Search Documents

  • ISEE
    Cast Blasting in the Light of the Electronic Option

    By Winfried Rosenstock

    The development of electronic initiation systems has partially reached or will reach in a short period of time full reliability for general use without limitations. Unfortunately those systems meet wi

    Jan 1, 2003

  • CIM
    Development of the SII “Mission” Mineral Sands Project

    By D. Settles, R. Rose, P. L. Dunn

    "A new mineral sands operation is being developed in Georgia by Southern Ionics, Inc. (SII). Prevailing mineralogy and certain design constraints required detailed testing and circuit analysis to cre

    Jan 1, 2015

  • AUSIMM
    Pipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric Field

    Pipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric Field

    Sep 13, 2010

  • DFI
    Application Of Global Strain Extensometer (Glostrext) Method For Instrumented Bored Piles In Malaysia

    By Abdul Aziz Hanifah

    A novel instrumentation and analysis technique, called GLOSTREXT method has recently been introduced for bored pile load tests in Malaysia. This technique provides an innovative and improved alternati

    Jan 1, 2006

  • NIOSH
    A Rock Mass Rating Scheme For Clastic Sediments Based On Geophysical Logs

    By Terry P. Medhurst, Stuart A. MacGregor, Peter J. Hatherly

    In addition to fractures and joints, compositional factors and bedding influence the strength of clastic sedimentary rocks. Rock mass rating schemes must therefore consider all of these factors. In

    Jan 5, 2007

  • CIM
    Financing From the Perspective of Mining Companies

    By Eric Low

    Raising capital by issuing debt or equity is necessary in almost every corporation. In the field of corporate finance, the raising of capital is a heavily-studied topic. However, some of what is studi

    May 1, 2011

  • AUSIMM
    Mineral Project Management - A Perspective from Four Decades in the Industry

    By J S. Dunlop

    At its most basic level, minerals project management may be broken down into a series of logical chronological phases, described in this paper as: exploration, discovery; scoping and pre-feasibility;

    Jul 15, 2013

  • CIM
    Integrated Experimental and Thermodynamic Modelling Study of the Multicomponent “Cu2O”-FeO-Fe2O3-CaO-SiO2-PbO-ZnO-Al2O3 System

    By V. Prostakova, M. Shevchenko

    The copper smelting gas / slag / matte / metal / solids system with the Cu-Fe-Ca-Si-O-S major elements has been a long-term focus of the present overall research program using integrated experimental

    Jan 1, 2019

  • SME
    Solvent Extraction Separation of La, Sm and Dy from Sulfate-Phosphate Medium by CYANEX 272 in Kerosene Mining, Metallurgy and Exploration (25516173-62bf-4622-baf5-f08eb2deecf6)

    By I. M. Ahmed, R. S. Hassan, M. I. Aly

    Extraction and separation of La, Sm and Dy ions from acidic sulfate-phosphate solutions was investigated using a cation exchange extractant, bis(2,4,4-trimethylpentyl) phosphinic acid, CYANEX 272, in

  • CIM
    Leaching Of Copper Flash Furnace Dusts with Weak Acid Bleed and Arsenic Precipitation as Scorodite and Arsenical Jarosite

    By A. Roca, G. Ríos, I. Ruíz, M. Cruells

    Flash Smelting Furnace (FSF) hot dust-laden is cooled in a waste heat boiler (WHB) and then dedusted in electrostatic precipitators (ESP’s) before being treated, together with the Peirce Smith Convert

    Jan 1, 2019

  • AUSIMM
    Bottle Rolls versus Stirred Beaker Leach Testing – Which is Best?

    By G Small, A Lazamanana, C Greet

    When conducting gold leach tests on free milling gold ores which method is the best, bottle rolls or the stirred beaker test? Recently, a client requested that gold leach tests be conducted using the

    Sep 7, 2015

  • SME
    Water Jets And Rock Hammers For Tunneling In The U. S. And U. S. S. R.

    By William C. Cooley

    SUMMARY A review is presented of the state of development of high pressure water jet equipment and of large impact hammers for rock tunneling. Information from the U.S.S.R. is based on published li

    Jan 1, 1997

  • ISEE
    Small Scale Testing to Investigate Air Blast Loading on Plates

    By H Ulrich Leiste, Leslie Talor

    This paper describes a series of small scale tests conducted to investigate the loading applied to a flat plate by the detonation of a cylindrical charge very close (between two and three charge radii

    Jan 1, 2009

  • SME
    Evaluation of Post-blast Re-entry Times Based on Gas Monitoring of Return Air Mining, Metallurgy and Exploration

    By L. Yuan, J. H. Rowland, D. Bahrami, R. Thomas

    Blasting is the main method of production in many non-coal underground mining operations and produces multiple toxic gases as a result. The Mine Safety and Health Administration (MSHA) requires mine o

  • DFI
    Time-Dependent Bond Regain In Driven Piles In Permafrost ? Synopsis

    By B. Ladanyi

    The design philosophies for piles in unfrozen and frozen soils are compared, and their similarities and differences are underlined. It is shown that in frozen soils, the long term behavior of a pile i

    Jan 1, 2010

  • NIOSH
    RI 4742 Laboratory-Scale Work On Synthesis-Gas Production

    By J. J. S. Sebastian

    The process development described in this report was carried out at the Morgantown Station of the U. S. Bureau of Mines in cooperation with West Virginia University. An experimental laboratory-scale p

    Jan 1, 1950

  • DFI
    Design Considerations For Underground Subway Station - Introduction

    By Mohammed Z. Islam

    As cities are growing all over the world, the need for urban transportation facilities are on the rise. Designers (of these facilities) today are faced with a number of constraints for their design, o

    Jan 1, 1993

  • SME
    Monitoring Subsidence In The West: Problems And Analysis

    By John E. Rourke, O&apos

    This paper describes some of the results of a project for the design and demonstration of subsidence monitoring systems for underground coal mines. The project was designed to test monitoring systems

    Jan 1, 1982

  • CIM
    Transporteur Multi-Fonctionnel Pour Forage

    By Marcel Labbé

    La largeur de l?armature peut être modifiée selon les besoins du client entre 48 " et 64" de largeur totale, donc 2 sections de 24" à 32". Ceci permet à l?opérateur d?effectuer le démantèlement de l?é

    May 1, 2001

  • NIOSH
    RI 5141 Titanium Plant At Boulder City, Nev.: Its Design And Operation ? Introduction

    By C. T. Baroch

    The purpose of this report is to describe the design features and techniques used in operating a plant capable of producing about 1,500 pounds of titanium metal per day. The process used was based on

    Jan 1, 1955