Search Documents

  • ISEE
    Engineering Control and Information Management of Blasting Programs in Construction and Quarrying Operations

    By Frank Sames, Brad Terhune

    In many construction projects and in most quarrying operations drilling and blasting remains the only feasible method of loosening rock in the removal of rock or overburden, the development of the qua

    Jan 1, 2004

  • CIM
    The use of Aircraft in Mineral Exploration and Development

    By G. C. Mackenzie

    At the last Annual Meeting of the Institute, Dr. C. V. Corless sketched the potential mineral wealth of Canada so clearly, graphically and with-all so entertainingly that one's imagination was fi

    Jan 1, 1924

  • NIOSH
    MLA 49-86 - Mineral Resources Of The Big Jacks Creek Study Area, Owyhee County, Idaho ? Summary

    By Richard A. Winters

    In 1985, at the request of the U.S. Bureau of Land Management, the U.S. Bureau of Mines studied 49,875 acres of the 54,833-acre Big Jacks Creek Wilderness Study Area (ID-111-7C) in order to evaluate t

    Jan 1, 1986

  • CIM
    The Design, Commissioning and Operation of the Golden Giant Paste Backfill Plant

    By Jim Dodd, Jim Paynter

    "We would like to acknowledge the efforts of the following key people who helped to make this project a success.Ron Jung, instrumentation supervisor for the Golden Giant Mine, spent many hours reviewi

    Jan 1, 1997

  • NIOSH
    RI 5555 Molybdenum Casting Development ? Summary

    By E. D. Calvert

    Molybdenum has been successfully cast into static and rotating molds in conventional equipment used for casting titanium and zirconium. Melting was accomplished by using an arc potential of 36 to 40 v

    Jan 1, 1960

  • NIOSH
    MLA 103-83 - Mineral Investigation Of The Little Sand Spring Wilderness Study Area (BLM No. CDCA-119), Inyo County, California ? Summary Statement

    By Michael S. Miller

    During U.S. Bureau of mines mineral investigations, in 1981 and 1983, no mines, prospects, or mineral resources were identified in the Little Sand Spring Wilderness Study Area (WSA). Placer gold value

    Jan 1, 1983

  • SME
    Quantifying and Monitoring Control Room Protection Factors against Respirable Dust at an Underground Crusher Booth

    By J. R. Patts, J. P. Rider, J. A. Organiscak, A. B. Cecala

    "NIOSH recently completed a 15-month study at an underground limestone mine crusher booth which evaluated three research parameters: (1) the effectiveness of a single-filter filtration and pressurizat

    Jan 1, 2017

  • NIOSH
    OFR-154-83 Validation And Extension Of Visibility Requirements Analysis For Underground Mining Equipment

    By Mark S. Sanders

    Six underground coal mine shuttle cars (three high seam and three low seam) were used to assess visibility using the concept of visual attention locations (VALs) and an improved human eye reference me

    Jan 1, 1983

  • AUSIMM
    The Mt Kasi Gold Mine, Fiji

    By G P. Taylor

    Mining Lease SML 57 was registered to Mount Kasi on 5 January, 1995. The Mount Kasi gold mine is located in Vanua Levu, Fiji's second largest island and operated from 1932 to 1946 producing 261,0

    Jan 1, 1995

  • SME-ICGCM
    Automated Monitoring Of Rock Slopes And Waste Dumps

    By Andrew G. Martin

    In 1991, Modular Mining Systems began marketing a Slope Monitoring System (SMS) now installed at twelve mines. The SMS uses automated wire line extensometers to monitor field conditions frequently. Ev

    Jan 1, 1996

  • AUSIMM
    Colorimetric Determination of Tungsten in Scheelite Ores and Mill Products

    Most analysts determining tungsten trioxide in low grade samples are aware that colorimetric procedures do not possess the inherent disadvantages of gravimetric methods operating on milligram quantiti

    Jan 1, 1958

  • SAIMM
    Behaviour of large-span rock tunnels and caverns under favourable horizontal stress conditions

    By X. H. Zhang, J. G. Cai

    This paper discusses the behaviour of large-span tunnels and caverns in hard rock in a major underground storage project. In-situ stresses were measured using hydraulic fracturing during site investig

    Jan 1, 2003

  • NIOSH
    OFR-17(1)-74 Develop, Assemble And Install A Permissible Surveillance And Communication System In The Bureau Of Mines Mining And Safety Research Center Coal Mine At Bruceton, Pennsylvania ? Volume I ? Systems Development - I. Introduction

    The purpose of this report is to describe the work accomplished by Mine Safety Appliances Company under Contract No. H0110845. This contract required the design, installation and testing of a permissi

    Jan 1, 1973

  • AUSIMM
    Some Notes on Gold Milling Practice in Bendigo

    This paper endeavours to lay as concisely as possible, before the members the salient features of local gold milling practice, and to point out in what respects this practice differs from that of othe

    Jan 1, 1902

  • AIME
    The Advance in Mining And Metallurgical Art, Science, and Industry Since 1875.*

    By William P. Shinn

    IT seems proper to present in the Transactions of the Institute, from time to time, formal record of the advances made in the arts and sciences to which our organization is devoted-milestones in the h

    Jan 1, 1881

  • CIM
    Canatuan Cu/Zn Flotation Metallurgy - Dealing with Zinc Pre-Activation

    By C. V. Umipig, G. G. Hutalle, E. E. Israel

    TVI Resource Development (Phils) Inc. Canatuan mine is a polymetallic ore deposit located in the Province of Zamboanga del Norte on the island of Mindanao in the Philippines. The deposit consisted of

    Jan 1, 2012

  • NIOSH
    OFR-202-82 Soil Depth Requirements To Reclaim Surface-Mined Areas In The Northern Great Plains

    By Richard C. Barth

    Fourteen field plots were established at active coal mines in the Northern Great Plains. A wedge was cut into spoil and backfilled with soil; soil depth ranged from 0 to 152 cm over a linear distance

    Jan 1, 1982

  • SAIMM
    Application Of Uni-Delay Shock Tubes In Development In Underground Mines - Synopsis

    By FJ Fourie

    This paper describes the concept and development of the use of a uni-delay shock tube system in the timing and initiation of the development rounds, specifically in flat development. It was extended f

    Jan 1, 2008

  • DFI
    A New Analysis Of Data From Statnamic Tests On Piles In Clay

    By William F. Anderson

    A series of pile load tests (maintained load tests, constant rate of penetration tests at different rates, and statnamic tests) was carried out on an instrumented model pile installed in clay beds pre

    Jan 1, 2006

  • IIMP
    Aportación al estudio y diseño de controladores avanzados, utilizando lógica difusa. Aplicación a hornos de fusión

    By Jorge Meza

    El presente texto señala el diseño de controladores en los hornos de fusión de concentrados de cobre a través de la lógica difusa. Para ello, se simuló dinámicamente el proceso de fusión de concentrad

    Sep 24, 2008