Search Documents

  • CIM
    Fugitive Dust Control at Porcupine Joint Venture – Dome Mine

    By John Folinsbee, Brian Danyliw, Tony Y. Chong

    "Control of fugitive dust has become increasingly important in the mining industry both from a health and safety and environmental standpoint. Mining operations in particular have required improved fu

    Jan 1, 2005

  • DFI
    Estimation Of Settlements Of Piles In Group

    By Kazimierz Gwizdala

    In the paper the method for estimation of settlement of vertically loaded piles in a group is presented. The method is generally based on the hybrid procedure with non-linear solution for single piles

    Jan 1, 2002

  • IIMP
    Remediación de pasivo ambiental de Ticapampa y creación de valor a los residuos inertes

    By Rony Yupanqui C

    El presente trabajo señala el proyecto de remediación de los relaves mineros realizado en la relavera Ticapampa, ubicado en el Distrito de Ticapampa – Huaráz, región Ancash, con el objetivo de remedia

    Sep 12, 2011

  • DFI
    The Type Of Wharf Structure On Soft Soil With Undulating Weathered Rock Bed

    By Sun Shao Xian

    The Port of Shekou is situated at Shenzhen Bay on the east side of the Pearl River estuary. Geological condition of the site is quite complicated. On top of the sea bed, there is a layer of soft silt

    Jan 1, 1991

  • SME
    Virtual Reality Simulator For Training Miners To Install Rock Bolts Using Jackleg Drill

    By J. Warmbrodt, D. Apel, D. Nutakor, L. Grayson, M. Hilgers

    MinerSIM is an augmented reality system with integrated hypermedia that is suitable for training underground miners in the basics of using a jackleg drill to install rock bolts. While statistical evi

    Jan 1, 2007

  • SAIMM
    Improving the quality of tinplated steel using a novel technique to study the effect of industrial process parameters - Synopsis

    By G. S. Maré

    Tin plating operations are of a complex nature due to the many operational variables that need to be controlled in order to create a product of required quality. The work in this report lays the bas

    Jan 1, 2010

  • SAIMM
    Modular Mixer-Settlers for SXPlant Sustainability

    By Henri Fredriksson, Rami Saario, Mark Weatherseed, Juri Matinheikki

    "The challenges facing the mining industry include complex ores and declining grades, together with increasing capital costs and environmental regulations. In addition, future commodity price uncertai

    Jan 1, 2015

  • DFI
    Piling The Gateway To Europe

    By Howard Roscoe

    Linking Ashford International Station to the new Channel Tunnel Rail Link required over 5000 rotary bored and CFA (continuous flight auger) piles to form tunnel walls and viaduct foundations and to su

    Jan 1, 2002

  • CIM
    Gyratory Crusher Wear Monitoring Using Laser Technology

    By Persio P. Rosario

    Crushing has proven to be of fundamental importance in mine mill integration at Highland Valley Copper (HVC). Highland Valley Copper has achieved large throughput and good quality control through the

    May 1, 2002

  • CIM
    Red Lake Gold Mine Autoclave Optimization Project

    By K. K. Murray, D. G. Gelderland

    "The pressure oxidation autoclave at the Goldcorp’s Red Lake Gold Mines (RLGM) was commissioned in 1991. Since commissioning, the circuit has been well maintained and its capacity increased to mechani

    Jan 1, 2017

  • NIOSH
    Case History Of The Response Of A Longwall Entry Subjected To Concentrated Horizontal Stress

    By D. Oyler

    The National Institute for Occupational Safety and Health (NIOSH) Pittsburgh Research Laboratory (PRL), RAG Pennsylvania and Strata Control Technologies of Australia collaborated in an intensive study

  • CIM
    Equity Silver Mines Scavenger Circuit

    By P. G. Semple

    "In January 1985, Equity Silver Mines Limited began operation of a cyanidation circuit to scavenge precious metals from the flotation tailings. At present, this process is treating 270,000 tonnes of t

    Jan 1, 1987

  • SME
    Beneficiation Of Terrestrial Resources For The Production Of Lunar Simulant Separates

    NASA has received direction for lunar habitation beginning in 2024. Prior to then, it will be necessary to learn about how lunar soil can be used to promote civilization on the moon. Questions must

    Jan 1, 2012

  • SAIMM
    Phasing Out Reverberatory Furnace Operations At KCM Nkana

    By M. Natarajan, C. J. Cutler, E. Mponda

    Keywords: Pyrometallurgy, furnace, KCM Nkana, Zambia The Nkana smelter was initially commissioned in 1931, with two reverberatory furnaces, two Peirce-Smith converters, and blister copper casting

    Jan 1, 2006

  • SME-ICGCM
    Comparison Of Empirical, Analytical, And Numerical Methods Of Pillar Design And The Development Of A Site Specific Pillar Formula

    By Vincent A. Scovazzo

    Many accepted and useful methods have been developed and used for pillar design. Each method has its own particular strengths and weaknesses. Three methods addressed in this paper are; empirical, anal

    Jan 1, 1995

  • IIMP
    Trazadores litogeoquímicos de fertilidad del magmatismo vinculado a pórfidos de Cu (-Mo, -Au) en el sur del Perú, del Jurásico al Mioceno

    By Alonso Marchena, William Martínez, Joel Otero

    En Arequipa, Moquegua y Tacna se han definido diversos arcos magmáticos. En los arcos jurásico, paleoceno y oligo-mioceno ocurren pórfidos de distintas características, los cuales presentan diferencia

    May 22, 2019

  • SME
    Developing a Softwall Mining Machine

    By K. S. Mortensen

    The softwall mining system is a novel, new method of mining mineral deposits in soft, shallow, nonrock ground conditions. This method can mine the ore layer without substantially disturbing the exist

    Jan 1, 2003

  • SME
    An American Down Under Living And Working In Australia - Introduction

    By J. G. Pippenger

    The mining industry has been Australia?s major economic driver over the past decade, contributing 8% to Australia?s Gross Domestic Product and 26% of Australian Stock Exchange Market capitalisation.

    Jan 1, 2011

  • SME
    Loosening And Face Stability With Shallow Overburden In The ?Sitina Tunnel,? Bratislava, Slovakia

    By Chikaosa Tanimoto

    INTRODUCTION Bratislava is located at the intersection of important traffic routes, including motor-ways, roads, railways, air traffic, trading, and inland waterway with an important harbour. The con

  • DFI
    The Analysis Of Results From Routine Pile Load Tests

    By Bengt H. Fellenius

    THIS PAPER deals with the analysis of results from axial testing of vertical single piles, i.e. the most common field test per-formed. Despite the numerous tests which have been carried out and the ma

    Jan 1, 1988