Search Documents

  • NIOSH
    OFR-113B-93 Coal Mine Injury Analysis: A Model For Reduction Through Training - Volume III: Mine Safety Management

    By R. V. Ramani

    One area of study in the Coal Mine Injury Analysis project was to illustrate and enhance the ability of mine safety management personnel to apply analytical techniques to injury experience data and to

    Jan 1, 1993

  • SME
    Utilization of lignite fly ash as hydraulic binder and backfill material

    By I. Gombköto, G. Földing, G. Mucsi, B. Csoke, J. Faitli, B. Kovács

    This paper summarizes the main achievements of our previous project entitled "Development of a technological system producing quality guaranteed fly-ash based binder". Furthermore, this study deals wi

    Jan 1, 2011

  • AUSIMM
    The Geology and Mineralisation of the Ladolam Gold Deposit, Lihir Island, Papua New Guinea

    By Ware AR, Doyle BJ, Hoogvliet H

    The Ladolam deposit lies within the altered volcanic rocks of the caldera floor, part of which now forms Luise Harbour. It was discovered in 1982 in the course of a reconnaissance drainage sedimen

    Jan 1, 1991

  • AUSIMM
    The Trend of Mine Ventilation Practice

    Since the last occasion on which I spoke to you on this subject there has been a considerable increase in the mechanical ventilation of Western Australian mines.The following table compares the figure

    Jan 1, 1941

  • AUSIMM
    Determination of the handleability index of adhesive bulk materials

    By M Carr, K Williams, W Chen, J Plinke

    The depletion of iron ore deposits at the face of the mine site dictates the necessity for the exploitation of formerly less attractive orebodies to meet the demand of the modern world. These orebodie

    Jul 24, 2017

  • AUSIMM
    Underground Mining Methods at Mount Morgan, Queensland

    OWING to two large falls of ground which resulted in serious accidents occurring towards the end of 1908, it became evident that the "open chamber" system then in use was unsuitable for the

    Jan 1, 1910

  • SAIMM
    Observed Spatial and Temporal Behaviour of Seismic Rock Mass Response to Blasting

    By K. Woodward

    "SynopsisSeismically active mines generally experience an increase in seismic hazard due to rock mass instability following blasting. Re-entry protocols commonly include measures to limit the spatial

    Jan 1, 2015

  • CIM
    Shaft hoisting system for Olympic Dam

    1. Scope of project In South Australia, the Western Mining Corporation operates the underground copper and uranium mine Olympic Dam. The deposits concerned are enormous (approx. 570 million tons) and

    May 1, 2003

  • AUSIMM
    Smelting Reduction and Direct Reduction of Iron Ores VAI Technologies for Scrap Substitutes (COREX«, FINMET«, FINEX«)

    By Bohrn W, Milionis K, Tessmer G, Reidetschlager J

    The share of electric arc furnace based steel production is increasing - New technologies for the production of virgin raw materials for EAF production are under development and on the market - VAI

    Jan 1, 1999

  • AUSIMM
    Underground Mining at the Golden Cross Mine

    The modern Golden Cross mine entered the production phase in January 1992. The project is designed to produce over 100 000 oz/yr of gold and over 300 000 oz/yr of silver during a mine life of eight ye

    Jan 1, 1994

  • AUSIMM
    Dynamic Trial of an On-Stream Analyser for Iron Ore Fines

    By Messenger A. J, Miles J. G

    A thermal neutron irradiation technique using a mCf neutron source has been developed and applied to thp.simultaneous determination of iron and aluminium (expressed as AI2O3) in iron ore fines (-6 mm

    Jan 1, 1980

  • SME
    Investigation of Microwave Exposure on Beneficiation of Low-Grade Banded Iron Ore Mining, Metallurgy and Exploration

    By Nikhil Dhawan, Shrey Agrawal, Veeranjaneyulu Rayapudi

    India’s steel vision of 2030 requires a huge amount of quality iron ore. The utilization of low-grade iron ores such as banded iron ores will play an important role to achieve the same production. The

  • AUSIMM
    Unlocking the Value in Waste and Reducing Tailings – Magnetite Production at Ernest Henry Mining

    By J Siliézar

    The Ernest Henry Mine (EHM) is situated 38 km north-east of Cloncurry in the Mount Isa – Cloncurry mineral district of northwest Queensland. The EHM orebody is an iron oxide copper gold deposit with a

    Jul 11, 2011

  • AUSIMM
    Developments in the Design of Quarry Crushing Plants and Storage Bins at the Broken Hill Proprietary Co. Ltd.

    The changes in layout and design over 48 years, from the first crushing and shiploading plant installed at Whyalla in 1915, up to the present plant being built at Koolan Island, Yampi Sound may be sum

    Jan 1, 1963

  • TMS
    Simulation of The Moulds Filling by the Finite Elements / Control Volume Method During RTM Process

    By J. Samir

    The objective of this study is to simulate the isothermal filling up of moulds by a RTM process when adopting CV/FEM and VOF method and when also taking into account the presence of obstacles coupled

    Jan 1, 2009

  • AIME
    Coal - Basic Study of Internal Vertical Stress Distribution in Confined Bulk Solids

    By W. J. Verner, J. R. Lucas

    Billions of tons of bulk solid materials are processed through our industrial plants each year, and the tonnage is steadily rising. It has been estimated that for every dollar spent in industry as a w

    Jan 1, 1961

  • NIOSH
    IC 8120 Columbium And Tantalum - A Materials Survey ? Introduction And Summary

    By William R. Barton

    COLUMBIUM (niobium) and tantalum are similar refractory metals with closely related properties and uses and close association in ore deposits. Until recently both metals, particularly columbium, were

    Jan 1, 1962

  • CIM
    Truck Lift System

    ? CONSTRUCTION AND MINING COSTS ARE HIGH IN THE ARCTIC ? VERTICAL KIMBERLITE PIPES WITH HIGH STRIP RATIOS ? SITE SPECIFIC GEOMETRIC CONSTRAINTS ? OPEN PIT FOLLOWED BY UNDERGROUND MINING ? HIGH KIM

    May 1, 2003

  • SME
    Actual vs. Baseline Tracking During TBM Tunneling In Highly Variable Glacial Geology

    By Ulf G. Gwildis

    The Bright water Conveyance System includes 21 km of tunnels mined by two earth pressure balance Tunnel Boring Machines (TBMs) and two slurry TBMs. The probabilistic baseline approach defined in the G

  • SME
    Disc Cutting Tests On Dry And Saturated Sandstone: Muck As A Performance Estimator

    By M. Z. A. Bakar

    A series of full scale laboratory linear rock cutting tests was carried out with a long bladed single disc cutter (292 mm diameter, 11mm wide constant cross-section blade) on dry and water saturated s

    Jan 1, 2012