Search Documents

  • SME
    Annual Review 2005

    By F. Freme

    Coal production in the United States reached a record level in 2005, ending the year at 1.03 Gt (1,133.3 million st) according to preliminary data from the U.S. Energy Information Administration (Tabl

    Jan 1, 2006

  • SME
    Application Of Pressure Foam To Control Respirable Dust In A Longwall Mining Section

    By Sandip K. Mukherjee

    This paper describes the application of pressure foam to control respirable dust in a double-drum longwall mining section. The feasibility of passing an adequate quantity of pressure foam through the

    Jan 1, 1984

  • NIOSH
    OFR-99-80 Uranium-Phosphorus Chemistry And Extraction Of Uranium From Uraniferous Phosphorites

    By M. Shamsuddin

    Information on total estimated uranium reserves and domestic requirements have been collected, A survey has been made on the possibilities of recovery of uranium from low grade and complex ore deposit

    Jan 1, 1980

  • DFI
    Cut-Off Walls For Diamond Mining In The Arctic

    By Wolfgang G. Brunner

    A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to

    Jan 1, 2003

  • AUSIMM
    29th Annual Conference 1996 - Field Notes

    Greymouth River Dredge û Birchfield Minerals Ltd Blackwater Gold Mine û Macraes Mining Company Ltd Globe Progress Gold Mine û Macraes Mining Company Ltd

    Jan 1, 1996

  • CIM
    A MultiGaussian Approach to Assess Block Grade Uncertainty

    By Julián M. Ortiz

    Uncertainty quantification of a spatially distributed variable at any scale can be handled through geostatistical simulation. Large computation time, storage, and post-processing of the realizations a

    May 1, 2004

  • AUSIMM
    A Comparison of the Mechanism of Breakage in Full Scale and Laboratory Scale Grinding Mills

    By P. S. B. STEWART

    As part of a continuing study of mechanisms of breakage, the grinding at Nairne Pyrites Pty. Ltd. was traced by the addition of barytes and the results compared with parallel small scale laboratory te

    Jan 1, 1971

  • NIOSH
    Real-Time DPM Ambient Monitoring in Underground Mines

    By Hsin Wei Wu

    A real-time Diesel Particulate Matter (DPM) monitor has been developed on the basis of the successful National Institute of Occupational Health and Safety (NIOSH) designed Per

    Jan 1, 2010

  • NIOSH
    RI 9476 - Facility for Melting Residues From Municipal Waste Combustion: Design Criteria and Description of Equipment

    By Laurance L. Oden, Jack C. White, Alan D. Hartman

    The U.S. Bureau of Mines, under a Memorandum of Agreement with the American Society of Mechanical Engineers (ASME), established design criteria for a facility to field residues from municipal waste co

    Jan 1, 1993

  • NIOSH
    RI 8729 Building Seals by Pneumatic Stowing in Mine Closure Operations

    By Siavoljub D. Maksimovic

    The Bureau of Mines, through a cooperative agreement with Duquesne Light Co. of Pennsylvania, field tested a method of using pneumatic stowing of crushed limestone to construct seals in long-abandoned

    Jan 1, 1982

  • NIOSH
    RI 7065 Piezoelectric Pulsing Equipment For Shear Wave Velocity Measurements In Rock Samples

    By Francis X. Cannaday

    Equipment and techniques were developed with Bureau of Mines facilities for measurement in the laboratory of sonic shear wave velocity in variously shaped rock specimens in a wide range of sizes. A va

    Jan 1, 1968

  • NIOSH
    MLA 10-86 - Mineral Resources Of The North Fork Owyhee River Study Area, Owyhee County, Idaho

    By Andrew M. Leszcykowski

    In 1984, personnel from the U.S. Bureau of Mines examined 41,550 acres of the North Fork Owyhee River Wilderness Study Area for mineral resources. This study area, in southwestern Idaho, is underlain

    Jan 1, 1986

  • SME
    Adsorption Of Hydrolizable Cations On Hydrophobized Silica

    By S. Vivek

    An Atomic force microscope (AFM) was used to measure the surface forces between hydrophobic silica surfaces. The measurements were conducted in the presence and absence of Cu(II)species in solution

    Jan 1, 2003

  • NIOSH
    IC 6955 Smelting Ores In The Electric Furnace

    By R. S. Dean

    The possibility of cheap electric power for a number of mining areas in this country has suggested to many the idea of electric smelting of nonferrous ores in small units at or near the mines. The

    Jan 1, 1937

  • SAIMM
    Seismology And Slope Stability In Open Pit Mines

    By R A. Lynch, D A. Malovichko

    The implementation of routine real-time micro-seismic monitoring of open pit mine slopes has been discussed. Some examples of seismic arrays have been given, and a recommendation of suitable seismic

    Jan 1, 2006

  • SME
    Stages Of Economic Development And The Demand For Agricultural Minerals

    By M. C. Roberts

    As nations advance through various stages of economic development, the patterns of demand for minerals change. For example, as a nation develops from a subsistence economy through industrialization a

    Jan 1, 2001

  • CIM
    Factors Affecting Overall Effectiveness of Teleoperated Loading and Haulage Equipment in Underground Metal Mines (2f68619f-48ff-478c-8ed0-965317a4b56f)

    By Jacek Paraszczak

    Application of teleoperated and automated mobile equipment in underground metal mines represents a promising avenue to overcome some of the challenges facing the industry. This paper addresses the iss

    Oct 1, 2009

  • AUSIMM
    Findings from a transient electromagnetic trial for heat-affected coal

    By H J. Stedman

    A Transient Electromagnetic (TEM) geophysical survey was trialled in Bowen Basin Permian coal measures overprinted by Cretaceous intrusion. The trial’s intention was to compare whether TEM could asses

    Sep 20, 2017

  • AUSIMM
    A Model Study of the BHP New Zealand Steel Ironmaking Melter

    By C Garlick, O Gregory, H Rogers, B I. Winters, Z C. Ye

    BHP New Zealand Steel produces iron from titaniferous ironsand by a direct reduction process comprising multihearth furnaces/rotary kilns/electric iron melters. The electric iron melter is a six-in-li

    Jan 1, 1995

  • IOM3
    Mechanism of cut blasting

    By S. P. Singh

    The purpose of the cut is to provide a free face to which the remainder of a development or breasting round can break. The results of field testing in drifts and at a quarry face were used as a basis

    Dec 1, 1995