Value-Engineering of H-Pile Foundations in Karstic GeologyBy Rachael M. Fischer, Daniel J. Woeste, Terence P. Holman
"A new 50 MW biomass renewable energy power plant was planned for construction in southwestern Georgia. The original foundation design consisted of very conservatively designed H-pile groups with vert
Jan 1, 2016
-
Application Of Pile Test Data For The Foundation Design Of Rail Viaduct At Carrum, VictoriaBy Nick M. Withers, Suthagarann Visvalingam, Cillian Mc Colgan
The level crossings removal project in Victoria is removing 75 level crossings across Melbourne to improve safety by separating trains from traffic, with other benefits such as reduced congestion, an
Nov 1, 2022
-
The Galataport Project In Istanbul, Turkey. A Unique Case History In Geotechnical EngineeringBy Carlandrea Albonico, Salvatore Miranda
After a brief introduction of the whole Project, the paper describes two special geotechnical engineering solutions provided within the scope of the Galataport Project, in Istanbul, Turkey. The first
Nov 1, 2022
-
Deep Foundation Advancements in FargoBy Ezra Ballinger, Matthew R. Glisson
Located in downtown Fargo, North Dakota, the Block 9 Redevelopment project site contains highly- compressible soils in the upper 100 feet with groundwater about 10 to 15 feet below the existing ground
Jan 1, 2019
-
USTA Geoseismic and Foundation Design ChallengesBy Athena C. Denivo, Pablo V. Lopez, Sissy Nikolaou, Alfred H. Brand, Ahmad Rahimian, Rudivien G. Josef
"The United States Tennis Association (USTA) Billie Jean King National Tennis Center (BJKNTC) site is located in the northeastern portion of the Flushing Meadows Corona Park area of Queens, N.Y. The s
Jan 1, 2015
-
A Three-Stage Assessment Process To Predict Risk Levels Due To Subsurface ConstructionBy Julie Clarke
In 1939 Dr. Ralph Peck criticized the Civil Engineering community for taking a bifurcated approach to the prediction of building damage due to subsurface geo-technical works. Specifically, he observe
Jan 1, 2009
-
Marine Foundations Of Bridges In The Northeastern USA (dd1131f4-385d-4efe-8191-edcc7983fec3)By James S. Graham
Marine design and construction methods are presented on the caisson foundations for the tower piers at the Brooklyn, Ben Franklin, Delaware Memorial 1st, Tappan Zee, Walt Whitman, Throgs Neck, Verraza
Jan 1, 2013
-
Granular Pile For Ground Improvement ? SynopsisBy G. Ranjan
The designers and the practicing engineers have started using latest and cost effective techniques of ground improvements which utilise the weak and poor sub-soil deposits efficiently for the civil en
Jan 1, 2010
-
Utilizing Real-Time Data and Statistical Analysis for Wet Soil Mixing: A Case HistoryBy Sunil Arora, Lisheng Shao, Chris Conkle
"The East Garden Grove - Wintersburg Channel located in Orange County, California, required upgrades along the levees to mitigate potential liquefaction and lateral spreading hazards. The Orange Count
Jan 1, 2015
-
Transformation From Classical 2D To Digital 3D Thinking Process In The Design Of Geotechnical Structures: Perspective Of A Geotechnical ConsultantBy Harald Vogel, Johannes Lachenski, Friedemann Koetzel, Sebastian Schnell
In this paper, a digital subsoil approach, a work-in-progress, will be presented describing the transformation from a classical 2D to digital 3D thinking process in the design of geotechnical structur
May 1, 2022
-
Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design ParametersBy Martin D. Larisch
The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.
Nov 1, 2022
-
Ground Improvement for Reclaimed LandfillsBy Steven E. Darnell, William W. Haasz, Brandon T. Buschmeier, Frederic Masse
"Landfills often cover expansive areas in locations where large building facilities or infrastructure is in high in demand after the land has been reclaimed. Most landfills have soil or fill propertie
Jan 1, 2017
-
A Resilience Approach for Design of Earth Retaining Systems with Application on MSE WallsBy George Gazetas, Sissy Nikolaou, Fani Gelagoti, Irene Georgiou, Rallis Kourkoulis
"The need to shift geotechnical design from a “factor of safety” to a “performance based” design (PBD) approach has increased rapidly in the past years following examples from structural engineering.
Jan 1, 2016
-
Eglinton Crosstown - Over and Under the Existing SubwayBy Shawna Munn, Sarah Speir
Cedarvale Station is one of 25 new Eglinton Crosstown light rail transit (ECLRT) stations along Eglinton Avenue in Toronto. It is an interchange station with the existing Toronto Transit Com- mission
Jan 1, 2023
-
A Soil Quake Davisson Offset Method For Drilled FoundationsBy Michael Perlow Jr
A modification of the original Davisson Offset Limit (DOL) is presented for drilled foundations using soil quake (QDOL) factors ranging from 2 to 6. A further modification of the Davisson Offset Limit
-
Sloping Rubble Marine Seawalls Founded on Soft Soil Improved by Stone ColumnsBy Eleonora Di Mario, Colin B. Turnbull, Matthew G. Mills, Chengbin Miao, Wilhelm S. Degen
"In the past decade, the ‘zero-dredge’ philosophy has become the preferred option for the formation of marine seawalls and reclamations, compared to the partially or fully dredged options, as this sol
Jan 1, 2017
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KYBy Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Load Distribution for Underpinning System Using Inherent Rigidity of Concrete DamBy Rick Deschamps, Amanda Blank, Matthew W. Drewek, Michael P. Walker
The Prairie du Sac Dam, located on the Wisconsin River, northwest of Madison, Wisconsin, was constructed 1912-1914. The spillway is an Ambursen-type, consisting of a series timber pile supported pier
Sep 8, 2021
-
Jet Grouting for Strength in Marine Sediments with HydrocarbonsBy Paul M. Schuman, Alessandro Bertero, Giuliana A. Zelada, Sharon G. Cranston
Many jet grouted columns were recently installed to create a jet grout-treated soil foundation for an earthen embankment used in a large shoreline stabilization project in the Mystic River in Charlest
Jan 1, 2019
-
Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-WallsBy Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city
Sep 8, 2021