    Bluestone Dam Safety Assurance Program: An OPA Runner Up

    By Jeff Hopple

    "Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en

    Jan 1, 2014

  • DFI
    Micropiles for Seismic Retrofits

    By Rob Jameson

    "Although seismic retrofit is recognized as a key micropile application, widely-used reference documents do not clearly address design and testing recommendations for micropiles that are loaded primar

    Jan 1, 2009

  • DFI
    Helical Pile Foundations at Tangier Island Substation

    By Jeff Wilkinson, Brandon Walter

    "A&N Electrical Cooperative provides electrical service to the counties of Accomack and Northampton along Virginia’s Eastern Shore and to Smith Island in Somerset County, Md.A&N recently worked to imp

    Jan 1, 2017

  • DFI
    Underwater Concrete In Drilled Shafts: The Key Issues And Case Histories

    By Sam X. Yao

    In construction of drilled shafts under water, placing concrete in the shafts is technically demanding and involves complex construction logistics. Past construction experience has demonstrated that h

    Jan 1, 2013

  • DFI
    Pindersfield Hospital ? An Innovative Piled Scheme

    By James N. Mure

    The paper describes the design development and construction of bored piles at Pindersfield Hospital, Wakefield, U.K. The piles were of monopile type. Monopile is the term used to describe piles which

    Jan 1, 2008

  • DFI
    Foundation Construction Challenges At 100 11th Avenue In Manhattan - Osterberg Cell Load Test In Mica Schist

    By Cem Altuntas

    This paper is the second in a series of two describing the design and construction of a foundation for a major high-rise real estate development on the west side of Manhattan, N.Y. The foundation memb

    Jan 1, 2008

  • DFI
    New Technique To Drive Piles By Impact Hammer Inside The Pile - Synopsis

    By Djk Arentsen

    A new technique to drive tubular piles by impact hammer inside the pile has confirmed a dramatic reduction of noise and the opportunity to save steel. Also a reduction in driving time and a higher bea

    Jan 1, 1996

  • DFI
    Micropile Performance Variability: A Fundamental Case Study

    By Walter E. Vanderpool

    Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.

    Jan 1, 2002

  • DFI
    Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - Synopsis

    By S. R. Nandargikar

    Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.

    Jan 1, 1996

  • DFI
    North American Geotechnical Exploration Practice ? Synopsis

    By C. O. Riggs

    Geotechnical exploration in North America, in particular, exploration for deep foundations analyses, is currently and generally performed following the most basic sampling and insitu testing methods a

    Jan 1, 2010

  • DFI
    Soil Improvement Using Gravel-Sand Columns for a Highway Project in Germany

    By Schmitz Stefan, Stephan Jee-Sun

    "Due to the reunion of Western and Eastern Germany in the late 80’s, a multitude of infrastructure projects had to be executed. A good portion of these projects required improvement of the motorway sy

    Jan 1, 2015

  • DFI
    Route 9A Pedestrian Tunnel at the World Trade Center

    By Raymond E. Sandiford

    "The redevelopment of the World Trade Center (WTC) provided an opportunity for the Port Authority of NY and NJ to complete a long sought underground connection between all of Lower Manhattan’s transit

    Jan 1, 2012

  • DFI
    Performance Specifications For Drilled Piles

    By Dan Brown

    Deep foundation contracting for transportation projects in the United States has typically followed the design-bid-build model in which contractors bid on a specific work product according to relative

    Jan 1, 2006

  • DFI
    DYNA Force-An Elasto-Magnetic Sensor For Force Measuring Of Post Tensioning Ground Anchors

    By Lucian Bogdan

    On many occasions during construction and service life of the structure, it is crucial to know the load in post tensioning tendons and anchors. Although there are many methods to measure the tendon fo

    Jan 1, 2009

  • DFI
    Time-Dependent Increase Of The Bearing Capacity Of Displacement Piles

    By Florian König

    It is well known that the bearing capacity and stiffness of displacement piles may increase significantly with time, a phenomenon usually referred to as set-up. In cohesive soils the set-up is commonl

    Jan 1, 2006

  • DFI
    Earth Pressure Acting On Single Driven Piles In Sand

    By Adel Hanna

    Earth pressure acting on piles driven in sand is playing a major role in estimating pile capacity. In literature, researchers entertained simplifying assumptions in estimating the earth pressure actin

    Jan 1, 2003

  • DFI
    Arctic Emergency Operation: Deception Bay Rehabilitation

    By Jeff Starchuck, Harald Kullmann

    "In 2005, an inspection showed that the Deception Bay Wharf in the Canadian Arctic was at the end of its service life. Although Deception Bay is closed with landfast ice up to 5 ft thick, shipping ope

    Jan 1, 2009

  • DFI
    RC Harris Water Filtration Plant Expansion Excavation Support Design, Installation And Performance

    By Matthew Janes

    The RC Harris Filtration Plant, which treats the majority of the fresh water for over 2.5 million Torontonians, is a Canadian Architectural Heritage site demonstrating a classic example of Art Deco A

    Jan 1, 2006

  • DFI
    Drilled Pier Foundation In Hard Carbonate Rock ? Synopsis

    By K. E. Darnell

    Drilled pier foundations have long been a favored foundation type for heavily loaded structures. Drilled piers derive their load-bearing capacity from end-bearing, and/or sidewall friction. This type

    Jan 1, 2010

  • DFI
    Hollow Core Bar Micropiles - Design Parameters Interpreted From 260 Load Tests

    By Jesús E. Gómez

    A recent bridge underpinning project provided a unique opportunity to obtain information on the load-deflection response of 260 hollow-core bar micropiles. All production micropiles were proof-tested