Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Quantifying Geotechnical Risk in the Mine Planning ProcessBy T P. Medhurst
In many cases mine design is the most important driver of the profitability of a mining project, however to reach an æoptimumÆ mine plan many compromises have to be made. Some of the fundamental profi
Jan 1, 2000
-
JK Drop Weight Parameters - A Statistical Analysis of their Accuracy and Precision, and the Effect on SAG Mill Comminution Circuit SimulationBy T J. Napier-Munn, T Perkins
The JK Drop Weight test was developed at the Julius Kruttschnitt Mineral Research Centre (JKMRC) in the early 1990s as a means of characterising ore for the purposes of AG/SAG mill and crusher modelli
Jan 1, 2008
-
Development of a Segmental Lining Specification for Steel Fibre Reinforced Concrete Flexural Strength Testing Using Round Panel TestsBy S Kost, R Nievergelt, F Cortes
In recent years, the use of steel fibre-reinforced concrete (SFRC) for segmental tunnel linings has become increasingly popular due to numerous advantages including durability, resistance to spalling,
Sep 17, 2014
-
Identity Crisis in the Copper Industry (dcdb222c-86b4-4eae-a24d-1e2dcb5e1879)Most publicity about the copper industry nowa- days is focused on the adequacy of ore reserves and on excessive mining capacity. These concerns, stemming from public awareness of actual and poten- t
Jan 1, 1978
-
Application of Block Caving System in the Tongkuangyu Copper MineBy Song Yongxue
During the design and operation stages of a block caving project, a large amount of research and development work has been undertaken in the Tongkuangyu Copper Mine. This paper presents the research a
Jan 1, 2000
-
Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South AustraliaBy B Cook, M Karakus, J Light, E K. Chanda
The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements
Mar 24, 2014
-
Effect of Vibration Sensor Mounting Method on the Quality of Vibration MeasurementsBy R Castedo, P Segarra, I del Castillo, L M. López, J A. Sanchidrián
This work investigates some suggested methods for blast vibration monitoring on a hard surface based on 53 tests on a vibration exciter. Errors in the measurement attributable to coupling have been de
Aug 24, 2015
-
Quantitative airblast risk assessments for block and sublevel cavesBy C Vejrazka1
The occurrence of airblasts is one of the principal mining hazards in caving operations between the time of cave establishment and breakthrough of the cave to surface. As such, it needs to be managed
Oct 12, 2022
-
Life cycle GHG emission considerations in overland conveyor designBy T Hicks
Designers of mining facilities play a significant role in defining the overall mine greenhouse gas emissions performance. This demands an appreciation of all the greenhouse gas emissions sources, incl
Sep 1, 2024
-
What is the Future for Magnetite Projects in Australia and Why Have Some of the New Projects Been So Problematic?By D Connelly
Magnetite orebodies generally means mining lower grade iron ores, crushing and grinding with significant energy costs in processing and the capital costs being significantly higher than for direct shi
Jul 13, 2015
-
How to select appropriate instrumentation to safeguard TSFs against credible failure modesBy P J. Chapman
Recent catastrophic failures of tailings storage facilities (TSFs) continue to highlight the need for a detailed understanding of failure modes and the defences that are in place within the design to
Jul 1, 2021
-
DeGrussa Copper Mine – mine closure experienceBy M Bellamy
The DeGrussa copper deposit was discovered by Sandfire Resources in April 2009. Construction of the 1.6 Mt/a concentrator, open pit and underground mining operations commenced in March 2011 with first
Mar 29, 2023
-
Parallel Implementation of a Tabu Search Procedure for Stochastic Mine SchedulingBy R Dimitrakopoulos, R Senécal
This paper presents a metaheuristic solution to the optimisation of open pit long-term production scheduling with a stockpile and geological uncertainty. The optimisation formulation is a two-stage st
Nov 24, 2014
-
The Influence of Inertisation Techniques on Gas InterpretationBy D M. Brady
Underground coal mines in Australia have embraced the use of various inertisation techniques both proactively and reactively. The use of such techniques can have a significant influence on ratios and
Jul 1, 2013
-
A Non-Technical Perspective to Collecting Consistent and Representative Samples in the Mining IndustryThere are many compelling reasons why correct sampling schemes should be standard practice in the mining industry, yet there are numerous examples where poor sampling practices are known to exist in t
Mar 1, 2010
-
Maintaining Sample Data Quality Through Robust Quality Assurance and Quality Control ProtocolsSuccessful evaluation and exploitation of resources and reserves relies on the collection of high quality sample data. The quality of the sample data must be maintained through the application of a ro
Mar 1, 2010
-
The Perseverance Gold Copper Deposit – A New Peak Mines ChallengeBy B Taylor
The Perseverance deposit is the most southerly known economic copper/gold deposit within the Cobar gold field. The deposit is situated approximately 12 km to the south-southeast of Cobar and is essent
Aug 22, 2011
-
Modelling of Mine Flooding in the Pittsburgh Coal Basin, USABy E Werner, J J. Donovan, A J. Morris
Coal mining in the Pittsburgh coal seam, in the eastern United States, began in the late-1700s. Since that time numerous mining technologies have been used throughout the basin. Environmental concerns
Jan 1, 2003
-
The Consultant Contribution to Major Australasian Mining and Mineral Processing ProjectsThe last decade has seen a dramatic change in the. size and complexity of mining and mineral processing projects in Austral- asia. Major projects of today are vastly different from major projects of
Jan 1, 1975
-
Highlighting Project Risk Following Completion of the Feasibility StudyBy C Gypton
This paper gives some insights into what to look for when reviewing feasibility studies. The review by a third party is an important element of the risk management process and may be the last remainin
Jan 1, 2003