate that there is an anomaly warranting further investiga
Jan 1, 2004
-
DFI Model Piledriving Contractor ProposalWith respect to liability damages, claims and costs thereof relating to or ansmg out of contamination, special or non-special wastes, hazardous wastes or pollution in connection with the performance o
-
Non-Destructive Testing Methods For Drilled Shaft And Acip Piles (6922d0e7-932e-4be1-a810-c6fa95777bc9)By George Piscsalko
Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,
-
The Use of Advanced Electronic Features in Foundation Equipment Help or Hype for the User?By Manfred Schoepf
"Construction projects using the most advanced technologies and organizational structures demand intelligent construction machinery. In this process, automation technology plays an increasingly import
Jan 1, 2015
-
Surprises And Solutions When Driving Piles In Mountain Valleys Of VermontBy John E. Lens
Driving bridge foundation piles into glacio-fluvial sands and gravels and glacial tills brought surprisingly longer than predicted driving lengths on several recent projects in Vermont. In some insta
Jan 1, 2007
-
LRFD and Its Implications for QC/QA of Deep FoundationsBy Bernard Hertlein, Chia K. Tan
"The move to LRFD methods for structural design by AASHTO, ACI, AISC , ASCE, and the FHWA has been a major change for the American construction industry. The deep foundations industry has arguably bee
Jan 1, 2005
-
Critique of Specifications for Deep MixingBy George Filz, Peter R. Cali
"Unnecessarily restrictive specifications could be limiting the cost effectiveness of deep mixing (DM) applications and therefore limiting use of DM on projects where there are other options. Excessiv
Jan 1, 2015
-
Shoring Up D.C.'s Historical Foundations: Collection 14By Alan Quiroga
Nestled between Meridian Park and Howard University in the heart of Washington, D.C., the historic block between 14th, V and W streets North- west featured several original struc- tures, many of them
Aug 1, 2023
-
Dynamic Lateral Response Of A Full-Scale Pile GroupBy Kyle M. Rollins
To improve our understanding of lateral resistance of pile groups, a series of lateral load tests were performed on a full-scale pile group using both static and dynamic loads. The pile group consiste
Jan 1, 2002
-
The Use of Bentonite in Underground ConstructionBy Hector Simchas
"1. BENTONITE: THE CRUCIAL CONSTITUENT OF SLURRYSuspensions of bentonite and water are used in a variety of applications in underground engineering. For the construction of underground elements like s
Jan 1, 2015
-
Uncertainties Arising During Drilling And Performance Of Flight Auger - Cast PilesBy F. M. Abdrabbo
Flight auger bored piles are formed by screwing a continuous flight auger into the ground, and pumping cement/sand grout or concrete down the hollow stem of the auger as its withdrawn. The auger is dr
Jan 1, 1993
-
Reliability Analysis of a Drilled Shaft Stabilized Slope System (e386e5ff-5c43-4c35-910f-4eb413f46379)By Lin Li
A reliability based analysis method for a drilled shaft stabilized slope system is presented in this paper. In the past effort, a deterministic method using the limiting equilibrium method of slices f
Jan 1, 2017
-
Real Time Monitoring Of Utility Vaults during Reconstruction of the Elliot Bay SeawallBy Pierre Gouvin
"This paper discusses real time monitoring of utility vaults during the reconstruction of the Elliot Bay Seawall in Seattle. The project, undertaken because deterioration of the old wall posed increas
Jan 1, 2017
-
A Comparative Study on Behavior of Bucket Pile in Sand According to Installation MethodsBy Jinung Do, Sung-Ryul Kim, Juhyung Lee
"Model tests have been performed to investigate the vertical, horizontal and cone tip resistances of bucket pile embedded in sand by different installation methods; suction force by pump and jacking f
Jan 1, 2016
-
The Choice between HSDT and RLT: Selection Criteria for Concrete Pile TestingBy P. Middendorp, Gerald E. H. Verbeek
"INTRODUCTIONStatic Load Testing (SLT) is generally considered the pile testing method that provides the de-facto answers regarding pile capacity and load-deflection behavior. However, as this testing
Jan 1, 2006
-
Building Drilled Shafts to Bridge the MississippiBy Brian Koch
Michels installed 242 drilled shafts to support the piers for a new basket-handle, true-arch twin bridge across the Mississippi River from Moline, IL to Bettendorf, IA. The installation of the drilled
Jan 1, 2019
-
Real-Time Anchor Testing and Data ManagementBy Bora Okumusoglu, Devon K. V. Mothersille
"AnchorTest is an innovative software package, specifically developed for tablets, that permits ground anchor test data assessment and management in real time. The solution has two components: a front
Jan 1, 2017
-
Doyle Drive – Extreme Pile InstallationBy Peter Faust
"The south access road to San Francisco’s Golden Gate Bridge, known as Doyle Drive or Presidio Parkway, needs to be replaced. Built in 1936, it is the primary highway and transit linkage through San F
Jan 1, 2012