Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Geology and Exploration History of the Amalgamated Kirkland Deposit, Kirkland Lake, OntarioBy Mark W. Masson, David B. Stevenson, David W. Broughton, Douglas R. Cruji, Steven E. Parry
"Abstract-The Amalgamated Kirkland gold deposit is located at Kirkland Lake, Ontario, within the Archean Abitibi Greenstone belt of the Canadian Shield. It lies on a fault or "break", termed the Cypru
Jan 1, 1995
-
Geology and Exploration History of the Amalgamated Kirkland Deposit, Kirkland Lake, Ontario (0ce750d4-e676-40c0-a003-974cb6f8cb76)By Mark W. Masson, David B. Stevenson, David W. Broughton, Douglas R. Cruji, Steven E. Parry
"The Amalgamated Kirkland gold deposit is located at Kirkland Lake, Ontario, within the Archean Abitibi Greenstone belt of the Canadian Shield. It lies on a fault or “break”, termed the Cyprus Break,
Jan 1, 1995
-
Gibraltar Mine SAG Mill Expansion Grinding Ciruit Design (5e5517e1-bab6-43d2-8866-c7d882036c0e)By R. J. Rotzinger, K. W. Major
The Gibraltar Mine and Mill facility were commissioned in 1972 by Gibraltar Mines Ltd utilizing a flowsheet consisting of two stages of crushing followed by a rod mill / ball mill grinding circuit. Du
Jan 1, 2012
-
Electric Furnace Smelting of Tin Concentrate from Sullivan OreBy E. L. Jones
THE concentration of tin in the tailing from Sullivan ore has been de-scribed by H. R. Banks, superintendent of the Sullivan concentrator, in a paper presented at the annual meeting of the B.C. Divisi
Jan 1, 1944
-
Fill Back Stability in Open Stope Mining with Consolidated BackfillBy Jerry Ran
When multiple levels are mined in open stope mining with delayed backfill, mining underneath fill is inevitable to achieve higher rate of recovery if no sill pillars are left for the purpose of fill s
May 1, 2003
-
Solidification Mechanisms of Melt Conditioned Direct-Chill (MC-DC) CastingBy Jayesh B. Patel, Zhongyun Fan, Hu-Tian Li
"Melt conditioned direct-chill (MC-DC) casting is a novel technology which combines vertical direct-chill (DC) casting with a high shear device directly immersed in the sump for in situ microstructura
Jan 1, 2018
-
Pressure filtration of copper concentrate at Mines Northgate Patino Inc.By G. Ladouceur
"Northgate Patino Mines produces a copper concentrate assaying 22% Cu. Moisture content of the product averages 12.5% H20 when dewatering with conventional vacuum disk filters. Recent smelter contract
Jan 1, 1987
-
Intensification of Chemical and Electrochemical Leaching of Refractory Gold OresBy V. G. Minenko, A. L. Samusev
For efficient leaching of gold from sulfide ores and the oxidation of sulfides into sulfates, it is necessary to introduce a substantial amount of oxidant - atomic oxygen, hydrogen peroxide, ozone, po
Jan 1, 2016
-
The effect of the variogram estimation on pit-limit designBy E. Yalçin, A. Ünal
In transitional mineralization, the sill of the underlying variogram is relatively easily estimated, but the estimation of the nugget effect may be more difficult. This study aims to determine for mas
Jan 1, 1992
-
Solvent Extraction Mixers as Chemical ReactorsThe mixer that is commonly encountered in hydro metallurgical operations consists of a single turbine and tank combination. However, it would be advantageous to examine some common solvent extraction
Jan 1, 1979
-
The SALA Caravan Mill-synopsisBy G. Kollberg
"IntroductionThe SALA Caravan Mill system represents a proven concept for the design and operation of mobile and semi-mobile ore dressing plants.The Caravan Mill has been developed to meet the demand
Jan 1, 1982
-
Coping with wall failuresBy F. J. Munn
"Since 1976, Cardinal River Coal s Ltd. has completed mining in eight pits. In each of these pits, at least one wall has failed, none by design, although not totally unexpected, yet there was no loss
Jan 1, 1985
-
Manufacturing of Incoloy800 Superalloy Strands in Continuous Casting Process with Electromagnetic StirringBy Rui Wang, Engang Wang, En Jiang, Anyuan Deng, Xingwu Zhang, Fei Wang
In this paper, the rectangular strands of Incoloy 800 superalloy were fabricated with a pilot vertical continuous caster in Northeastern University, China. In the processing, an electromagnetic stirri
Jan 1, 2014
-
Extender and filler mineral markets in the western United States and CanadaBy Todd S. Harris
"IntroductionThe western region of North America has long been considered a dynamic market supporting such diversified industries as lumber, agriculture, cement, and electronics. In recent years howev
Jan 1, 1986
-
Mining problems at La Mine BousquetBy Bennett McLaughlin, Gille Brousseau, John F. Cook
"La Mine Bousquet commenced operations in October 1979. Mining has been by underground methods from two main zones which dip steeply to the south , Sub-level stoping methods with following fill are us
Jan 1, 1985
-
Undergronnd ore handling and hoisting system at the Williams MineBy Henry Smith, Stu Brown
"The Williams Mine is Canada's largest gold producer, with annual production of some 500 000 ounces of gold from two million tonnes of ore. Highly mechanized and automated underground mining prac
Jan 1, 1991
-
Computer-aided mine design and planning for underground minesBy Chaluvadi K. Sridhar, Prashanta K. Chatterjee
"IntroductionThe planning of an underground coal mine requires a complex blend of technical expertise, experience and subjective design criteria implemented by the mining engineer. Currently the proce
Jan 1, 1986
-
A study on kriging small blocksBy Margaret Armstrong, Normand Champigny
"In order to define the ore/waste boundaries as finely as possible, mine planners often insist on kriging very small blocks (relative to the spacing of the available sample grades). These kriged estim
Jan 1, 1989
-
Sensitivity Study of the Induction Hardening ProcessBy S. Sundararajan, J. Brousseau, P. Bocher, M. Galopin, N. Barka
This research is committed to the prediction of the hardness profile produced by induction heating, using a computer-modeling software. The paper presents the simulation of the induction hardening pro
Jan 1, 2006
-
East Boulder Mine - A River Runs Through ItBy Ken J. Brouwer
Stillwater Mining Company commenced construction and development of the East Boulder underground mine in 1998. This new PGM mine is situated adjacent to the East Boulder River approximately 35 miles s
May 1, 2002