Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Inflation in project evaluation

    By L. D. Smith

    "Those who submit competing proposals for projects seek to present senior management with complete and fully supported material that will not fail under questioning. Hopefully, misleading notions and

    Jan 1, 1987

  • CIM
    Froth Based Indicators as a Tool for Flotation Diagnosis

    By Patrick Pelletier Jr., Pierre-Alexandre Bossé, Gianni Bartolacci, Ian Orford, Steve Parent

    "Over the last decades, many authors have shown the importance of froth in the flotation process. Mineral recovery is related to froth recovery and flotation. Selectivity is affected by froth characte

    Jan 1, 2006

  • CIM
    Scales or Scoundrels

    By Ron Board

    "Probably the only thing that can he said about conveyor belt scales without fear of contradiction is that they have been responsible for as much or more puzzlement, argument and frustration than almo

    Jan 1, 1975

  • CIM
    An Overview of the Oil Sands Process, Comparing it to Conventional Mineral Processing

    By Gavin Ritson, Chris Ward

    "The oil sands industry is still fairly young with the first viable oil sand operation having been started in Alberta in 1960. Since then numerous modifications and improvements have been tried and im

    Jan 1, 2009

  • CIM
    Distinguishing ore types at the Lac des Iles PGE-gold-copper-nickel mine, Ontario: Implications for resource modelling, mining and processing

    By M. J. Michaud, M. J. Lavigne

    "A cornerstone of any successful mining project is an understanding of the mineral assemblage and metal distribution comprising the deposit. Knowledge of the precise mineral/ metal zoning enables an o

    Jan 1, 2003

  • CIM
    Westwood Project Acceleration

    Westwood Quebec Long Life, Low Cost CONSTRUCTION UPDATE ? Shaft advanced to 840m (after 1 year), 3 km of down ramp and 2 km of exploration drift ? Head frame and hoist room structure completed ?

    May 1, 2010

  • CIM
    Development of the SII “Mission” Mineral Sands Project

    By D. Settles, R. Rose, P. L. Dunn

    "A new mineral sands operation is being developed in Georgia by Southern Ionics, Inc. (SII). Prevailing mineralogy and certain design constraints required detailed testing and circuit analysis to cre

    Jan 1, 2015

  • CIM
    Replacement of Diatomaceous Earth Filter Aid with Alpha-Cellulose at the Laronde Refinery

    By François Robichaud

    "The Laronde mill has been in operation since 1988. Actual milling rate ranges from 7,000 to 8,500 mtpd. Laronde uses SAG/ball mill grinding followed by copper and zinc flotation circuits. A cyanidati

    Jan 1, 2007

  • CIM
    Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approaches

    By A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak

    A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic

    Jan 1, 2007

  • CIM
    Optimization of the paste backfill plant at Louvicourt mine

    By J. Cayouette

    In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum through

    Jan 1, 2003

  • CIM
    Developing Greater Synergy Among Geologists, Mineral Processors and Mining Engineers/Operators

    By Marcel Vallée

    Frequently, costs overruns and defaults in mining project performance result in serious problems and headaches for all project participants and impact on corporate objectives, profits and image and, o

    May 1, 2002

  • CIM
    Recent Advances and Applications of Radiometric and Photometric Sorting

    By J. R. Goode

    "Coarse ore sorting is here defined as the physical separation of a mixture of coarse (+3/8 inch) ore particles into two or more separate groups of total value greater than that of the unsorted ore. A

    Jan 1, 1975

  • CIM
    An Approach to Energy Management at Falconbridge Nickel Mines Limited

    By D. M. Doyle

    A study of the various components contributing to energy costs and their relationships to generally trended operating data, such as tonnage, operating costs, etc., over progressively shorter time peri

    Jan 1, 1979

  • CIM
    Fine Grinding Investigations at Lake Shore Mines

    By The Staff

    THE object of the work was to increase the capacity of the plant and, if possible, to reduce costs of the actual unit grinding while doing so. The accompanying assays of an infra-sizer analysis of the

    Jan 1, 1940

  • CIM
    High Self-Heating Rate of a Pyrrhotite-Rich Material: H2S as a Fuel?

    By James A. Finch, Stéphanie Somot

    "The self-heating facility developed at the Noranda Technology Centre [Rosenblum and coworkers, 2001; 1995] has now been established in the Department of Mining, Metals and Materials Engineering at Mc

    Jan 1, 2006

  • CIM
    A regressive mode of highwall failure in coal strip mines

    By B. Stimpson, K. Kosar, K. Barron

    "A number of high wall failures have occurred in some of the Alberta coal strip mines of a type called by the authors ""Multiple block plane shear slope failure "". They cause rapid deterioration of t

    Jan 1, 1986

  • CIM
    Traitement des eaux contaminées - Mine Restigouche, Nouveau-Brunswick

    Plan de l?exposé ?? Présentation du site de la mine Restigouche et du mandat confié à Genivar ??Dénoyage de la mine ??Processus d?enlèvement des boues au fond de la fosse ??Utilisation de Géotubes

    Feb 1, 2008

  • CIM
    Crystallex’s Las Cristinas Gold Project (7d5d7696-3ce9-4e3a-a905-204bcf9d3fae)

    By J. R. Goode

    "The Las Cristinas deposit contains about 10.2 million ounces of gold at a grade of 1.3 g/t. The deposit comprises a layer of fully oxidized saprolite (SAPO), a layer of sulphide-enriched saprolite (S

    Jan 1, 2004

  • CIM
    Geology of the Ore Fault Ni-Cu Deposit, Bird River Sill Complex, Manitoba

    By P. Walford, C. Mealin, D. Good

    "The geology of the Ore Fault Ni-Cu deposit has been reinterpreted in the light of recent studies of the geology of the Neoarchean Bird River Sill Complex and the occurrence of economic Ni-Cu and Zn-C

    Jan 1, 2009

  • CIM
    In Kiruna mineral processing starts underground - bulk sorting by LIF

    By Åke Krukka, Heribert F. Broicher

    "The iron ores of the Kiruna Mine in Sweden are of exceptional quality but for the phosphorus content in certain zones of the orebody. The prevention of mixing ores high in phosphorus with those low i

    Jan 1, 2002