Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Maximising Return On Your Improvement Efforts

    By Gareth Barnes

    Traditional approach to improvement is driven by good ideas from good people, but whilst the business case may sound good, when the project is complete, we often have not delivered on expectations.  W

    May 4, 2025

  • CIM
    The Effect of Kyanite and SiC addition on Properties of Andalusite Based Low Cement Castable for using in Pig Iron Ladle

    By A. A. Nourbakhsha

    During the last few years, low cement castable refractories found more application in industry, because of good low and high temperature mechanical properties.In the case of alumina based castables ,u

    Oct 1, 2011

  • CIM
    Mineralogical and process controls on the oxidative acid-leaching of radioactive phases in Elliot Lake, Ontario, uranium ores: II – Brannerite and allied titaniferous assemblages

    By Roy O. Ifill, W. Charle Cooper, Alan H. Clark

    "Queen’s UniversityIn representative, run-of-mine samples from the Panel and New Quirke mines of the Elliot Lake uranium district, Ontario, brannerite, ametamict uranous titanate, occurs in microscopi

    Jan 1, 1996

  • CIM
    Development of a Softsensor for Particle Size Monitoring

    By René G. del Villar, Jules Thibault, René del Villar

    "Some key control variables of industrial processes, associated with product quality, often cannot be measured directly or frequently enough to establish adequate control. In such cases, it is possibl

    Jan 1, 1996

  • CIM
    In-Situ Resource Utilization

    By Larson. William

    What is Lunar In-Situ Resource Utilization (ISRU)? ISRU involves any hardware or operation that harnesses and utilizes ?in-situ? resources to create products and services for robotic and human expl

    May 1, 2009

  • CIM
    Forecasting Sag Mill Energy Consumption Using Gated Recurrent Units

    By S. Avalos, J. M. Ortiz, W. Kracht

    Semi-autogenous grinding mills are intensive energy consumers. Current models base their energy consumption inference on operational variables and feeding ore characterization. While they provide adeq

    Jan 1, 2019

  • CIM
    Environment and the public

    By Desmond M. Connor

    "The State of the EnvironmentRecent data from a State of the Environment report prepared in January 1991 and released in April (see references) , indicates that the physical and biological environment

    Jan 1, 1991

  • CIM
    Hydrostatic Elevation Difference Meter

    By H. J. Meyer

    "A hydrostatic elevation difference meter has been developed for use in measuring elevations along gravity traverses. Elevations of stations 100 feet apart can be obtained at a rate of 1/2 mile per ho

    Jan 1, 1972

  • CIM
    Mining in Canada - HR Challenges and Opportunities

    Overview of Presentation ?About MiHR ?Human Resources Challenges in the Minerals and Metals Industry ?Getting the Facts -Sector Study Project ?Key Findings ?Recommendations ?Conclusions ?Mi

    May 1, 2006

  • CIM
    Variation of gold content with depth the San Antonio gold mine

    By D. H. Whiting, A. J. Sinclair

    "The San Antonio gold mine, in the Archean Rice Lake Greenstone Belt, was in continuous production from 1932 to 1968, during which period the mine yielded 1.35 million ounces (41 985 kg) of gold and 1

    Jan 1, 1990

  • CIM
    A new innovation in rock support Friction Rock Stabilizers

    By James J. Scott

    "In the two years since their introduction, Friction Rock Stabilizershave replaced40 per cent of the previously used fixtures in the metal and non-metal mines in the United States. The Friction Rock S

    Jan 1, 1980

  • CIM
    Experimental Study on Comminution and Mineral Liberation of a Copper Ore by Interparticle Breakage

    By J. Y. Liu

    In Comparison to the application of HPGR (high-pressure grinding rolls) in the cement industry and in iron ore processing, the introduction of this energy-efficient comminution technology to processin

    Jan 1, 2016

  • CIM
    People, quality and processing improvement

    By L. M. Ame, W. D. Harwood

    "This paper outlines a management philosophy aimed at promoting employee involvement, quality and process improvement at Inco 's Thompson operations. It describes the use of statistical process c

    Jan 1, 1990

  • CIM
    A Standardized Method For Air-Drying Coal

    By E. Stansfield

    Coal samples are sometimes taken from a wet spot in a mine, or from an open car or pile shortly after rain, and submitted for analysis in a dripping wet condition. Other samples are taken from a dry s

    Jan 1, 1923

  • CIM
    Porous Plugs for Gas Purging in the Aluminium Industry

    By A. Kraly, M. Complojer, P. Paschen, K. Gamweger, H. Antrekowitsch

    Increasing quality of aluminium alloys and continuous optimization of the production process leads to an improvement of the gas purging systems. The application of porous plugs for the treatment of li

    Jan 1, 2006

  • CIM
    Analysis of Abrasive Wear During Machining Metal Matrix Composites

    By H. A. Kishawy, S. Kannan, M. Balazinski

    Metal Matrix Composites (MMCs) are new generation engineering materials that possess superior physical and mechanical properties compared to nonreinforced alloys. However, the presence of abrasive cer

    Jan 1, 2006

  • CIM
    Effect of Core Diameter on the Bond Impact Crushing Work Index Test (Phillips Enterprises LLC, DJB Consultants, Inc, Alex G. Doll Consulting Ltd )

    By R. Phillips, A. G. Doll, D. J. Barratt

    "The Bond low energy impact (crushing) work index test is specified to be performed on rock specimens between 50 mm and 75 mm in effective diameter. NQ-diameter drill core, frequently used in mineral

    Jan 1, 2012

  • CIM
    Using GIS to Monitor Geomechanical Condition of Rock Mass in Kryvbass

    By Vilkul Yuri

    Operation of the iron ore deposits of Krivbass which has been going for 130 years, has led to serious problems related to reaching great depths in open pit and underground mining. Extraction of the hu

    Aug 1, 2013

  • CIM
    Carbon Concentration Measurement and Control in a Counter Current Carbon Adsorption Circuit

    The control of carbon concentration in a counter current carbon absorption circuit is critical to optimise gold recovery. MINTEK has developed a carbon movement controller to address this potentially

    Jan 1, 2014

  • CIM
    Level and solids profile detection in thickeners using conductivity

    By A. Probst, J. A. Finch

    "Solids concentration (weight % solids) profiles and the clear liquid/slurry interface level (mud-line) were determined from conductivity measurements in thickeners at Falconbridge's Strathcona m

    Jan 1, 1994