Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Oxygen Mass Transfer Considerations for Cyanidation Reactors

    By G. Dubé, A. Leclerc, P. Quinn, G. E. Agar, J. Y. Clouthiér, J. D. McLaughlin

    "Gold dissolution by cyanide requires the presence of oxygen which is usually supplied by sparging compressed air into the gold containing slurry. For those ores that contain certain obnoxious substan

    Jan 1, 1993

  • CIM
    Session: Iron Removal from Metallurgical Liquors – II

    By C. Jewell, G. H. Rupay

    "67 - 2:15-3:00Regeneration of Hydrochloric Acid from Waste Pickle Liquor Using a Fluidized Bed Reactor System. G. H. RUPAY and C. JEWELL, Dominion Foundries and Steel Ltd., Hamilton, Ont.The disposal

    Jan 1, 2000

  • CIM
    Development of a Stable MnO2 Protective Layer on Lead-Based Electrowinning Anodes

    By Georges Houlachi, Akram Alfantazi, Michael Mahon, Maysam Mohammadi

    Corrosion resistance of the lead-based anodes directly influences the purity of the final product in the zinc electrowinning process. The anodic MnO2 layer that is electrodeposited on the anodes durin

    Jan 1, 2016

  • CIM
    The Plant Engineering and Maintenance Association of Canada

    By Norm Clegg

    The Plant Engineering and Maintenance Association of Canada PEMAC is a national, not-for-profit industry association for plant and facility maintenance, engineering and physical asset management in a

    Feb 1, 2008

  • CIM
    The Design of Long Horizontal Belt Conveyors

    By Zoltan F. Oszter

    The design of belt conveyors is a well-known procedure and related formulae can be found in any handbook dealing with materials handling. Belting and conveying equipment manufacturer's catalogues and

    Jan 1, 1962

  • CIM
    Post-War Problems of the Young Engineer

    By Geo. E. Cole

    A GREAT deal of time and energy is now being devoted to the study of post-war reconstruction and rehabilitation, in spite of the fact that as yet we have not won the war in which we are presently enga

    Jan 1, 1943

  • CIM
    Parametric BIM Objects Exchange and Sharing Between Heterogeneous BIM Systems

    By Yu-Min Cheng

    Over the past two years, the construction industry has increasingly recognized the benefits and capabilities of building information modeling (BIM) for information integration, visualization and param

    Aug 1, 2013

  • CIM
    Some Topics in Chemistry of Direct or Continuous Copper Converting (c58cda52-db06-40d1-9bd9-7d3af584bd3f)

    By K. Yamaguchi

    To contribute highly efficient and environmentally conscious copper smelting process, several topics in chemistry of the continuous converting were discussed. Through the reviewing the authors' t

    Jan 1, 2007

  • CIM
    Where Are We Going In This Hand Basket?

    By Lawrence Devon Smith

    What is a Failed Project? For mining projects, some key indicators of a ?failed? project are: ? Cost is more than it should be (particularly capital) ? Schedule ? It takes longer to build than exp

    May 1, 2010

  • CIM
    Distribution of the Saskatchewan Potash Beds

    By H. A. Gorrell, S. R. L. Harding

    "The potash beds in the Saskatchewan portion of the Williston Basin occur in the upper portion of the Prairie Evaporite formation of the Devonian Elk Point Group. They represent the late stage of a ma

    Jan 1, 1967

  • CIM
    Thermomechanical Characterization of AA5182, AA6111, AA3104 Aluminum Alloys y the Direct Chill Surface Simulator

    By D. Larouche, M. Mardan

    Hot tearing is a complex defect in aluminium castings which is produced during solidification when a certain amount of liquid phase remains and weakens tensile resistance of the alloy. In direct chill

    Jan 1, 2006

  • CIM
    Longwall mining methods applied to the Plains coal region

    By A. B. Szwilski

    "The various elements of longwall mine design are reviewed, particularly as they apply to condition s in the coalfields of the Plains region of Alberta. The following recommendations are made: (1) opt

    Jan 1, 1980

  • CIM
    Development of Mobile Inspection and Diagnostic System for Electric Power Conduit

    By Sang-Kyun Woo

    The electric power conduit (EPC) in Korea has been constructed since 1978. Facing the challenge of safety and sustainability of the EPC, it is urgent to develop an inspection strategy and maintenance

    Aug 1, 2013

  • CIM
    Design and Construction of a Unique Shaft Bottom Structural System for a Potash Mine

    By E. Nolasco, J. Ouellet, T. Tikka

    "Shaft bottom structural systems are used in underground mining to support transfer of personnel, equipment and ore to and from underground to the surface. This paper first summarizes the evolution of

    Jan 1, 2019

  • CIM
    A review of dry cover placement on extremely weak, compressible tailings

    By A. T. Jakubick, A. MacG. Robertson

    This paper reviews key issues related to the placement of dry (soil) covers on extremely weak, compressible fine tailings. The design and construction of soil covers on such tailings often presents a

    Jan 1, 2000

  • CIM
    Construction and Manufacture of Steel Wire Rope

    By G. C. Hodgson

    Specification and Tests of Rope Wire Chemical Analysis: The range in composition of steel used in the manufacture of wire rope is as follows: Carbon 0 4 to 0.9 per cent Manganese 0 4 to 0.8 Su

    Jan 1, 1931

  • CIM
    Wollastonite in eastern Ontario

    By A. MacKinnon, P. W. Kingston, W. F. Caley

    "Wollastonite (CaSiO3]) is experiencing increased usage in a variety of applications, such as fillers in paints, plastics and resins, as an extender to replace both non-fibrous and fibrous materials (

    Jan 1, 1989

  • CIM
    Applications of the Stability Lobes in the Optimization of Machining Parameters

    By H. Attia, S. Engin

    This paper presents a practical approach for determining the optimal spindle speed and the depth of cut in a milling operation within the ever-increasing economic and technical constrains. Analytical

    Jan 1, 2006

  • CIM
    Surface stabilization of tailing disposal areas at Wabush Mines, Labrador

    By Edgar L. Horner

    "The objectives of the Wabush Mines tailings stabilization program are to control dust Ii/t-off and to rehabilitate the disposal area. The evolution of the program started with test plots in 1970, the

    Jan 1, 1981

  • CIM
    Geotechnical Analysis and Design of Leaching Heap No. 2, Meydook Copper Mine, Iran

    By Z. Abbasloo, A. Masoomi, L. Ebrahimi, A. Mortazavi, A. Keshavarz

    "Investigation and 3D analysis of Heap no. 2 of Meydook copper complex was the subject of this study. In this project all geological and geotechnical investigations conducted in the mine were evaluate

    Jan 1, 2015