Search Documents

  • NIOSH
    Mineral Indicators - Aluminum (52afa842-f160-4911-9105-d0cbeea5ddcb)

    Aluminum Production. -By October 1, Aluminum Company of America will restart a 35,000-ton-per-year unit at its aluminum smelter at Rockdale, Tex., restoring that facility to its full capacity of 325,0

    Jan 1, 1980

  • AUSIMM
    Ultrasonic Extinction for High Resolution Particle Size and Concentration Analysis

    Ultrasonic Extinction for High Resolution Particle Size and Concentration Analysis

    Sep 13, 2010

  • SME
    RockVision3D™ Applications to Delineate Hazardous Geologic and Stress Conditions in Coal Mines—Case Histories

    By K. Y. Haramy, K. Hanna

    Early identification of adverse geologic conditions and high stress concentrations during the high-speed extraction of coal using modern mechanized longwall systems is a major challenge facing the min

    Jan 1, 1999

  • TMS
    Precipitation Of Hematite From Metallurgical Processing Streams By Hydrolysis In The Presence Of Anionic Resins

    By S. Djaroudib

    Keywords: iron recovery, hematite, hydrolysis, polyvinylpyridine The precipitation of hematite (Fe2O3) from ferric chloride media at ambient pressure and at temperatures below 100°C was studied as

    Jan 1, 2005

  • NIOSH
    RI 9458 - Behavior of Simulated Longwall Gob Material

    By Reno M. Pappas, Christopher Mark

    This report presents results of a U.S. Bureau of Mines study of longwall gob material. The objective of this work was to determine material stiffness properties of the gob for use in numerical models

    Jan 1, 1993

  • SAIMM
    Design Principles for Optimizing an Established Survey Slope Monitoring System

    By N. Mphathiwa

    When slope angles are designed during open pit optimization, there is a risk factor applied in steepening the slopes. The steepening of slope angles has implications for the safety and economics of th

    Jan 1, 2014

  • ISEE
    Liquid Propellant Technology

    By Stanley Griff, William Herrera, William O. Seals

    "The Navy initiated liquid propellant research in the early 1940's. The first promising Navy liquid propellant, Otto Fuel II, was developd in the early 1950 as a potential torpedo fuel. Later, the Nav

    Jan 1, 1990

  • DFI
    Value Engineering And Field Testing Of Pre-Cast Concrete Piles For The kcICON Project

    By Elizabeth M. Smith

    The kcICON design-build project in Kansas City, Missouri includes widening the existing roadway, improving interchanges and grade separation bridges, and replacing the Missouri River Bridge. The Miss

    Jan 1, 2009

  • SME
    Technical Note - Mine modifications for economic survival —a case study

    By R. L. Grayson, G. Mishra

    Introduction Many old underground mines have been developed extensively into reserves requiring large numbers of workers to maintain and rehabilitate lengthy track haulages and/or belt conveyor sys

    Jan 3, 1987

  • SAIMM
    Total Primary Milling Cost Reduction By Improved Liner Design - Synopsis

    By J. Dahner

    Total milling cost is composed of energy, liner and grinding media costs. In primary high ball load milling, the grinding media play the biggest role in total milling cost. This cost can be drastical

    Jan 1, 2011

  • NIOSH
    Recent Developments In Coal Mining Safety In The United States

    By R. G. Gürtunca, J. A. Breslin

    This paper briefly describes the progress in mine safety in the United States, with emphasis on recent events that have followed since the explosion at the Sago Mine in January 2006. Legislation follo

  • AUSIMM
    Improved Copper Flash Smelting at Olympic Dam

    By W Taylor, S Chen, R Haywood, M White, R West, J Ranasinghe

    In March 2012 a combined BHP Billiton and Hatch team embarked on a program to improve the concentrate burner efficiency of BHP Billiton’s Olympic Dam copper flash smelting furnace. A multi-faceted app

    Sep 7, 2015

  • SME
    Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project

    By Brian Fulcher

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft 3/sec) of water into Southern California. The 1

    Jan 1, 2008

  • NIOSH
    IC 9183 Mine Drainage And Surface Mine Reclamation - Proceedings Of A Conference Sponsored By The American Society For Surface Mining And Reclamation, The Bureau Of Mines, And The Office of Surface Mining Reclamation And Enforcement.

    Mine waste and mine reclamation are topics of major interest to the mining industry, the government and the general public. This publication and its companion volume are the proceedings of a conferenc

    Jan 1, 1988

  • SAIMM
    Plenary Address: Electrochemical processing using slags, fluxes and salts

    By D. Fray

    Electrochemical processing using molten electrolytes is undergoing a considerable renaissance due to several innovative ideas being explored both in the laboratory and also at the pilot scale. Several

    Jan 1, 2004

  • ISEE
    Maximizing Drill Factors in Construction Blasting

    By Pat McLaughlin

    Blast design in the construction industry has often been based on past practice or powder factors. This is to some extent understandable, since construction projects do not have the longevity of minin

    Jan 1, 1994

  • DFI
    Static And Dynamic Tests For Evaluation Of The Vertical Load Bearing Capacity Of Piles - Summary

    By Madan B. Karkee

    The understanding and the development of sound theoretical basis concerning the pile foundations has been phenomenal during the past few decades, considering the thousands of years the piles have evid

    Jan 1, 1997

  • AUSIMM
    Structural Controls on the Development of a Mineralised Fault ù Fracture Network, NW Otago, New Zealand

    Vein swarms in metamorphic terranes such as the Otago Schist Belt, New Zealand provide evidence of past hydrothermal flow systems leading to fault initiation and reactivation. A major episode of hydro

    Jan 1, 2002

  • DFI
    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004

  • SAIMM
    A decision analysis guideline for underground bulk air heat exchanger design specifications

    By M. Hooman, W. M. Marx, R. C. W. Webber-Youngman

    This paper discusses a study that investigated different underground bulk air heat exchanger (>100 m3/s) design criteria. A literature review found that no single document exists covering all design c

    Jan 1, 2015