Search Documents

  • SME
    BWARI Tunneling Underway

    By Thomas L. Richardson, David R. Chapman, Gary W. Gilbert

    The two contracts of the Big Walnut Augmentation/Rickenbacker Interceptor(BWARI) sewer project for the City of Columbus, Ohio total nearly 35,000 feet of 14and 12-foot diameter tunnel. EPB TBMs will i

    Jan 1, 2005

  • CIM
    Kansanshi Copper Smelter: The First Four Years of Operation

    By S. Hunt, D. de Vries

    Kansanshi Copper Smelter began operation in March 2015. The smelter features a single Isasmelt furnace for smelting, one 6-in-line electric furnace for matte-settling and slag-cleaning duties, four Pe

    Jan 1, 2019

  • AIME
    Zinc used for Money in Belgium and France

    By George C. Stone

    WHEN George C. Stone, a Director of the Institute, and so well known to our Members in connection with the Institute's many activities was abroad in 1.919, he secured an interesting collection of

    Jan 1, 1920

  • TMS
    Effect of Refractive Index on the Determination of Layer Thickness of 4H-SiC Homo-Epitaxial Films

    By Zhiyun Li

    Room temperature infrared reflection spectra of 2 n-type homo-epitaxial epifilms have been measured in the work. The effect of the refractive index on the determination of layer thickness using tradit

    Jan 1, 2010

  • SME
    Design and Construction of the Fields Point Tunnel Pump Station for the Narragansett Bay Commission CSO Abatement Program, Providence, Rhode Island ? Introduction

    By Geoffrey Hughes

    The Narragansett Bay Commission (NBC) is a regional sewer authority that serves ten communities in the Providence, Rhode Island metropolitan area. From 1992 to 1999, the NBC developed a comprehensive

    Jan 1, 2008

  • ISEE
    Presplitting Techniques and Field Controls

    The objective in controlled blasting is to reduce overbreak to control the final pit wall slope, shaft, drift ditch, bench, etc. to the final planned excavation limit. The six main types of controlled

    Jan 1, 1992

  • AUSIMM
    Stratigraphy of the Thomson Orogen – New Insights from Mount McLaren, North-east Australia

    By C Verdel, M Lee, A Oorloff, K Welsh

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Thomson Orogen is a large but poorly understood element of Queensland geology. Extensiv

    Mar 18, 2015

  • DFI
    Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? Introduction

    By Brian R. Zuckerman

    The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State

    Jan 1, 2002

  • SAIMM
    Sulphuric Acid Technology Utilised By Bateman Engineering (c5b3297b-2b92-4481-b163-175e821e0954)

    By W. Vorster

    Bateman Engineering Project's acid-plant track record goes back to 1977. Bateman Engineering can design sulphuric plants based on gas from sulphur burners, metallurgical off gas as well as pyrite

    Jan 1, 2009

  • TMS
    Fluid Flow And Transport Phenomena During Steel Refining And Casting Process

    By Lifeng Zhang

    The transport of fluid, heat ,and particles (bubbles and solid inclusions) in flowing molten steel is investigated in steel refining ladles, the continuous casting tundish, continuous casting mold and

    Jan 1, 2006

  • SAIMM
    A Hybrid Location Methodology

    By S. M. Spottiswoode

    The aim of the hybrid location method is to improve seismic event locations by reducing the effects of errors in the wave velocity of ray paths between each event and each recording site. We report on

    Jan 1, 2005

  • SME
    Enhanced Ex-Situ Mineral Carbonation At Ambient Conditions With Industrial Waste

    By B. Spigarelli

    Carbon dioxide sequestration by conversion to carbonates has become a promising option for CO2 storage. Experiments were conducted to determine the feasibility of CO2 sequestration at ambient conditi

    Jan 1, 2012

  • CIM
    Variable speed SAG milling

    By M. N. Brodie

    "The ability to adjust the speed of a SAG mill offers benefits to the process and to equipment maintenance. It can be provided with some slight effect on availability ranging from somewhat enhanced to

    Jan 1, 2003

  • SME
    Design and Construction of Dulles Airport Tunnels

    By Allan Sylvester, Paul E. Gabryszak, Diane R. Hirsch, David P. Field

    With construction of the first phase of the Automated People Mover (APM) Tunnels nearing completion, this paper will address how knowledge from recent Tunnel Boring Machine (TBM) and New Austrian Tunn

    Jan 1, 2007

  • CIM
    The Pierina Project: From Acquisition to Production

    By Barrick Pierina, John Frostiak, Igor Gonzales, Kenneth G. Thomas, Ken Manning

    "1.0 SummaryThe Pierina deposit was acquired in August 1996 when Barrick Gold Corporation purchased Arequipa Resources, a junior mining company with extensive land positions in Peru. At the time of ac

    Jan 1, 2000

  • SAIMM
    A Case Study On Stoping Shift Buffering At Impala Platinum: A Critical Chain Project Management Perspective ? Synopsis

    By R. C. D. Phillis

    Conventional stoping in hard rock mining is largely considered an operational environment. This paper suggests that stoping falls within the realm of a project management environment typified by uncer

    Jan 1, 2011

  • ISEE
    Wipfrag and Wipjoint - To Measure, Record and Predict Blast Results

    By John A. Franklin, Tom C. Palangio, Norbert H. Maerz

    WipFrag systems I and II have become the world standard in photoanalysis systems to measure fragmentation. Mines, quarries and excavating contractors can now easily measure blast results and track the

    Jan 1, 1997

  • TMS
    Effects of Organic Acids on Extraction of Cr(III) in Soils Contaminated by Chromium-Containing Slag

    By Youze Xu

    The effect of oxalic acid, acetic acid, citric acid and EDTA on extraction of Cr (?) in soils contaminated by chromium- containing slag was investigated using a batch of incubation experiment. The res

    Jan 1, 2009

  • DFI
    Newfoundland Transshipment Project: Design-Build Construction Of Oil Tanker Wharf Using Permanent Steel Jackets. - Summary:

    By Alun J. Davies

    This paper describes a design-build project for the construction of a tanker wharf for 150,000 dwt vessels. The tankers deliver oil from offshore oil fields to a Transshipment terminal on the south co

    Jan 1, 2000

  • AUSIMM
    Removal of Rate-Limiting Iron Precipitates from Low-Grade Copper Ore during Bacterial Leaching

    By Ralph B. S

    Bacterial leaching of low grade quartz felspar porphyry copper ore was studied in large-scale laboratory percolation leaching columns.Limitations in the release of soluble copper showed up before fift

    Jan 1, 1981