Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Sound Transit Link Light Rail Northern Extension
By Paul M. Godlewski, Joseph P. Gildner, David S. McAllister
With construction underway on the 22.5 km (14 mile) Initial Segment of the Link Light Rail transit system in Seattle (including the one-mile EPB-driven running tunnels and mined station at Beacon Hill
Jan 1, 2005
-
Case Study in Monitoring Mining Induced Subsidence Using Photogrammetry and Conventional Surveys
By Rodger C. Fry
Underground coal mining has been active within the East Mountain property since the mid 1950's. As a result, coal from two seams has been extracted within large areas allowing surface subsidence
Jan 1, 1986
-
OFR-136-78 Propagation Of EM Signal In Underground Mines
By Terry S. Cory
This report is a comprehensive summary of the results of the propagation measurements program conducted for the US Bureau of Mines under Contract H0366028. Data was gathered in the MF frequency range
Jan 1, 1977
-
OFR-48-78 Roof Bolting Hazard Analysis Study
By J. H. Adkins
The purpose of this research is to identify hazards associated with roof bolting and to make recommendations for procedural and equipment design changes to reduce those hazards. To that end, the proje
Jan 1, 1977
-
Water Tunnel in Liaoning Province, Northeast China
By Li Jiuping, Zhong Gang, Chen Yong Zhang, I. Michael Gowring
The Liaoning Dahuofang Reservoir Water Transfer Project is an important development for the Department of Water Resources of Liaoning Province in northeastern China. The 85.3 km water conduit will tra
Jan 1, 2007
-
Biographical Notice of Benjamin West Frazier, Jr., D.Sc.
By Edward H. Williams
IN the middle of the eighteenth century John Frazier and wife, Sarah Ingraham, removed from Boston, Mass., to Philadelphia, Pa., where he was held in such esteem that we find him one of the Committee
Sep 1, 1905
-
Impacts Of Ground Convergence On TBM Performance In Ghomroud Tunnel
By Ebrahim Farrokh
Ghomroud water conveyance tunnel project is under construction using shield Tunnel Boring Machines (TBM) for a total length in excess of 50 km. Phase 1 of the project included 36 km of tunnel divided
-
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio
By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert
PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with
Jan 1, 2007
-
RI 4591 Lead Smelting In The Ore Hearth III. Zonal Action In The Smelting Column
By G. L. Oldright
The first Report of Investigations of the present series (No. 4562) was on the fundamental properties of lead compounds, and the manner in which they set limits to the richness of lead products treate
Jan 1, 1949
-
RI 6632 Spectrochemical Analysis Of Tungsten
By Jr. Gabler
Methods for the direct spectrochemical determination of impurities at the parts-per-million level in tungsten metal and oxide are presented. Several published procedures were investigated and numerous
Jan 1, 1965
-
Leachability Of Nitrided Ilmenite In Hydrochloric Acid - Synopsis
By J. J. Swanepoel
Titanium nitride in upgraded nitrided ilmenite (bulk of iron removed) can selectively be chlorinated to produce titanium tetrachloride. Except for iron, most other components present during this low t
Jan 1, 2011
-
Evaluation Of Oxine-Type Ligand Coordination To Zirconium (IV) - Synopsis
By M. Steyn
[Zr(C9H6NO)4]?(HCON(CH3)2)?(H2O), where (C9H6NO) = 8-hydroxy quinoline (oxH), was synthesized and characterized. This tetrakis-coordinated zirconium complex crystallized in the triclinic crystal syste
Jan 1, 2013
-
An Evaluation Of Microseismic Activity Associated With Major Roof Falls In A Limestone Mine: A Case Study
By T. Bajpayee, J. Ellenberger
Microseismic monitoring and evaluation is one aspect of the National Institute for Occupational Safety and Health (NIOSH) research program. Roof falls are often preceded by a period of elevated micro
-
Design Risk Mitigations for Contract CQ028 of the East Side Access Project
By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso
INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p
Jan 1, 2007
-
Evaluation of Pollution of Mining Areas in Aspect of their Future Use and Development
By D. J. Pyra, J. Kudelko, Korzekwam W.
Polkowice region (Lower Silesia, Poland) is an area, where the copper mining activity started about 40 years ago and new technologies were applied. There are 3 underground mines, 3 processing plants,
Jan 1, 2005
-
Pile Design, Testing, And Installation For A Gated Dam ? Synopsis
By B. H. Moore
The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori
Jan 1, 2010
-
Spin-Fin Pile Technology
By Dennis Nottingham
Spin-fin pipe piles can develop large loads in tension, thus have evolved as a foundation product of great potential. Currently, over 500 spin-fin piles have been used successfully in dolphins, docks,
Jan 1, 1990
-
Application Of A Polymer-Based Sealing Material To Prevent Roof From Weathering
By Peter Zhang
The immediate roof at the test site consisted of laminated clay shale that is likely to be susceptible to weathering. With seasonal dry-wet cycles in the mine ventilation air, the roof in the intake
Jan 1, 2009
-
Optimising Plant Feed Quality and Process Performance Using Geoscan Elemental Analysis
By H Kurth
Geoscan is used for multi-elemental analysis of conveyed bulk materials in real time. It has been used for coal analysis since the 1990s, in the cement industry, and since 2003 for measuring mineral o
Sep 7, 2015
-
OFR-69(2)-75 Research And Development Contract For Coal Mine Communication System - Volume 2 - Section 1 - Analysis of Mine Communications
A working understanding of present coal mine communications equipment and its usage is an essential prerequisite to the determination of future communications systems needs. As a means of gaining this
Jan 1, 1974