Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
In-Situ Recovery in Hard Rock Applications: Idealistic Notion or Realistic Future Processing Option?By L. Vollert
In-situ recovery of metals is presently experiencing a revival not seen since early applications in amenable copper oxide deposits, uranium and generally applications where neither, porosity and perme
Jan 1, 2019
-
Sintering at ConistonBy A. G. Roach
Introduction The plant described in this paper is located at Coniston, Ontario, the smelting centre of the former Mond Nickel Company. Coniston is situated some eight miles east of Sudbury on the mai
Jan 1, 1932
-
Human Aspects of Automation - The Diamond Drilling Case StudyBy Helen Francis
Over the last decade, lower ore grades and deeper mine environments have demanded that mining companies develop new technologies (tools and processes) to ensure a mine?s economic sustainability. At In
May 1, 2002
-
Novel Method of Assessing Energetic Customer Baselines and Energy Savings in Mining ProcessesBy Constantin D. Pitis
Similarly to notions of constant capital/expenses in business or magnetization power for electric motors an energetic base load (E0) is always necessary to set up a mining process. Denominated as ?n
Oct 1, 2009
-
25 Years of Process Development: Gold ProcessingBy K. P. Wright
"Twenty-five years ago, there were about thirty-two gold mines operating in Canada; nine of these have been in continuous operation since then and are still operating. Three of these are part of the D
Jan 1, 1987
-
The Use of Rubber Mill Liners at Denison Mines LimitedBy L. Connolly, F. R. De Luca
"Rubber liners at Denison Mines Limited are used in 10 1/2x 24' low discharg0 pebble mills. These were originally 10 1/2 x 13 Dominion overflow type ball mills. Experience here shows that the wear of
Jan 1, 1974
-
Constructed Wetlands that Emphasize Sulfate Reduction: A Staged Design Process and Operation In Cold ClimatesBy T. R. Wildeman
"At the Big Five wetland, which was built to treat drainage from a metal mine, encouraging results have attributed to sulfate reduction. Cu and Zn were reduced to below detection limits of 0.50 mg/L,
Jan 1, 1992
-
Environmental Control Design at Shebandowan MinesBy T. Peters, W. C. Ferguson
"Shebandowan is about 600 miles west of Sudbury and 50 miles west of Thunderbay close to the trans Canada highway. Shebandowan Lake is about 38 miles long. The ore body is located between No. 1 and No
Jan 1, 1975
-
Applied Mineralogy in Industrial and Metallic Mineral Deposits: Examples from Wollastonite, V-magnetite and MuscoviteBy Panagiota Tsolis-Katagas, Basilios Tsikouras, Tassos A. Grammatikopoulos, C. Katagas
"Mineralogical techniques including microscopic methods, reflected and transmitted light microscopy, Cathodoluminescence (CL) and Scanning Electron Microscopy equipped with an Energy Dispersive Spectr
Jan 1, 2003
-
Turnagain Nickel Project: Playing a Key Role in the Development of Northwestern BCBy Ed Beswick
Resource Update Drilling Program ? Pre-feasibility ? Exploration Metallurgy Program ? Grindability ? Metallurgical Optimization ? Hydrometallurgical Options Preliminary Mine Development Design
May 1, 2008
-
Selecting of Appropriate Electrode in Fully Salt-Water by Fuzzy LogicBy S-E. Vandat
The goal of this work was to select an appropriate electrode for dummy load of diesel engine in fully salt-water in the DESA factory. The electrochemical corrosion rate of general structural steel, co
Jan 1, 2005
-
An investigation on minimizing reagent consumption in ammonium thiosulphate gold leachingBy Chen Xia, G. Deschenes, Wan-Tai Yen
"Ammonium thiosulphate is a potential replacement for the cyanide in gold leaching. However, the high reagent consumption hinders its practical applications. In order to reduce the thiosulphate consum
Jan 1, 2002
-
Introduction of China’s Copper Converting TechnologiesBy Huilan Yang, Feng He
This paper intends to introduce the development of copper smelting and converting technologies in China in recent years, with a particular emphasis on the introduction of various continuous converting
Jan 1, 2019
-
Barrick Goldstrike Roaster Facility Dry Grinding and LeachBy Dayle Denton, Lloyd Buckingham, Kenneth G. Thomas, Jacques McMullen
"The dry grinding and leaching circuits of Barrick Gold’s new Roasting Facility at Goldstrike Mine in Nevada, USA incorporate well proven technologies in a unique combination. During the design of the
Jan 1, 2001
-
Discrete event control and dynamic scheduling for tele-robotic miningBy T. Norvell, R. Gosine, S. O’Young
"This paper describes the use of dynamic scheduling and discrete event control to provide coordinated control of multiple automated vehicles. This work has been carried out within ongoing research int
Jan 1, 2003
-
Environment Driven Innovation of Hydraulic ExcavatorsBy Axel Doelcken
?? Liebherr excavators in standard configuration are generally designed to operate in an ambient temperature range between -12°C and +55°C (10.4 °F and 131°F). ?? To operate effectively and efficient
May 1, 2008
-
The economics of diamond projects in the Canadian Arctic (bbedb282-085a-4c62-8fa2-4245fef0430a)By W. Bullen
A hypothetical economic model has been developed for diamond projects in the Canadian Arctic using data from recent exploration and mining projects. The model reflects economic conditions applicable t
Jan 1, 2006
-
Red Lake Gold Mine Autoclave Optimization ProjectBy K. K. Murray, D. G. Gelderland
"The pressure oxidation autoclave at the Goldcorp’s Red Lake Gold Mines (RLGM) was commissioned in 1991. Since commissioning, the circuit has been well maintained and its capacity increased to mechani
Jan 1, 2017
-
Challenges & Improvements in Milling at Omai Gold MinesBy Gregg Vickell
"High tonnage, low grade gold mines such as Omai’s afford economies of scale that are unto their own insufficient to sustain profitability at today’s depressed gold price. Complimenting profitability
Jan 1, 1999
-
The Kumtor Gold Mill Start Up and Start up ChallengesBy John Kazakoff, Andrew Mortimore
"Production at the remote Kumtor Gold Mine in Kyrgyzstan commenced on schedule in December 1996.The ore mined during the first few months of 1997 from the upper benches of the pit did not produce the
Jan 1, 1999