Search Documents

  • CIM
    Geometallurgical Characterisation and Representative Metallurgical Sampling at Xstrata Process Support

    By J. Sliwinski, J. Oliveira

    "The application of geometallurgy and corresponding sample selection can take on several formats within industry. Current practice can range from a strictly geostatistical approach to one in which geo

    Jan 1, 2013

  • SME
    The Expectations For Coal: Is Our Government And The Coal Industry Prepared?

    By M. S. Miller

    With prevailing assumptions that plentiful domestic coal reserves will be available for meeting our Nation’s expectations for on future low emission, coal-fired power plants, major government funding

    Jan 1, 2004

  • AUSIMM
    Occurrence of Tin Ores at Torington, N.S.W.

    The Torington Lodes.This paper describes investigations into mineralogical, petrological and structural associations of cassiterite in occurrences of economic value. The work was carried out in three

    Jan 1, 1950

  • SME
    Optimization Of Multigravity Separation For Recovery Of Ultrafine Coal

    By M. Menéndez

    Enhanced gravity separation appears to be one of the most promising methods for processing all types of <200-µm coal feeds and tailings. Systems based on this technology are reviewed, and the results

    Jan 1, 2007

  • AUSIMM
    Use of Ferro-Wastes in Sinter Making

    By P S. Datta, V N. Misra

    Higher bed height up to 680 mm, including 30 mm hearth layer of sized return sinter and high suction below the grate bars up to 1400 mm WG have resulted in increasing the productivity to a level of 33

    Jan 1, 2002

  • SAIMM
    Modelling Explosive/Rock Interaction During Presplitting Using ALE Computational Methods

    By R. P. Jensen

    This is a sampling of the papers presented at the conference, the proceedings can be bought from the SAIMM Arbitrary Lagrangian Eulerian (ALE) computational techniques allow treatment of gases, liq

    Jan 1, 2000

  • SME
    Meeting the Challenges and Risks for Tunneling Under San Diego State University

    By Dave Ragland

    The SDSU tunnel and underground station are the first of these type facilities to be constructed by the Metropolitan Transit Development Board. Because there is no previous experience, and because tun

    Jan 1, 2001

  • SME
    Implementation Of Advance Control On Rougher Flotation At Teck Pogo Mine - Preprint 09-119

    The Pogo Mine, near Delta Junction, Alaska is a 2500 TPD gold operation employing processes including grinding, gravity, rougher flotation, leach, CIP, and E/W. An OCS(Optimizing Control System) exper

    Jan 1, 2009

  • SAIMM
    Sulphur From Smelter Gases And Sulphate-Rich Effluents (447c1963-4549-4273-ab9d-d556c7518bc3)

    In extracting base metals from orebodies, sulphide as well as oxide, the main environmental concern is sulphur, whether in the form of sulphurous gases or sulphate in liquid form. Generally sulphur is

    Jan 1, 2005

  • SME
    Characterization And Contamination Assessment Of Mine Waste Piles And Sediment Materials In Gilpin County, Colorado

    By R. Abel, T. Wildeman, N. Heflin

    A study was conducted to assess environmental effects of waste rock piles on water in the Russell Gulch area. Each pile was rated on physical characteristics of proximity to an ephemeral gulch, extens

    Jan 1, 2004

  • CIM
    Dye Penetration Techniques Used to Determine Heap Leach Potential of a Telluride bearing Cripple Creek Breccia Ore

    By Marc D. Melker, Geoffrey R. Lane, Michael Jahraus

    "The Cresson gold deposit is located in the Cripple Creek district of Colorado. The deposit is composed of volcanic intrusive rocks and volcanogenic sediments where gold mineralization is associated w

    Jan 1, 2006

  • CIM
    ERG Tailings Retreatment Project

    "INTRODUCTIONGold tailings retreatment plants have been operated for many years throughout the world. Several large tailings retreatment facilities have been operated profitably in South Africa since

    Jan 1, 1989

  • CIM
    Closing the loop—Using actual concentrator performance to determine the true value of ore sources

    "The Antamina orebody is a geologically complex, polymetallic skarn located in the Peruvian Andes. A range of copper and copperzinc ores are campaigned separately through the concentrator producing co

    Jan 1, 2005

  • AUSIMM
    Improving Pentlandite Selectivity Over Pyrrhotite Using Reagents

    Improving Pentlandite Selectivity Over Pyrrhotite Using Reagents

    Sep 13, 2010

  • AUSIMM
    Adapting the Ernest Henry Mining Concentrator to Process the Mount Margaret Ores

    By D Brooks, S Gunn, T Perkins, J Siliezar

    Ernest Henry Mining (EHM) is a copper, gold and magnetite mining and processing operation located 38km north east of Cloncurry. The EHM ore body has an average grade of 0.9% copper (chalcopyrite), 0.5

    Jul 15, 2013

  • SME
    Designing, Scheduling And Managing Waste Rock Facilities - A Case Study On The Waste Rock Facilities At The Phoenix Mine, Nevada.

    By V. Galla

    Waste rock facilities (WRF) generally have a large footprint depending on the strip ratio the mine plan provides. Considerable planning is involved during the initial phase of the mine plan regarding

    Jan 1, 2011

  • NIOSH
    RI 7171 Effect Of End Conditions On Determining Compressive Strength Of Rock Samples

    By John R. Hoskins

    The Bureau of Mines conducted an investigation to more exactly define the influence of some end conditions on the laboratory-determined uniaxial compressive strength of rock samples. Limestone, marble

    Jan 1, 1968

  • CIM
    The G-9 Mine Story

    Overview ?G-9 Discovery Hole 420 drilled May 2005 ?14.16% Zn, 1.76% Cu ?Greenfield discovery built into the G-9 Mine in under 4 years. ?Utilized a unique ?Parallel Track? approach to fast-track min

    May 1, 2010

  • SAIMM
    The South African Legislative Framework For Mine Closure

    By E. Swart

    The purpose of this paper is to provide an overview of the current legislative framework for mine closure within South Africa as well as the new requirements in terms of the Mineral and Petroleum Reso

    Jan 1, 2003

  • SME
    Ground Freezing for Boston Central Artery Contract Section C09A4, Jacking of Tunnel Boxes

    By Paul C. Schmall, John F. Donohoe, Arthur B. Corwin, Derek Maishman

    Ground freezing was utilized to provide complete stability of the excavation face and complete groundwater cut-off for the jacking of the three tunnel boxes for the Interstate 90 / Interstate 93 appro

    Jan 1, 2001