Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Justification of Process Control Systems in Mineral and Coal Processing ApplicationsBy R. F. Hochstein, A. J. Neale, B. C. Flintoff
"Process control technology holds very significant potential benefits for many mineral and coal processing plants. The impact can be expected in terms of performance improvements (e.g. increased throu
Jan 1, 1990
-
Red Dog Lead Regrind Circuit OptimizationBy Brigitte Lacouture, Yeen Shien Hwang, David Lin
"A baseline survey of the partially open lead regrind circuit at Red Dog Mine indicated poor regrind efficiencies for the three parallel 450 HP tower mills. Driven by the high energy cost and the pote
Jan 1, 2005
-
Constructing, Commissioning and Operating a Mine at High Altitude - The Collahuasi ExperienceBy Colin Lindsay
"The Collahuasi copper mine, located at an altitude of 4300 meters above sea level in northern Chile, commenced operations late in 1998. The mine is currently the 4‘h largest copper producer in the wo
Jan 1, 2001
-
New Mill Design for Large Grinding MillsBy Kjell Winther
"Hydralift Scanmec introduced early in the eighties a new and different mill design for very large grinding mills. The design described has actually no size limitation upwards and is so far suggested
Jan 1, 1995
-
Mocca: A Grinding Circuit Control ApplicationBy C. Larsen, D. Fragomeni, A. Vien, D. G. Fisher
"MOCCA is a Multivariable Optimal Constrained Control Algorithm developed specifically for non-square industrial control applications with practical difficulties such as interactions, time delays, con
Jan 1, 1991
-
Melt Extraction of Gold Fibers and Precious Metal Doped Fibers and Preparation of Porous Gold Fiber StructuresBy Olaf Andersen
Crucible melt extraction yields short metal fibers with eqivalent diameters as low as 50 µm from almost arbitrary metals and alloys. Highly porous components can be made from such fibers by suitable d
Oct 1, 2003
-
Improvement of Mass and Value Balance data from the Statistical Benchmark ModelBy Cecilia Arrue, Dominic Fragomeni, N. O. Lotter
"A statistically designed benchmark mill survey was carried out in July 2005 at the Kidd Creek Concentrator, D Division circuit, which processes Ni/Cu ore from the Montcalm deposit. A structured stati
Jan 1, 2007
-
The New Britiannia Project a TVX Gold Inc. /High Rlver Gold Mines Ltd. Joint VentureBy Roy Lindsay, Paul O'Hara, Gary Halverson
"The New Britannia Minesite is located in Snow Lake, Manitoba, 420 miles north of Winnipeg (figure 1). The mine previously operated from 1949 to 1958 extracting some 5.39 million tons of ore at a 0.15
Jan 1, 1996
-
High-pressure direct injection of natural gas in a diesel engine for high performance/low emissions (ace69f9b-8abb-4cd4-9306-9db2c42ce4ca)By K. B. Hodgins, P. Ouellette
"The North American mining industry faces challenging emissions regulations in the coming years with the introduction of new standards for off-road diesel engines. In order to remain competitive, indu
Jan 1, 2005
-
Nanoparticle Flotation Collectors for Pentlandite (b0296758-fb13-46f0-8d38-39e30070d6bb)By R. Pelton, Z. Dai, S. Yang
ABSTRACT Hydrophobic polystyrene nanoparticles were evaluated as potential flotation collectors for pentlandite. The flotation of hydrophilic glass beads demonstrated the nanoparticles’ ability to ind
Jan 1, 2014
-
Water Management in Hydraulic Fill OperationsBy M. Helinski
In the authors? experience inappropriate water management in hydraulic fill masses has been the root cause of most barricade failures. Inappropriate water management can lead to high water pressures,
May 1, 2007
-
Enhancing Cobalt Recovery from Copper/Nickel Matte Producing SmeltersBy V. I. Lakshmanan
Process Research ORTECH Inc. (PRO), with its in-depth knowledge on cobalt behaviour in nickel matte smelters and its novel mixed chloride hydrometallurgical processing, is developing a hybrid process
Jan 1, 2019
-
Failure Mechanisms of Pillars Under Shear LoadingBy Joseph J. Mgumbwa
Pillars are any structures left between two or more underground openings. The stability of pillars is normally considered to depend on shape (defined by width to height ratio), rock mass strength, ext
Oct 1, 2010
-
A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams MineBy David Evans, David Barnes, Robert Raponi
"The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind
Jan 1, 1997
-
A Method to Assess Size Reduction by GrindingBy Daniel Hodouin, Claude Bazin
"A graphical method to assess the size reduction by grinding is presented and illustrated with data collected from laboratory grinding tests and industrial grinding circuits. The method lies between t
Jan 1, 2004
-
The Use of Diagnostic Testwork and CIP/CIL Modeling to Improve the Metallurgical Performance at Two IAMGOLD Operations"A simple approach to optimizing the performance of an operating carbon in pulp (CIP) or carbon in leach (CIL) plant is presented. It is possible to reproduce the performance of an operating CIP or CI
Jan 1, 2011
-
Development of a Vat Leach Process to Extract Gold from the Cochrane Hill Mine, Nova Scotia of Northumberland Mines LimitedBy P. D. R. Maltby
"With the narrow vein structure of Nova Scotia gold deposits, selective mining is rarely possible and mill heads will be too low (below 0.10 oz per ton of gold) to support a conventional mill of up to
Jan 1, 1984
-
The Role of Applied Biotechnology in Decommissioning Mining OperationsBy Margarete Kalin
"Biotechnological approaches to decommissioning of mine waste management areas are presented in the context of sustainable environmental management. Improved design of waste sites and environmental ma
Jan 1, 1998
-
Slag loss control with Bessemer mattesBy P. Toscano
The objective of this investigation was to determine how the losses of nickel, copper and cobalt in fayalite slags could be controlled for nickel mattes with iron contents below 5 wt%. Laboratory-conv
Jan 1, 2004
-
Slag loss control with Bessemer mattes (7a7d6df1-1191-4a91-90b7-94a6293af197)By P. Toscano, T. A. Utigard
"The objective of this investigation was to determine how the losses of nickel, copper and cobalt in fayalite slags could be controlled for nickel mattes with iron contents below 5 wt%. Laboratory-con
Jan 1, 2004