Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    The Use of Large Diameter Blastholes Underground at Meramec Mining Company

    By James C. Irvine

    Meramec Mining Company's Pea Ridge underground mine is presently involved in a large scale pillar recovery program and has made use of both rotary and down-the-hole drills for large diameter blasthole

    Jan 1, 1976

  • ISEE
    Utilization of Detonation Cord to Pre-split Pennsylvanian Aged Sandstone and Shale, Grundy, Virginia

    By Calvin Konya, Steven S. Spagna, Ed Smith

    During Summer 2001, the U.S Army Corps of Engineers awarded a contract to the construction firm of Bush and Burchett of Allen, Kentucky, for the purpose of developing a 13 acre redevelopment site by r

    Jan 1, 2005

  • ISEE
    Quake, Quarry, or Quack

    By Dominic C, Gregory B. Poole

    On December 12, 2018 at 4:14 AM EST, an earthquake registering a 4.4 magnitude on the Richter Scale occurred in central Tennessee. According to a survey posted on the USGS website, this earthquake was

    Feb 1, 2020

  • ISEE
    Mine optimization using Total smart mining solution

    By Chanhwi Shin, Hyeongmin Kang

    Mine optimization is a key strategy in the mining industry that focuses on improving the efficiency, productivity, and sustainability of mining operations. To achieve mine optimization, digitalization

    Jan 21, 2025

  • ISEE
    Coyote Blasting - An Overview

    By S. S. Jenkins Jr.

    While the method is seldom used anymore, coyote blasting is an historically interesting way to blast large quantities of rock. It was used extensively in the days before modern fast drills were availa

    Jan 1, 2005

  • ISEE
    Charge Geometry Effects on Pressure Waveforms in a Shock Tube

    By Joshua Hoffman, Braden Lusk, Kyle Perry

    Shock tubes are used to simulate large-scale arena explosions without the use of full-scale arena sites that utilize large quantities of explosives. Instead, small explosive charges can be used to dri

    Jan 1, 2010

  • ISEE
    The History and Development of Permissible Explosives for Underground Coal Mining (c0bdb26c-921d-4fa8-97b7-a8bd2dbb04d2)

    By Robert B. Hopler

    The hazards which naturally prevail in underground coal mines, always severe and unpredictable due to the loosely-consolidated strata in which coal is frequently found, are increased by the commonly-o

    Jan 1, 1996

  • ISEE
    Modular Ballistic Pendulum for Measurement of Impulse from Tamped Explosives

    By Roland Alford

    The ballistic pendulum is a well-established piece of test equipment originally developed for estimating the velocity of bullets and projectiles. When trying to understand the effects of different tam

    Feb 6, 2023

  • ISEE
    GEM (Geologic Element Motion) Blast Heave Modeling with More Element Shapes and Energy Partitioning

    By Stewart A. Silling, C. Mick Lownds, Dale S. Preece, Ali Bhuiyan

    GEM (Geologic Element Motion) is a Distinct Element Method (DEM) for modeling blast-induced heave. It was developed with a very fast computational algorithm that efficiently treats many different elem

    Feb 6, 2023

  • ISEE
    Proactive Controls for Highwall Stability

    By Trevor Ames

    Highwall instability, and sometimes referred to as ground failures, historically are a consistent contributor of mine injuries and fatalities within surface mines. To combat this several efforts, incl

    Jan 1, 2015

  • ISEE
    Optimization of Up Raises from Blind-Hole to Multiple Blasting Events Methodology

    By S. Gajardo, E. Valdés Guerra

    Together with Sociedad Punta del Cobre S.A. (Pucobre) and Orica, we are carrying out a study of alternatives for methodology of excavation in Slot Up Raises from actually built with Blind Hole (BH) to

    Jan 1, 2024

  • ISEE
    Controlling Backbreak with Proper Borehole Timing

    By Calvin J. Konya

    Backbreak behind the last row of boreholes can be a significant problem for blasting operations. Backbreak will interfere with the proper drilling and execution of the subsequent shot and can produce

    Jan 1, 1987

  • ISEE
    Rebuild of a Flash Smelting Furnace Using Explosives

    By Scott G. Giltner, Terry Millar, Ben Bringhurst

    "Kennecott Utah Copper (KUC) Smelter scheduled a rebuild of their flash smelting furnace forSeptember, 2014. KUC’s goal in this project was to reduce the rebuild time from 65 to 55 days by using explo

    Jan 1, 2016

  • ISEE
    Blasting Specifications and Guidelines for Protective and High-Profile Blasting

    By Brian Lewis, Reinhold Daykin Schnell

    Blasting specifications and guidelines are very important aspects of detailed project specifications covering any scope of work (SOW) that involves explosives and blasting procedures. A lot of larger

    Feb 6, 2023

  • ISEE
    Design of a Personnel Blast Shield for Different Explosives Applications

    By Eduardo Lozano, Vilem Petr

    The use of explosives brings countless benefits to our everyday lives in areas such as mining, oil and gas exploration, demolition, and avalanche control. However, because of the potential destructive

    Jan 1, 2017

  • ISEE
    Journal: Kaiser Plant Demolition / Smokestack Demolition at port of Tacoma, Washington

    By Walt Meglasson

    The Kaiser Aluminum Company Smelter, one of several in the Pacific Northwest, was built in 1942 and operated by the Olin Company during World War II and then purchased by Kaiser Aluminum after the war

    Jan 1, 2008

  • ISEE
    Measurement of the In-Hole Density of Gassed Explosives at Peruvian Mines

    By Juan Carlos Vasquez, Romel Villanueva

    We present the results of our field research on the variation of the density of the gassed explosives and their influence on the blasting results in the Peruvian mines: Yanacocha, Toquepala and Antami

    Feb 1, 2020

  • ISEE
    Optimal Delay Periods and Complex Timing Sequences Using Electronic Delay Detonators

    By Y. Idrogo

    Electronic delay detonators have been used in most types of blasting application with great success, with the accuracy and precision being used effectively to control negative environmental impacts li

    Jan 1, 2018

  • ISEE
    Blasting Accidents in Mining

    By Michael A. Peltier, Dennis V. D'Andreal, Larry R. Fletcher

    Accident data obtained from the Mine Safety and Health Administration (MSHA) were analyzed by the Bureau of Mines to determine the most frequent causes of blasting accidents in U.S. mining and to exam

    Jan 1, 1987

  • ISEE
    Wall Control at the Freeport Grasberg Opencut Mine: Vibration and Gas Penetration Measurements as a Precursor to Improvements

    By A. Spathis, I. Yacob, A. Labriola, G. Smith

    Wall control is a significant issue for many mines. Improvements to the design process for blasts adjacent to temporary or final walls will require better measurement tools and predictive models. Oric

    Jan 1, 2001