Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Impacts Of Ground Convergence On TBM Performance In Ghomroud Tunnel

    By Ebrahim Farrokh

    Ghomroud water conveyance tunnel project is under construction using shield Tunnel Boring Machines (TBM) for a total length in excess of 50 km. Phase 1 of the project included 36 km of tunnel divided

  • SME
    Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio

    By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert

    PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with

    Jan 1, 2007

  • SME
    Design Risk Mitigations for Contract CQ028 of the East Side Access Project

    By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso

    INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p

    Jan 1, 2007

  • SME
    Evaluation of Pollution of Mining Areas in Aspect of their Future Use and Development

    By D. J. Pyra, J. Kudelko, Korzekwam W.

    Polkowice region (Lower Silesia, Poland) is an area, where the copper mining activity started about 40 years ago and new technologies were applied. There are 3 underground mines, 3 processing plants,

    Jan 1, 2005

  • SME
    Experiences with Undermining by Coal in South Africa

    By J. N. Van der Merwe

    The paper provides an overview of subsidence research which was done by the Sasol Company in South Africa over a period of more than six years. The magnitudes of subsidence elements in South Africa ar

    Jan 1, 1986

  • SME
    Program-Wide Geo-Instrumentation Monitoring for the MTA East Side Access Project

    By Dilip I. Patel, Jesus Schabib, W. Allen Mawr, Daniel A. Louis

    East Side Access (ESA) will extend Long Island Rail Road into midtown Manhattan via 11 km of tunnels, a new terminal station and associated rail support facilities. The hard-rock tunneling in Manhatta

    Jan 1, 2007

  • SME
    NAT 2018 Full Proceedings - NAT2018

    By Matthew Preedy, Brett Campbell, Jim Rush, Alan Howard, Derek Penrice

    All Rights Reserved. Printed in the United States of America. Information contained in this work has been obtained by SME, Inc. from sources believed to be reliable. However, neither SME nor its autho

    Dec 1, 2018

  • SME
    Breakthrough Outage at the Second Manapouri Tailrace Tunnel Project, New Zealand

    By Charlie Watts, Ken Smales, Ron Fleming

    The Manapouri Power Station is an underground hydro-electric station located in the South Island of New Zealand, and was constructed in the 1960s. Between 1997and 2002, a second 10m diameter tailrace

    Jan 1, 2007

  • SME
    Vocational and Technical Education in Geoscience With Emphasis on Geochemical Exploration Skills

    By James A. Madonna

    Several universities and colleges in Australia, Canada and the United States, recognized the need to establish or reorganize geoscience programs at the vocational and two-year technical levels. To acc

    Jan 1, 1994

  • SME
    NATM Design For Stanford Linac Coherent Light Source Tunnels

    By Jonathan Taylor, Irwan Halim, Frederick (Rick) Vincent

    The new underground facilities for the LINAC Coherent Light Source project at the Stanford Linear Accelerator Center in Menlo Park, CA, are constructed in very weak sedimentary rock interspersed with

    Jan 1, 2007

  • SME
    New York Subway Stations And Crossover Caverns—Update On Initial Support Design

    By Charles Stone, Hannes Lagger, Dru Desai

    The design methodology of the planned Second Avenue Subway Project (SAS) led to development of the initial support design to estimate cost and quantities in the Preliminary Engineering (PE) stage. Car

    Jan 1, 2007

  • SME
    New Test Methodology For Estimating The Abrasiveness Of Soils For TBM Tunneling

    By F. Dahl, P. Raleigh, J. Holzhauser, B. Nilsen

    Tunnel excavation using tunnel boring machines (TBMs), has become increasingly common in recent years, despite the fact that precise evaluation of certain risks have not kept pace with the use of thes

    Jan 1, 2007

  • SME
    Optimum Sublevel Height and Drift Spacing in Sublevel Cave Mining Based on Random Medium Theory Mining, Metallurgy and Exploration (6ee2c5d0-4d40-4945-8e70-9bbd8477aa28)

    By Fengyu Ren, Ruslan Puscasu, Kunpeng Yu, Gideon Chitombo, Liangliang Kang

    Weak rock mass and poor flow of material can cause excessive ore loss and dilution in sublevel caving. This paper proposes a method to establish design parameters for an inclined deposit within a weak

  • SME
    APPLICATION OF VIRTUAL REALITY IN THE MINING INDUSTRY – WHERE WE ARE NOW? - SME Annual Conference 2023

    By N. Akbulut, A. Anani

    From the initial planning phases to the closing of a mine, mining is an industry where high attention, care, and sensitivity are needed in every step of the mine life. Since mining projects have a lon

    Feb 1, 2023

  • SME
    Tellurium in modern and ancient black smoker systems

    By A. Yu. Lein, V. V. Maslennikov, S. P. Maslennikova, I. Y. u. Melekestseva, Yu. A. Bogdanov

    Tellurium is a high-tech and also toxic element. This element shows sufficient contents in Fe-Mn crusts and nodules in the modern ocean to be involved in future industrial processes [Hein et al., 2003

    Sep 1, 2014

  • SME
    Technology News – Atlas Copco Introduces Hydraulic Breaker

    The HB 2500 hydraulic breaker attachment from Atlas Copco Construction Tools features Krupp percussion technology and a service weight of 2,500 kg (5,512 lbs). This makes it ideal for demolition, tunn

    Jan 1, 2006

  • SME
    Tunneling for the Eastlink Project, Melbourne, Australia

    By Peter Campi, Harry R. Asche, Ian P. Callow, Edmund G. Taylor, P. Scott Smith

    The US$1,850 million EastLink project is a 39km tollway and includes twin 3-lane,1.5km long, undrained driven tunnels. The hard rock tunnels are being built to avoid passing the motorway through the M

    Jan 1, 2007

  • SME
    Design/Build of Tunnel and Shaft at Blue Ridge Dam LLO

    By Carl Johnson, D. R. Todd

    The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie

    Jan 1, 2005

  • SME
    Monitoring Successful NATM in Singapore

    By K. Zeidler, T. Schwind

    The Fort Canning Tunnel, Singapore, is an approximately 50 feet (15m) wide vehicular tunnel under shallow ground cover that has been constructed according to the principles of the NATM. Its shallow lo

    Jan 1, 2007

  • SME
    Guadarrama Tunnel Construction with Double Shield TBMs

    By F. Mendaña

    The characteristics of the igneous and metamorphic bedrock, extra-hard and abrasive, of the Guadarrama Tunnels, a bi-tube project of length 28.4 km without any intermediate attack, are first commented

    Jan 1, 2007