Structure Monitoring During UnderpinningBy Barry C. Roth
A Real Time Automated Remote Reading Electrolytic Tilt Monitoring System was effectively deployed for monitoring an existing five story brick building during underpinning, shoring and excavation opera
Jan 1, 2007
-
On The Ultimate Capacity And Radial Stress Distribution Of Driven Piles In SandsBy E. Ulrich Klotz
It is difficult to predict accurately the capacity of driven piles in sand. In practice, this uncertainty either leads to conservative designs if the capacity is under-predicted, or worse, if the cap
Jan 1, 2002
-
Design Of Bored Piles In Chalk At The New Medway Crossing Based On Instrumented Load TestsBy David J. Puller
As part of the value engineering process on a major Design Build highway project, instrumented trial pile load tests were used to achieve savings in cost and time on the foundations for a major river
Jan 1, 2002
-
Pile Construction And Related Problems ? SynopsisBy K. Fujita
In order to deal properly with the fundamental aspects of pile construction, the following problems and their solutions are introduced: For driven piles - stresses, damage, movements of surroundings,
Jan 1, 2010
-
Dynamic Characterization Of Drilled Shafts On Doremus Avenue BridgeBy Martina Balic
Dynamic properties of the drilled shaft foundations supporting Doremus Avenue Bridge were determined by forced vibration testing. The main objectives of the substructure testing at Doremus Avenue Brid
Jan 1, 2004
-
Pile Foundations For Algiers New Airport TerminalBy Ramdane Bahar
The new Algiers airport building is a reinforced concrete building of more than 80 thousand square meters of floor slabs. It is located at Dar-EI-Beida, near the old passenger terminal, about 20 km ea
Jan 1, 2002
-
Remedial Work On Large Pile Deviation In The Very Thick Marine Swamp Clay DepositBy Wanchai Teparaksa
Pile deviation generally can happen after installation of driven pile particularly in soft soil layers. In this case study, all 242 diameter 0.8 m spun piles were deviated from 20 to 820 mm. The large
Jan 1, 2002
-
Numerical Analysis Of The Osterberg Cell Loading TestBy Brunella Recinto
Pile loading tests are carried out with two main objectives: 1) evaluating the ultimate resistance; 2) checking the behaviour of the pile under live load. In the first case and particularly for large
Jan 1, 2003
-
Parametric Analysis Of Piled Rafts Founded On A Tropical Clay Of BrazilBy Renato P. Cunha
The paper presents the results of a comparative and parametric analysis in which a numerical program developed exclusively for groups of deep foundations under general loading (vertical, horizontal an
Jan 1, 2002
-
The Quality Control Of Deep Foundation ? The New Approach By Non-Destructive Techniques ? SynopsisBy K. S. Ho
With the aid of the advanced electronic devices and micro-processors, the quality control of deep foundations can be carried out by Non-Destructive Tests (NDT). Three methods are presented here: the S
Jan 1, 2010
-
Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic EnvironmentBy Thomas M. Caruso
Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,
Jan 1, 2008
-
Suwanee American Cement Plant, Branford, Florida: A Case Study Of Large Diameter Continuous Flight Auger Design Build FoundationsBy Gordon King
This paper presents a case study of large diameter continuous flight auger (CFA) piles and drilled shafts utilized for foundation support of a series of heavily loaded cement plant structures at the S
Jan 1, 2003
-
The First Cut-Off Wall In The Indian Himalayas For The Dam Of The Dhauliganga Hydroelectric ProjectBy Wolfgang G. Brunner
In the far north of Uttar Pradesh Province in the Indian Himalayas, the 280 MW Dhauliganga hydroelectric power plant is under construction by National Hydroelectric Power Corporation (NHPC), a state-
Jan 1, 2004
-
The Cosmopolitan Resort & Casino, Las Vegas, NV Specialty Foundation Work Under Extreme ConditionsBy Lawrence Piccagli
This past spring of 2006, BENCOR installed the concrete reinforced diaphragm walls for the COSMOPOLITAN RESORT & CASINO in Las Vegas, Nevada. The project highlights include the excavation of approx. 3
Jan 1, 2007
-
Rock Socket Friction In Drilled Shafts - Its Greater Than You Think - Summary.By Jorj O. Osterberg
The practice of using side shear resistance in the design of drilled shafts socketed in rock is discussed. In the absence of field test data for the particular rock involved, the designer often neglec
Jan 1, 1991
-
Modeling Of MSE Wall - Drilled Shaft SystemsBy Matthew C. Pierson
Due to space limitations for transportation projects, many times sound walls must be constructed above mechanically stabilized earth (MSE) walls. These sound walls must resist lateral loads from wind
Jan 1, 2009
-
Large Diameter Steel Tubular Piles For Optimum Seismic PerformanceBy Ben C. Gerwick
Large diameter steel tubular piles installed vertically or on a slight rake, offer many advantages as the foundations of major overwater bridge in regions of high seismicity. By proper selection of di
Jan 1, 2013
-
Performance-Based Reliability Design for Deep Foundations Using Monte Carlo Statistical Methods (aa702b6b-e181-4fa5-97b3-2e3a1ab7040e)By Haijian Fan
Currently, deep foundation designs for the service limit state are deterministic in nature. The settlements and lateral deflections of deep foundations are calculated by means of numerical techniques
Jan 1, 2017
-
Session 13 "Jet Grouting III"By Peter Iovino
Unfortunately, I don't know the unit cost per cubic yard of treatment. I reflected on that yesterday and I don't think that we considered the use of micropiles. They could have been an optio
Feb 10, 2003
-
“Digital Specialist Foundations”- Using The Digital Twin During Project ExecutionBy Marcus Daubner
This paper explains how BAUER Spezialtiefbau GmbH uses digital methods on projects - starting from work preparation to completion of works. More precisely, the advantages of BIM-based planning during
Sep 1, 2022