Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Characterization Of Carbon In Sediment-Hosted Disseminated Gold Deposits, North Central NevadaBy Albert Hofstra, Joel Leventhal
The gray, dark gray and black colors of the sediments and the presence of pyrite in the Carlin, Jerritt Canyon, Horse Canyon, Betze, and Gold Acres sediment-hosted disseminated gold (SHDG) deposits in
Jan 1, 1990
-
EVALUATION OF MINE VENTILATION IN LARGE-OPENING UNDERGROUND STONE MINES - SME Annual Conference 2023By V. Gangrade, J. Addis, S. Vanderslice
Researchers at the National Institute for Occupational Safety and Health (NIOSH) are conducting research to improve the ventilation of large-opening underground stone mines. The mine ventilation in th
Feb 1, 2023
-
Analysis Of The Performance Of Large Diameter Ball Mills At Bougainville Using The Population Balance Approach (5fe42bc4-6797-46a2-94f8-903b2155b7d3)By Y. C. Lo
This paper attempts to answer whether or not the mill performance at Bougainville could have, in fact, been predicted by the population balance approach, or whether other special considerations are re
Jan 1, 1987
-
Risk Assessment Applied To Water Supply And Dewatering At A New MineBy I. Cameron-Clarke
This paper describes the design of a wellfield to provide a water supply for a new mine in southern Africa. A hydrogeological investigation was conducted that included the drilling and test pumping of
Jan 1, 1992
-
Muller Mixing Of Bentonite And Iron Ore; Concentrate At CornwallBy R. L. Stone
By means of laboratory balling tests and a procedure for determining bentonite concentration in a green ball the present study revealed that the bentonite savings by mulling concentrate and bentonite
Jan 1, 1971
-
Mine-to-mill Improvements Anchored In Drilling Accuracy - SME Annual Conference 2023By A. Almeida, D. Castro, K. Ingmarsson, D. Ferreira, R. Tamir
Mine-to-mill improvements can be initiated at any stage, but it is our assertion that drilling accuracy is a practical anchor in any operating mine or quarry for a structured continuous improvement pr
Feb 1, 2023
-
Development of a Six Drillhead Roof Bolting MachineBy B. Kyslinger
"In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Foresight Energy, J. H. Fletcher & Company was tasked to design
Jan 1, 2017
-
Optimization Of A Flotation MillBy Ronald J. Roman
A mathematical model was developed for the grinding and flotation section of Union Carbide's Bishop mill and this model was used to indicate how variations in grind, retention time, and calcite a
Jan 1, 1969
-
The Production Potential Of AES-Type MachinesBy R. H. Ring
The Automatic Extraction System (AES) was designed and built under a U.S. Department of Energy Contract by the National Mine Service Company in cooperation with the Lee Engineering Division of Consoli
Jan 1, 1980
-
Coal Liquefaction: Present Status, Future PotentialBy Paul Wellman
The energy problem of the U. S; was emphasized by the oil embargo of late 1973 and early 1974 and it seemed for a time that the Federal Government, under pressure from the general public, might take s
Jan 1, 1977
-
Computer-Generated Main Fan Performance Curves For Various Operating ConditionsBy Jerry L. Fuller
Fan performance graphs are generated by digital computer using two programs, RUN- FANS and FANPLOT. RUNFANS calculates fan performance data from stored specific-volume, specific-speed data for a given
Jan 1, 1984
-
Process Development For Value-Added Products From Primary Kaolin Resources In MinnesotaBy M. S. Prasad
In earlier work it has been shown that paper filler clay products can be obtained from primary kaolin deposits of Minnesota. The objective of the current work was to reduce silica and iron contaminant
Jan 1, 1991
-
Aggregate Mining: A Process Of Shaping New Landscapes ? IntroductionBy Anthony M. Bauer
It is the nature of mining to reshape the landscape. Mining is an earth moving process with many of the same activities associated with the regrading of a site for a shopping center, drainage channel,
Jan 1, 1984
-
Design and Construction of the NBAQ4 Project— First Urban EPB TBM Tunnel in Metro Manila - RETC2023By Abegail Endraca, Allan Sebastian, Andrew Raine, Allan Patdu
The project involves the construction of a new aqueduct tunnel by an Earth Pressure Balance TBM tunnel for the Novaliches-Balara Aqueduct No 4 (NBAQ4) project in Metro Manila. It comprises a 7.3 km lo
Jun 13, 2023
-
Independent contractor fatalities in the mining industry: a look at contributing factorsBy E. A. Barrett, L. L. Rethi
Throughout all segments of the United States mining industry, 163 independent contractor employees were fatally injured between 1990 and 1997. Factors that contributed to these injuries were identifie
Jan 1, 2002
-
Oil Shale Mining TechnologyBy Gordon B. French
In order to better understand the relation- ship of underground and surface oil shale processing systems, a block flow chart is presented in Fig. I. From this figure only modified in-situ and Room a
Jan 1, 1981
-
Crossrail C310 Thames Tunnel—Mixshield TBM Tunneling in Alternating Ground Conditions With Low OverburdenBy Chris Ashton, Andreas Rädle, Taner Aydogmus
"The Contract C310 is part of the current biggest infrastructure project of Europe “Crossrail” which is a major new cross-London rail link project and comprises the construction of the North Woolwich
Jan 1, 2016
-
Tools For Coal Mine Reclamation - What Are The Practical Options? ? IntroductionBy W. A. Haley
As far back as 1939 state laws have required reclamation of mined lands. Reclamation has been the topic of many discussions and presentations, especially since the late 1960's. In the past ten ye
Jan 1, 1976
-
Some Geological Factors In Deep Well Disposal Site EvaluationBy Neilson Rudd
Many deep well waste disposal. operations have adopted the technology of the petroleum industry but fail to make full use of the knowledge and experience upon which this technology is based. Inexperie
Jan 1, 1971
-
Discharge Permitting And Environmental Assessment Issues Associated With Submarine Tailings Disposal For The Alaska-Juneau Mine ProjectBy P. McGrath
From the mid-1980s through 1997, Echo Bay Alaska evaluated reopening the historic Alaska-Juneau (AJ) gold mine. Their original proposed project underwent numerous modifications in order to minimize th
Jan 1, 1998