Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Metro Rome Line “C” - Artificial Ground Freezing Application for the Underpass of the Existing Metro Station San Giovanni - Line “A”By Giulia M. B., Ferruccio Cribari, Alessandro Bertero, Eliano Romani, Roberto Sorge, Francesca Casini
"The use of Artificial Ground Freezing (AGF) to form earth support and seepage control barrier systems has had applications worldwide. These cover a variety of construction problems, including the for
Jan 1, 2016
-
Metro Rome Line “C”: Artificial Ground Freezing Application for the Underpass of the Existing Metro Station San Giovanni, Line “A” (88718b03-9244-4135-bce5-d10b55d2684f)By Salvatore Fancello, Ferruccio Cribari, Amerigo Tanzi, Mauro D’Angelo, Massimo Lodico, Alessandro Bertero, Eliano Romani, Tommaso Gondolini, Fabio Giannelli
"The new metro line “C” entails the construction and rehabilitation of 24 stations and 21,5 km of metro line, 13 of which carried out underground; the new metro line will improve the transportation sy
Jan 1, 2016
-
The Extractive Metallurgy of Agromined NickelBy William Hawker, James Vaughan, Jeff Chen, Antony van der Ent
"Nickel agromining utilizes hyperaccumulator plants (“metal crops”) to extract nickel from low-grade soils, a process that yields high-grade nickel bio-ore. This feedstock is further processed into a
Jan 1, 2016
-
Acid Leaching Zinc And Indium With Reduction Ferric Simultaneously From Marmatite And High-Iron Neutral Leaching ResidueBy Chang Wei, Fan Zhang, Zhigan Deng, Minting Li, Cunxiong Li, Gang Fan, Xingbin Li
Marmatite is an important resource of zinc, which exist in forms of high iron and high indium. In order to recycle the valuable metal from these ores, the testwork of simultaneous leaching on neutral
Jan 1, 2016
-
The Brenner Base TunnelBy Michael Rehbock-Sander, Romed Insam
"INTRODUCTIONThe idea of building a summit tunnel under the Brenner occurred to the Italian engineer Giovanni Qualizza as far back as 1847. But it was to be another 160 years to pass before a base tun
Jan 1, 2016
-
Use of Enhanced Pre-Mixed Self-Hardening Grout for an Emergency Cut-Off Wall Intervention in West AfricaBy Maurizio Siepi, Bruno Vingiani, Claudio Asioli
"The article describes an emergency rehabilitation intervention executed at Buyo Dam, in Ivory Coast, to intercept a significant water seepage occurring through the foundation of this zoned earthfill
Jan 1, 2016
-
Use of Numerical Modelling and GIS to Analyse and Share the Risks Related to Urban Tunnelling - Greater Paris - Red Line – South SectionBy Fatima-Zahra Houmymid, Elena Chiriotti, Mahdi, Samy
"The Greater Paris projects involves the creation of a 200km extension of the actual public transport network on the close outskirt of Paris. In 2011, SYSTRA has been awarded the Engineering studies o
Jan 1, 2016
-
Value-Engineering of H-Pile Foundations in Karstic GeologyBy Rachael M. Fischer, Daniel J. Woeste, Terence P. Holman
"A new 50 MW biomass renewable energy power plant was planned for construction in southwestern Georgia. The original foundation design consisted of very conservatively designed H-pile groups with vert
Jan 1, 2016
-
Unexpected Post-Excavation Damage to a 28"-Thick Segment Lining - Failure Mechanism and Rehabilitation MeasuresBy Jens Classen, Martino Gatti
"GENERAL PROJECT DATAThe Sparvo Tunnel is part of the “Variante di Valico” project, a new 65km (40mi) highway link between Bologna and Florence, designed to renew the existing A1 route which connects
Jan 1, 2016
-
Unified Specifications for Soil-Mixed Seepage Cutoff WallsBy Wayne S. Smith, Erik James, Jose R. Gomez
"Soil mixed seepage cutoff walls are increasingly being used in levee and dam modification projects nationwide. An important aspect of their overall quality depends greatly on the language included in
Jan 1, 2016
-
Washington Avenue Tunnel Project: Fortifying Aging Underground InfrastructureBy Andrew R. Klaetsch, Peter W. Deming
"The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th
Jan 1, 2016
-
Wadi Dayqah Dam CurtainBy Frank Haehnig, Harald Krenn, Harm-Christoph Claassen
"The Wadi Dayqah Dam Water Supply Scheme represents one of the most important projects implemented by the Sultanate of Oman to ensure sustainability of water resources. The principal components of the
Jan 1, 2016
-
UB Digs Deep and Builds Over Adjacent Subway for New Medical Building HubBy Lisa R. Papandrea, David Chen, Walter E. Kaeck
"Construction of the University at Buffalo’s new School of Medicine and Biomedical Sciences (UB-SMBS) required excavation in variable ground to a depth of more than 40 ft adjacent to the NFTA Metro su
Jan 1, 2016
-
Risk Assessment and Quality Control on Grouted Waterretaining Layers by Observational EngineeringBy Bartho J. Admiraal
"As part of the Schiphol-Amsterdam-Almere project, the largest aqueduct in Europe is being built in order for the A1 motorway to cross the Vecht River. The A1 consists of 12 lanes and the total width
Jan 1, 2016
-
Rock Excavation and Underpinning below a 19-Story BuildingBy Kevin P. Gleckler, Steven C. Highfill
"Escalators to access platforms for the Second Avenue Subway Station at 72nd Street in Manhattan are to be installed in the basement of an existing 19-Story residential building. The escalators, which
Jan 1, 2016
-
Rock Socketed Drilled Shafts for the Goethals Bridge ReplacementBy John P. Turner, Steven S. Dapp, Dan A. Brown
"The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY consists of a dual-span 1,982.5-ft long cable-stayed bridge with approach spans of
Jan 1, 2016
-
Screw and Straight Pile Behavior under Cyclic Compressive Loading in Dense SandBy Adnan A. Malik, Tadashi Maejima, Jiro Kuwano, Shinya Tachibana
"The helical piling system provides solution to many geotechnical related problems due to its quick installation, higher compressive and pullout resistance, no wastage of material, workable in limited
Jan 1, 2016
-
Seepage Barrier at Bolivar DamBy Mohamed Elgouhary, Carol L. Tasillo, Daniel Koziol
"The Bolivar Dam, located near the Village of Bolivar, Ohio is one of a system of dams designed to provide flood control and water conservation in the Muskingum Watershed. The Bolivar Dam is a “dry da
Jan 1, 2016
-
Seepage Barrier Mix Design Development, Installation, and EvaluationBy George W. Little, John Councilman
"The selection, evaluation, and modification of contractor mix designs for self-hardening seepage barriers, completed by the slurry trench excavation method, can be one of the most critical and challe
Jan 1, 2016
-
Settlement Evaluation of Large Water Storage Tanks Under Challenging ConditionsBy Ben M. Lewis, Yogesh Prashar
"The East Bay Municipal Utility District (EBMUD) is a major water utility service providing water to over 1.3 million people in the eastern San Francisco Bay Area. EBMUD manages 28 dams at 5 terminal
Jan 1, 2016