Search Documents

  • NIOSH
    OFR-39A-94-Vol. 2 Ergonomic Analysis Of Surface Taconite Maintenance Work - Final Report - Volume 2 -Appendices - Appendix A - Human Factors Research Program, U.S. Bureau Of Mines Twin Cities Research Center - U.S. Bureau Of Mines - Mission

    Our mission is help ensure our country has an adequate, dependable supply of minerals and mate al to meet its national security and economic needs at acceptable social, environmental, and economi[c] c

    Jan 1, 1994

  • SME
    Signifcant developments in dry rare-earth magnetic separation

    By M. Dobbins

    The advent of the more efficient and effective rare-earth roll (RER) separator in the early 1980s began a new era of dry magnetic separation. The RER units quickly became the separator of choice withi

    Jan 1, 2010

  • AUSIMM
    The Mineralogy and Paragenesis of the Crocidolite Veins at Wittenoom Gorge, W.A.

    Several factors contributing to the loss of fibre during treatment are a function of the paragenesis of the veins. The occurrence, of magnetite from the cap rock within the veins prevents complete fib

    Jan 1, 1963

  • AUSIMM
    Development of an On-Site Mineralogy Solution for Metallurgists

    By D van der Wal, R Dobbe, K Moeller

    "Ore mineralogy and texture are primary variables controlling mill recovery efficiency in flotation plants. However, tracking daily variations of key mineralogical characteristics such as species-by-s

    Jul 15, 2013

  • DFI
    Diaphragm Wall Construction In Hong Kong

    By Arturo Ressi di Cervia

    The utilization of diaphragm wall construction in Hong Kong began in 1974 with the construction of the New World Center, the first diaphragm wall job built in the British Colony. That landmark job

    Jan 1, 1993

  • IIMP
    Evolución del método de minado de mina Chupa Unidad Minera Iscaycruz

    By José Cuadros

    "El presente trabajo señala el proceso de evolución del método de minado en la mina Chupa, perteneciente a la unidad minera de Iscaycruz. La evolución del método de minado se determinó por la búsqued

    Jul 31, 2003

  • DFI
    High-Capacity Rock Anchors Provide Uplift Resistance For Concrete-Filled Steel Pipe Piles - A Case Study

    By James Weaver

    During the past 16 years, the authors have successfully used high-capacity rock anchors installed inside open-ended pipe piles, driven to bedrock, to provide uplift and overturning resistance for vari

    Jan 1, 2011

  • CIM
    Design techniques for sublevel caving layouts

    By D. A. Trotter, G. J. Goddard

    "This paper describes a method of deciding on various design parameters for a sublevel caving layout. Layout design curves are obtained from the output of a computer optimization program. The program

    Jan 1, 1981

  • DFI
    Ensuring Performance of Tip Post-Grouted Bored Piles (Drilled Shafts) Through a Comprehensive Quality Assurance Program

    By Mary Ellen Bruce Large, Antonio Marinucci, Silas C. Nichols

    Tip post-grouting of bored pile (drilled shaft) foundations refers to a method where cementitious grout is injected beneath the tip of a shaft to improve the overall performance of the constructed fou

    Jan 1, 2018

  • AUSIMM
    Process Control Integration into a Brownfields Iron Ore Plant as Applied to the Khumani Iron Ore Mine

    By D Matthews

    With a brownfield project comes control integration challenges. The Khumani Iron Ore Mine’s second phase expansion posed a number of challenges as there was substantial brownfields work conducted. The

    Jul 11, 2011

  • DFI
    Current State Of Practice Of Corrision Protective Systems For Tierods And Tiebacks Used In Marine Applications ? Introduction

    By Thomas A. Printz

    The wide use of carbon steel in construction and engineering projects makes this engineering material accountable for approximately 85% of the total annual steel production worldwide. Despite the lac

    Jan 1, 2013

  • CIM
    Bridging the Gap Strategy to Execution

    PERSPECTIVE ?Natural resources exploration, extraction and beneficiation is complex and challenging: ?Input costs rising, complexity increasing, rising stakeholder management needs, regulatory compl

    May 1, 2013

  • AUSIMM
    The Colorimetric Determination of Molybdenum in Soils, Sediments, and Rocks by Zinc Dithiol

    Samples weighing O· 2 g are digested with 2 ml of 72 per cent perchloric acid for 2 hr at 180°C, and then diluted to 10 ml. with water. After settling, an aliquot of clear solution is reduce

    Jan 1, 1970

  • SME
    Longwall Mining, Shale Gas Production, and Underground Miner Safety and Health

    This paper presents the results of a unique study conducted by the National Institute for Occupational Safety and Health (NIOSH) from 2016 to 2019 to evaluate the effects of longwall-induced subsurfac

    Jan 7, 2020

  • DFI
    Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation Remediation

    By Michael Arnold, Bob Faulhaber, Joe Nichols

    "Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam

    Jan 1, 2017

  • SME
    Implementing and using a fully integrated maintenance management information system

    By Paul D. Tomlingson

    Part two of this two-part series covers the use of an integrated information system with administrative information, including error and absentee reports as well as open work files. Part one (ME, J

    Jan 8, 1985

  • AUSIMM
    Distribution of Assay Values in Some Western Australian Gold Ores

    In gold ores, the range of value disclosed by ordinary mine sampling is very wide, and the number of 'samples required for a reliable average is correspondingly great. Even where a large number o

    Jan 1, 1950

  • AUSIMM
    Bulk Shipping of Industrial Minerals

    By French D

    In presenting this paper may I preface my remarks by recognizing the presence here to-day of the many delegates from the overseas mining communities throughout the world. That is to say - those del

    Jan 1, 1989

  • SME
    Cyanide Leach Process Bans: The Technical Side

    By C. A. Young

    Cyanide is a fast-acting, highly toxic substance but, at the same time, is deemed essential for sustaining life as well as our standard of living. In this manuscript, the facts about cyanide are pres

    Jan 1, 2001

  • SME
    TARP Tunnel Boring Machine Performance Chicago

    By William A. Macaitis, Frank E. Dalton, Leo R. DiVita

    The Metropolitan Water Reclamation District of Greater Chicago's Tunnel and Reservoir Plan (TARP) is a multi-purpose urban public works project with a total cost of $3.7 billion. Currently 51 mil

    Jan 1, 1993