Mechanized Rock Excavation In MiningBy George H. K. Schenck
In this decade of the 1.970's it is forecast that eight billion cubic yards of rock will be excavated from 400, 000 miles of new tunnels, drifts and other underground workings in the western worl
Jan 1, 1974
-
Effective Analysis Of Soil-Pile Interaction Under Dynamic LoadsBy Inn-Joon Park
Major problems associated predicting soil-structure interaction behavior are based on the fact that soil is neither homogeneous nor elastic and soil properties are spatially variable. There also exist
Jan 1, 2002
-
Analysis of the Uncertainty by the Random Finite Elements Method of a Vertical Load Test of a Piled Raft Founded in Tropical SoilBy Cristhian C. Mendoza, Renato da Cunha, Bernardo Caicedo, Max Barbosa
"Abstract This paper shows that a raft alone is not sufficiently appropriate to address the uncertainty of underlying soil variability; therefore, a piled raft system is a better option for mitigating
Jan 1, 2014
-
Air drying of fine coal in a fluidized bedBy E. S. Peters, M. J. van Rensburg, M. Le Roux, Q. P. Campbell
"The demand for energy has continued to rise worldwide in line with population growth. The majority of South Africa’s electricity is supplied by coal-fired power stations. The amount of fine coal (-2
Jan 1, 2015
-
The North American Iron Ore Industry A Decade into the 21st CenturyBy J. D. Jorgenson
?? U.S. domestic production peaked at 120 Mt during years of the Korean Conflict120 Conflict ?? Pellet production increased, as highPellet high-grade ores decreasedores decreased ?? Until 1982 reces
May 1, 2011
-
Experimental And Numerical Modeling Of The Flow Field In An Industrial Bronze Caster ? Improving The Numerical ModelBy S. Eck
In previous work the influence of the casting speed on the flow field and the shape of the solidification front in an industrial 0.82 x 0.25 x 0.8 m³ bronze caster had been investigated. Both numerica
Jan 1, 2009
-
Sistemas de información aplicados a la seguridad e higiene mineraBy Fernando Altamirano
Dado que en las unidades mineras existen problemas respecto al manejo de la información relacionada a la seguridad, salud e higiene tales como que los reportes enviados a las autoridades competentes (
Aug 25, 2002
-
Cost-effective Air Separation Plants for the Mining and Mineral industryBy Goutam H. Shahani
Today, the mining and mineral sectors are being impacted by highly fluctuating supply ? demand, extreme price volatility and tremendous market uncertainty on a world-wide basis. This pattern is expect
Nov 1, 2011
-
Planning to Demonstrate Why High PPVs Work for Close-In BlastingBy Chris Breeds, Larry Leone, Jerry Wallace
Project Owners typically require General and Detailed Blast Plans when blasting close to important structures and specify the maximum allowable peak particle velocity for each potentially affected str
Jan 1, 2010
-
Agglomeration of Sulphide MineralsBy J. A. Finch, J. Vergouw
"Flotation selectivity becomes progressively more difficult to achieve with decreasing particle size. One of the possible problems is agglomeration, i.e. particles clustering together. One mechanism d
Jan 1, 1997
-
Content and Structure of a Plant Grinding Performance Management/Improvement SystemBy K. Bartholomew
The Functional Performance Equation for ball milling circuits provides plant staff with a new means to improve circuit performance. However, successful execution of a plant processing performance impr
Jan 1, 2015
-
Quality Control Of Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Piles ? IntroductionBy Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2003
-
Rich Hill, Arizona: Historic Gold District, Modern Gold RushBy Erik Melchiorre, M. Katherine Crombie, Dante Lauretta, Chris Gholson
Rich Hill, also known as Weaver District No. 2, is among the most productive placer gold locations in Arizona. Located near Congress, AZ (Fig. 1), this district hosted major placer rushes in the 1860
Jan 1, 2003
-
The Evaluation of Explosives Performance: an End Users Point of ViewBy N T. Moxon, L W. Armstrong
Explosive manufacturers have for many years provided a service to the mining industry which has,until recently, been unchallenged by mine operators. Today mine operators are more aware of the properti
Jan 1, 1991
-
Limestone – A Versatile Mineral In AgricultureBy J. Bleeck, G. Mahrt
INTRODUCTION Many excellent papers have been written and presented regarding agricultural lime and the subject has been covered extensively in books concerning soil science, fertilizing, limestone, e
Jan 1, 2006
-
Low Strain Integrity Testing Of Deep Foundations ? IntroductionBy Jay A. Berger
Nondestructive testing of deep foundations for integrity problems made great strides in the late 1980's. Inexpensive portable computers have allowed the immediate and rapid processing of field me
Jan 1, 1990
-
Geotechnical Milestones at Mount Lyell MineBy D A. Cuello, G B. Sharrock
The Prince Lyell orebody at Mount Lyell Mine has a rich mining history commencing with the open pit in 1935, which transitioned underground in 1972. Between 1972 and 2014 a total of 64 Mt was mined un
May 9, 2016
-
Reclamation Work Reclaims Gold Tailings in the Black Hills of South DakotaBy Fred D. Fox
Introduction Abandoned mill tailings deposits can be found throughout the northern Black Hills of South Dakota, indicative of mining activities that originated during the great gold rush days of 1875
Jan 11, 1984
-
Hand-Dug Caisson Foundation Of The International Trade Centre In Shenzhen ? SynopsisBy Y. G. Li
The design and construction of the hand-dug caisson pier foundation of the Shenzhen International Trade Centre are described in the paper. In addition discussions and inquires about the load-bearing c
Jan 1, 2010
-
Forensics Of Difficult Ground Conditions Leading To Advanced Solutions For Recovery Of An Abandoned Tunnel ProjectBy Faruk Oksuz, Phillip L. Covell, Martin Doll
A series of difficult ground conditions causing high groundwater inflows and hazardous gas intrusion abruptly halted the construction of a 6.4-meter (21-foot) finished diameter and 1,890 meters (6,200
Jan 1, 2007