Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Geostatistical resource estimation for the Poura narrow-vein gold deposit

    A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is nov

    Feb 1, 2004

  • CIM
    The Operating Range Method for Backfill Hydraulics

    By D. J. Hallbom

    This paper presents a novel methodology for the hydraulic design of mine backfill distribution systems. The ?operating range? method uses the concepts of the hydraulic grade line and equivalent pipe l

    May 1, 2007

  • CIM
    Mine ventilation fan specification and evaluation

    By J. S. Stachulak, K. A. Mackinnon

    This paper deals with specifying and evaluating fans for mine ventilation projects. Topics such as fan and equipment design life, operating points, and operating conditions are discussed. Common opera

    Jan 1, 2004

  • CIM
    Huckleberry Mines Ltd. Process Design and Project Startup

    By Greg Rasmussen

    "Huckleberry Mines Ltd is an open pit porphyry copper-molybdenum mining operation located 120 km south of Houston, British Columbia with a 18,000 tpd milling facility. Huckleberry Mines is owned 60% b

    Jan 1, 1998

  • CIM
    A Plant-Wide Control System for Flotation Level Control

    By D. G. Hulbert, J. H. Schubert, R. G. D. Henning

    "Froth depth, along with reagent addition and aeration rate, is one of the crucial factors that can be used to control a flotation circuit. Sub-optimal setpoints and disruptions in levels have a sever

    Jan 1, 1995

  • CIM
    Factors That Affect Cemented Rockfill Quality in Nevada Mines

    By David M. R. Stone

    Underground mining in the gold industry is gaining popularity in Nevada, and with it the use of cemented rockfill is becoming mainstream. Even with today?s high metal prices, however, mining companie

    May 1, 2007

  • CIM
    Mining strategy for the Retreat Zone at Noranda’s Bell-Allard mine

    By D. Ouellet, G. Gagnon, B. Simser, V. Falmagne

    The mining sequence at Noranda’s Bell- Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modelli

    Jan 1, 2004

  • CIM
    Application of advanced blasting technologies for large scale de-stress blasts at Brunswick mine

    By S. Chung

    Mining in highly stressed ground conditions has been an increasing challenge at the Brunswick mine. Over the past 30 years, two large regional pillars were established on the 1000 m Level to support t

    Jan 1, 2005

  • CIM
    The Sampling System of Courier 300 Analyzer

    By Tapio Leskinen

    "l. IntroductionA reliable sampling system is the basis for an on-stream analyzer. This was realized in Outokumpu company when the development work of the Courier 300 On-Stream X-ray analysis system w

    Jan 1, 1976

  • CIM
    Use of Twinned Drillholes in Mineral Resource Estimation

    "Drilling twinned holes is a traditional technique used for verification of intersections of high-grade mineralization, testing of historic data, or confirmation of drillhole data during geological du

    Jan 1, 2009

  • CIM
    Improving Fine Particle Gravity Recovery through Equipment Behavior Modification

    By Claude Deveau

    "Studies on the performance of Falcon batch type concentrators treating ultrafine tantalum at Tanco have revealed that very fine heavy minerals are concentrated within certain areas of the concentrate

    Jan 1, 2006

  • CIM
    Transforming Flow Sheet Design with Inert Grinding – the IsaMill

    By K. E. Barnes

    "The IsaMill was developed for fine-grained ores that required at least double the grinding efficiency of ball or tower milling to be economic. This was achieved, but in practice, the benefits of usin

    Jan 1, 2006

  • CIM
    Declarations and Access Control

    The common theme of these four objectives is declaration. Declaration tells the compiler that an entity exists and also provides the name and nature of the entity. Since everything you create has to b

    May 1, 2011

  • CIM
    Design Spans ? Underhand Cut and Fill Mining

    By Rimas Pakalnis

    This paper describes a focus of work presently being conducted at the Rock Mechanics Research Group at the University of British Columbia. The underhand method under consolidated fill ensures a high r

    Apr 1, 2005

  • CIM
    Visualization of Fine Bubbles and Their Role in Fine Particle Flotation

    By Wei Sun, Jaewon Choung, Zhenghe Xu, Zhangming Cui

    "High intensity conditioning has been demonstrated in a number of cases to enhance fine particle flotation. The improvement could be attributed to the enhanced formation of particle aggregates. Howeve

    Jan 1, 2006

  • CIM
    Fleet management system for underground mines (dd9c7c45-cd77-4292-966a-863f63e39c89)

    By R. Grimard, M. Gamache, L. -P. Bigras, P. Cohen

    This paper describes a real-time fleet management system for an undergroun mine. Dispatching, routing and scheduling are handled simultaneously, taking into account the mine status, operational constr

    Jan 1, 2004

  • CIM
    Corrélation génétique entre les roches granitiques et les dépôts de columbo-tantalite d?Issia, Centre-Ouest de la Côte d?Ivoire

    By Benjamin A. Allou

    La seule production de columbo-tantalite réalisée en Côte d?Ivoire est effectuée dans les éluvions et alluvions du gisement d?Issia, localisé au Centre- Ouest de la Côte d?Ivoire. Même si un lien dire

    May 1, 2003

  • CIM
    BC Mining and Implications of Climate Action

    By Gavin C. Dirom

    ? The Mining Association of British Columbia (MABC) was established through an Act of Parliament in 1901 ? The MABC represents the interests of B.C.?s ? Coal and mineral mining companies ? Smeltin

    May 1, 2008

  • CIM
    Operation of a High-Density Tailings Thickener

    By Ernie Doell, Trung Nguyen

    "In early 1995 Cluff Mining commissioned a newly constructed high density tailings thickener at its Cluff Lake uranium mill. The 85 ft diameter high density thickener is one of the first of its kind i

    Jan 1, 1996

  • CIM
    Selective Highwall Mining at the Dome Open Pit Mine

    By J. G. Henning

    Following completion of planned mining operations at the Goldcorp Dome Open Pit Mine, a high-grade Shaft Pillar located in the pit highwall was recovered. Mining of this Shaft pillar faced numerous ro

    May 1, 2009