Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Continuing Education A Critical Question

    By J. H. Brown

    "THE need for continuing education has been recognized only in fairly recent years as a major concern of the engineering profession. Formerly, it was acknowledged that engineers were required, at leas

    Jan 1, 1966

  • CIM
    Human-Robot Integration for Pose Estimation and Semi-Autonomous Navigation on Unstructured Construction Sites

    By Chen Feng

    Compared to widespread successful deployment of robotic manipulators for repetitive and hazardous tasks in related industries such as manufacturing, the construction industry has achieved relatively l

    Aug 1, 2013

  • CIM
    Cadmium Extraction from the Ores of the Hudson Bay Mining and Smelting Co.

    By W. J. Stickney

    "Over-all recovery of cadmium has been increased at the plants of the Hudson Bay Mining and Smelting Co., Limited, since the construction of a slag fuming plant and baghouse where smelter flue dust is

    Jan 1, 1966

  • CIM
    Chapter IV-Continued - Part 2.-Nova Scotia - Structure of the Gold Veins of Nova Scotia

    By G. Vibert Douglas

    "Gold occurs in Nova Scotia in three ways, saddle reefs, fissure veins, and fossil placers. Of these the saddle reefs are the commonest. They have been the source of most of the gold and have also bee

    Jan 1, 1954

  • CIM
    Dynamic Tensile Failure of Rocks Subjected to Simulated In Situ Strsses Around Underground Openings

    By R. Chen, K. Xia

    In deep mining activities, blasting induced compressive stress wave would be reflected as tensile wave at a free surface around the openings, which would facilitate the tensile failure of the deep roc

    Jan 1, 2015

  • CIM
    Geology of the Cargill phosphate deposit iri northern Ontario*

    By PETER O. SANDVIK

    The Cargill deposit, located 32 km south west of Kapuskasing, Ontario, was discovered by International Minerals and Chemical Corporation in 1975 and has been evaluated through an extensive program of

    Jan 1, 1984

  • CIM
    Preliminary Implementation of a Predictive Control for Ventilation Systems in Metro Stations

    By M. Vaccarini

    In this paper a possible methodology to supplement a predictive control approach is reported. The benefits deriving from the application of a predictive control on complex buildings lay on its capabil

    Aug 1, 2013

  • CIM
    The Behavior of Iron, Silica and Germanium in the Goethite Process

    By M. Fujikawa

    The Kamioka Zinc Smelter was converted from the jarosite process to the goethite process in the year 2000. The reasons for the conversion of the process were that the silica content of the raw materia

    Jan 1, 2006

  • CIM
    Acoustic Emission Characteristics of Shale

    By Q. B. Li, B. Gonçalves da Silva, J. T. Germaine, H. H. Einstein, Z. Moradian

    "Shale gas and oil production has grown rapidly in recent years, and consequently there are increasing demands to understand the mechanical and microseismic properties of shale. Acoustic emission (AE)

    Jan 1, 2015

  • CIM
    A Continuum Damage Modeling Approach for Simulation of Hydraulic Fractures

    By A. Dahi Taleghani, A. Shojaei

    Continuum damage mechanics (CDM) of rocks is studied together with their elastic and plastic behaviors to develop simulation tools for hydraulic fracturing jobs in naturally fractured formations. The

    Jan 1, 2015

  • CIM
    Final Wall Stability in Metal Open Pit Mines Using Presplit Blasting

    By Kazem Oraee

    Implementing stable final pit walls in open pit mines during the open pit design phase and mine exploitation has become one of the most important concerns of mining engineers in recent years. Failure

    Aug 1, 2013

  • CIM
    A Revised Dipper-Ground Equilibrium Derivation for Shovels Operating in Oil, Sand, and Soft Ground

    By N. Shi, T. G. Joseph

    ABSTRACT A revised equilibrium approach to evaluate dipper-ground interactions during the dig cycle of ultra-class mining shovels operating in soft unblasted uniform ground conditions is presented. A

    Jan 1, 2012

  • CIM
    The Young Technical Graduate After the War

    By J. M. Turnbull

    THE primary objective of the young graduate, after the war, will be to obtain a suitable position within the Industry, with adequate pay and opportunity to advance. The positions available to meet thi

    Jan 1, 1943

  • CIM
    ICM / Minespace 2001 L'exportation De L'expertise Minière Canadienne Le 2 Mai 2001

    PROFIL D'ENTREPRISE Léandre Gervais & Associé(e)s est une société d'experts-conseils en ingénierie de la structure, de la mécanique & de la tuyauterie, et de l'électricité et de l&apo

    May 1, 2001

  • CIM
    Relationships of Minor Structures to Gold Deposition in Canada

    By Frank Ebbutt

    In this paper it is proposed to point out certain structural factors that; have an important bearing on gold deposition. The subject will be treated; more or less generally. Although the writer has ha

    Jan 1, 1954

  • CIM
    Controlling sulphide dust explosions in development blasting

    By Ron Jessulat

    "IntroductionBrunswick Mining and Smelting Corp. Ltd. is a IO 500 tid base metal producer. Development is carried out by Jarvis Clark MJM-21 3-boom development jumbos, using Tamrock E400, 410 and 550

    Jan 1, 1993

  • CIM
    Ore Handling Systems in Shafts

    By William James Kempson

    This paper discusses ore handling systems in shafts. These are considered from the loading facility at shaft bottom all the way through to the discharge mechanism in the headframe. These systems will

    May 1, 2013

  • CIM
    Working with Uncertainty in Adaptive Processing Optimisation

    "This contribution is concerned with adaptive processing decisions, where the process parameters are optimally adapted to the varying properties of the material input stream. Our starting point is the

    Jan 1, 2016

  • CIM
    Drag-Line Dredging

    By J. F. Magee

    THERE is nothing new about drag-line dredging for placer gold. The use of the separate unit for excavating preceded the large barge with bucket-line excavator mounted upon it, which has developed to a

    Jan 1, 1937

  • CIM
    Requirements for Paste Backfill Preparation in Narrow-Vein Mining

    By Alfred B. Annor

    The introduction and application of paste backfill over the past two decades has resulted in substantial benefits being realised by many backfill reliant mining operations who have used this technolog

    Oct 1, 2001