Search Documents

  • AUSIMM
    Research on the Differential Flotation of Iso-Floatable Lead-Zinc Sulfide Ore

    Research on the Differential Flotation of Iso-Floatable Lead-Zinc Sulfide Ore

    Sep 13, 2010

  • AUSIMM
    Archaean Gold Systems of South Australia

    By A Reid

    The Late Archaean of South AustraliaÆs Gawler Craton contains significant potential for gold resources. The main targets of interest are migmatised gold style systems of which the Challenger deposit i

    Jan 1, 2007

  • IIMP
    Iniciativas y estrategias para el desarrollo comunitario en concertación con la minería: Experiencias en Southern

    By Guillermo Manrique

    El presente texto describe las estrategias planteadas por la empresa Southern para la convivencia pacífica con las comunidades afectadas por el desarrollo de las operaciones mineras. Para ello, se req

    Sep 13, 2001

  • SME
    Metals And Minerals Mining - Past And Future Trends

    By R. Mier

    The metals and minerals mining industry has evolved dramatically from the earliest objects ever made out of native copper circa 9,000 BC to the modern developments we see today. To better appreciate p

    Feb 27, 2013

  • SME
    Connections to Old Tunnels - Design Guidelines

    By Jozef F. Zurawski

    Increasingly new interceptors or new Combined Sewer Overflow (CSO) projects require connections to existing tunnels. More often than not, the existing facilities are old, in poor or questionable condi

    Jan 1, 2008

  • SME
    Effect Of Agglomeration Binders On The Copper Solvent Extraction Process

    By K. A. Lewandowski

    Binders have been suggested as an aid for agglomeration to improve copper recovery in heap leaching operations. However, it has not been established if the use of binders would negatively affect the s

    Jan 1, 2009

  • SAIMM
    A study of metal droplet distributions in slags during ladle treatment phase of secondary steelmaking

    By J. Ekengård, H. Srinath, M. Andersson, P. Jönsson, D. S. Sarma

    The present paper deals with mixing between the metal and slag phase during the ladle refining process, including vacuum degassing. Dispersion of metal drops in ladle slags has been studied. The resul

    Jan 1, 2004

  • SME
    Establishing Geotechnical Baseline Values for Deep Soft Ground Tunnels

    By John E. Newby

    The Brightwater Conveyance System consists of four tunnel segments in three tunnel con-tracts, comprising over 21,760 m (71,400 ft) of pressurized face tunneling in complex glacial and non-glacial sof

    Jan 1, 2008

  • SME
    Alumar: Improving Local Communities Capacities For Implementation A Sustainable Development Model. São Luis- Maranhão-Brazil.

    By D. Campos, J. M. Macedo, S. Chadwick

    The incorporation of low cost technology transfer to increase the ability of locals to acquire and maintain long term employment are key ingredients for sustainable industrial development. Alcoa’s Alu

    Jan 1, 2004

  • AUSIMM
    From Production to Sustainability Reporting - Towards Quantifying Sustainable Gold Mining

    Gold mining in Australia and globally has a long and variable history. In recent years, due to ongoing public concern over long-term environmental impacts, the mining industry globally has been moving

    Jan 1, 2007

  • RMCMI
    Talent Wars - Crisis or Opportunities

    By Leigh Freeman

    The War for Talent ?McKinsey & Company 1997 and 2000 survey ?2001 book by Michaels, Handfield-Jones and Axelrod, Harvard Business School Press

    Jan 1, 2007

  • SAIMM
    Steel Cleanliness And Hydrogen In Liquid Steel

    By R. Dekkers, J. Plessers

    The feasibility of using hydrogen to obtain clean steels is investigated. High hydrogen contents are generally considered as detrimental due to the risk of flakes, bubbles and breakouts during casting

    Jan 1, 2004

  • AUSIMM
    Metallurgical Practice in the Beach Sands Industry

    The history of the industry which recovers rutile and zircon from the heavy mineral beach sand deposits of Eastern Australia began with the initial discovery of zircon in 1895. Whereas a large number

    Jan 1, 1963

  • DFI
    Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? Introduction

    By Daniel L. Hanson

    This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently

    Jan 1, 1994

  • AUSIMM
    Tapping Water by Diamond Drill Holes

    ON mineral lease 38 of the Sulphide Corporation Limited, Broken Hill, a shaft was sunk in the early days Ior prospecting purposes and at the present time it is accessible as far as the 1000-ft. level

    Jan 1, 1919

  • AUSIMM
    The Production of Nuclear Grade Uranium Dioxide Powders From Australian Ores (7b2536c4-12d9-4a3b-abac-9212e2d5236f)

    Most types of nuclear power reactors use uranium dioxide fuel. Power reactors using natural uranium dioxide fuel are of special interest to countries such as Australia that have their own uranium supp

    Jan 1, 1970

  • SAIMM
    Shear band propagation in soft rocks: numerical simulation of experimental results

    By M. Castelli, C. Scavia, S. Marello, A. Allodi

    ABSTRACT – This paper investigates the possibility of interpreting the shear band evolution in hard soils and soft rocks as the result of shear propagation from pre-existing natural defects. Thesis do

    Jan 1, 2003

  • SME
    Assessing Ground Ahead Of TBm Tunnel Using Low-Interruption Wireless Seismic Reflector Tracing System

    By Takuji Yamamoto

    High-speed TBM excavation requires rapid ground assessment ahead of excavation, particularly in complex grounds. The Tunnel Reflector Tracing technology (TRT) developed by authors, uses seismic reflec

  • CIM
    LKAB Green Pellets

    By F. Lindroos

    A cornerstone in the LKAB Green Pellet concept is to produce pellets with a small footprint in terms of energy con-sumption, CO2 emission and emission of other elements harmful to the environment, lik

    May 1, 2011

  • SME
    Mill Feed: By 8 m Ore Block Assay, Or By 8 cm Rock Sensing? Sorting Technology Can Fill The Gap Between Mine And Mill.

    By G. Van Weert

    Mining project feasibility is projected from a geological model and a mining plan. Ore grade is assumed to be continuous, based on drill hole assays as much as 80 m apart. Eighty meter is 80,000,000 m

    Jan 1, 2008