Search Documents

  • SME-ICGCM
    Mitigating the Effects of High Horizontal Stress on Ground Control in An Underground Stone Mine: A Case History

    By John Ellenberger

    The nature of a stone deposit is rarely defined through exploration and engineering design, but more through the actual experience encountered as the mine develops; hence, issues with ground control a

    Jan 1, 2012

  • AUSIMM
    The Rate Variable Batch Test (RVBT) - A Research Method of Characterising Ore Floatability

    The Rate Variable Batch Test (RVBT) - A Research Method of Characterising Ore Floatability

    Sep 13, 2010

  • IIMP
    Innovación en Voladura Detonadores Electrónicos Sociedad Minera Cerro Verde

    By Gualberto Salas Torrelly

    El avance tecnológico en los sistemas de iniciación en voladura abarca desde el sistema convencional (Mecha de Seguridad y Fulminantes hasta el sistema de iniciación electrónica, donde a través de un

    Sep 12, 2005

  • SAIMM
    The Huntsman Approach to Flotation Frothers

    By Nobuzwe Makhotla, Sasha Boskovic, Steve Hearn

    "Mineral separation efficiency in flotation depends, to an extent, on the type of frother used. Huntsman develops and manufactures unique frothers which are suited for mineral processing applications.

    Jan 1, 2015

  • SME
    Caterpillar’s MINExpo Exhibit Includes a Day at Tinaja Hills

    By Steve Kral

    MINExpo INTERNATIONL 2000 was a good place for companies to introduce new products, technologies and services to the mining industry. Caterpillar took that a step further. The company hosted a one-da

    Jan 1, 2000

  • CIM
    Paste Backfill at the Brunswick Mine

    By Michael Cooper, Eric Konigsmann, A. Moerman

    "A paste backfill plant and underground piping distribution system was commissioned at the Brunswick Mine in June, 1998. Concentrator tailings, composed mainly of pyrite and lesser amounts of silicate

    Jan 1, 1999

  • ISEE
    Mining to Reduce Future Environmental Liabilities

    By Mark A. Williams

    "This paper was originally intended to be a presentation of a case study of two surface bituminouscoal mines in the southern Appalachian coal fields located within five miles of each other. These mine

    Jan 1, 1994

  • AUSIMM
    The Direct and Indirect Effects of the Reagent Suite on Froth Stability in Laboratory Scale Batch Flotation Tests

    The Direct and Indirect Effects of the Reagent Suite on Froth Stability in Laboratory Scale Batch Flotation Tests

    Sep 13, 2010

  • IOM3
    Problems of sampling in geoscience

    By J. C. Griffiths

    There are two kinds of problems concerning the elements of a population : the first is to estimate the proportion of some specific kind of element in the population, e.g. the amount of gold in a block

    Dec 1, 1971

  • DFI
    Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge Consortium

    By Jacob Chacko

    The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten

    Jan 1, 2011

  • DFI
    Design Of Cooper River Bridge Foundations

    By Osama Safaqah

    The new Cooper River Bridge will replace two existing bridges along U.S. Highway 17. The cable-stayed bridge will be one of the largest in the U.S and will connect the City of Charleston and the town

    Jan 1, 2005

  • SAIMM
    Spontaneous combustion risk in South African coalfields

    By B. Genc

    "The risk of spontaneous combustion is well known in the South African coal mining industry. In the coming years it is very possible that the incidence of spontaneous combustion will increase from cur

    Jan 1, 2015

  • SME
    Estimation Of Roof Strata Strength In Mine Roof Geology Information System (MRGIS)

    By D. X. Tang, G. Wilson, S. S. Peng

    Design and implementation of a roof bolting plan requires reliable geotechnical information of strata, such as rock strength, and locations of interfaces and voids/fractures. The drilling parameters o

    Jan 1, 2006

  • SME
    A Micro-Scale Investigation of the Adsorption of Collectors on Bastnaesite Mining, Metallurgy and Exploration (85616d6e-c7a6-4b57-8595-493361618312)

    By James Withers, Dongbo An, Jinhong Zhang

    A micro-scale investigation was carried out by applying atomic force microscopy (AFM) to study in situ the adsorption of various collectors, i.e., oleic acid, octanohydroxamic acid (HA), and salicylhy

  • SME
    A Micro-Scale Investigation of the Adsorption of Collectors on Bastnaesite Mining, Metallurgy and Exploration

    By James Withers, Dongbo An, Jinhong Zhang

    A micro-scale investigation was carried out by applying atomic force microscopy (AFM) to study in situ the adsorption of various collectors, i.e., oleic acid, octanohydroxamic acid (HA), and salicylhy

  • SME
    WMATA Use Of The New Austrian Tunneling Method For Lining And Support

    By Larry H. Heflin

    The Washington Metropolitan Area Transit Authority's Wheaton Station and tunnel design was completed and offered for bid in the Spring of 1983. The format was unique to the Authority: a four part

    Jan 1, 1985

  • ISEE
    New Dimensions in Initiation Systems

    By Curtis G. Kremer

    "New explosives initiation systems continue to be developed as new technologies make advancements possible. Due to recent initiator developments, explosives users now have the most reliable, accurate

    Jan 1, 1991

  • SME
    Probabilistic Approach To Project-Specific Political Risk Analysis For Mineral Projects

    By S. Dessureault, Z. Gavelan

    As globalization continues, sustainability and social responsibility has become essential in foreign mining investment. However this global trend and the increasing acceptability toward the globalizat

    Jan 1, 2004

  • DFI
    Capacity Of Piles And Settlement Of Pile Foundations

    By M. Mets

    Pile foundations have been used in Estonia since the beginning of 1960's. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo

    Jan 1, 2000

  • SAIMM
    Use a Can solve SO2 scrubbing system to better link your batch-operated furnace with its by-product sulphuric acid plant - Synopsis

    By P. Roy

    Smelting or converting of sulphide concentrates and mattes in a batch operation presents a challenge when directing the off- gas to a conventional acid plant. The Hindustan Zinc Ltd. (a division of th

    Jan 1, 2007